Sol_140P1521Q0029_Amd_0001.pdf
PDF 177 KB Posted
- Attached to
- Walnut Canyon NM - Repaint Elevated Water Tower Federal contract opportunity
- Solicitation number
- 140P1521Q0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1521Q0029_Amd_0003.pdf | ||
| Sol_140P1521Q0029_Amd_0002.pdf | ||
| Sol_140P1521Q0029.pdf | ||
| Attachment1_PriorExperience.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P1521Q0029 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PIA
Flagstaff AZ 86001-2694 1824 S Thompson St, Ste 200 NPS, IMR - Arizona MABO
05/19/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/12/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WACA repaint elevated water tower
The purpose of amendment one is to
1. Add FAR clause 52.228-11, Individual Surety - Pledge of Assets (Feb 2021) to NPS solicitation 140P1521Q0029. The FAR clause listed is in effect through Federal Acquisition
Circular (FAC) 2021-05 and available in full text at http://www.acquisition.gov/far/.
2. Provide responses to questions received on NPS solicitation 140P1521Q0029 and answers provided to date. See pages 3-4 for questions and answers.
Contractors are reminded that they must sign and submit all amendments with their quote.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Martin Hauch
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P1521Q0029/0001
All other terms and conditions remain the same.
Quotes must be received by 1700 ET on 06/14/2021.
All quotes must be submitted electronically to cecilia_mitchell@nps.gov.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Q1: What is the approximate height of the tower?
A1: The height of the water tower is 100 feet.
Q2: It does not look like there is a Bid Bond that needs to accompany the Bid. Would you please confirm that that is correct?
A2: You are correct. A bid bond is not required for quotes provided in response to NPS solicitation 140P1521Q0029.
Q3: Can you please provide the height for the tower and a stand still front photo.
A3: The height of the water tower is 100 feet.
Q4: Are water and electricity available for the contractor. Are there restrooms available?
A4: Regarding water, electricity, and restrooms, please refer to “Use of Government Facilities” on page 26 of the solicitation.
Q5: There is not a spec for the paint system, only mention that it should meet the weathering requirements of AWWA OCS-4 and weathering requirements of AAMA 2604. OCS-4 just calls for a 3 coat system - zinc rich primer, aliphatic urethane intermediate coat, & flourourethane finish coat according to the AWWA book.
The paint manufacturer says that since there Is not a requirement to blast the exterior and only going with a SSPC-SP2 surface prep, the above-mentioned system isn’t the best method. It’s doable, but there are options that fit the stated surface prep better. We are assuming that there is no requirement to blast it because the likelihood there is lead and this allows doing the repainting without the possible requirement of containment. He suggested instead doing an epoxy primer like Macropoxy 920, intermediate coat of Macropoxy 646, and a polyurethane finish of Acrolon Ultra. This doesn’t fit the AWWA OCS-4 from my understanding as it doesn’t include the zinc and is a polyurethane vs. a flourourethane finish. Could you get us some guidance if you would be acceptable to this if we could furnish a letter from our rep with our bid?
A5: The paint system described is acceptable.
Q6: It does not seem to be mentioned as to the size or any dimensions for the tank.
Will need to find out the capacity and height to LWL so we can get an accurate surface area.
A6: The tank size is 100 feet tall and holds 50,000 gallons.