140P1224Q0093_Specifications.pdf
PDF 462 KB Posted
- Attached to
- 1500Ton 3/4" CDOT CLASS 6 ROAD BASE - ROMO Federal contract opportunity
- Solicitation number
- 140P1224Q0093
About this file
This document is a Statement of Work (SOW) for a firm fixed commercial services contract to purchase and deliver 3/4" CDOT Class 6 Road Base material to Rocky Mountain National Park in Estes Park, Colorado.
The purpose is to provide road base material for shoulder stabilization and repairs to gravel roads within the park. The contractor will be required to deliver 1,500 tons of the specified road base material to the park's maintenance yard during the period of mid-August to the end of September 2024. The material must meet detailed gradation and quality requirements, and the contractor must provide a physical sample for approval prior to delivery. The government will designate the delivery location and provide a suitable area for dumping the loads. The contractor is responsible for providing the trucks, equipment, and drivers necessary to deliver the material, and must comply with all park rules and regulations, including speed limits and equipment inspection requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1224Q0093.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Rocky Mountain National Park
Purchase and Delivery of Road Base
7/23/2024
1.0 INTRODUCTION
Contract Term and Type:
The government is awarding a firm fixed commercial services contract.
Purpose:
Rocky Mountain National Park is located on the west side of Estes Park, CO. The address is 1000 Hwy 36
Estes Park, CO 80517.
This is a supply and delivery contract for 3/4” CDOT Class 6 Road Base delivered annually to Rocky
Mountain National Park maintenance pit beginning in August.
Description of Purchase:
This is a purchase of road base material to be used for shoulder stabilization and repairs to gravel roads.
The park reserves the right to reject any material that is not suitable for the use of road base. The vendor will supply and deliver the material to Rocky Mountain National Park as designated by park representative/Contracting Officer Representative (COR). Delivery of the material must be completed by the last week of September. The material will be approved by the COR upon delivery.
2.0 KEY ASSUMPTIONS
The contractor shall deliver material during regular business hours.
Contractor shall submit a physical sample (1 gallon bucket or Ziploc bag) of material and the location of where the material is coming from to the COR for approval before making any deliveries.
The NPS will reserve the right to reject any material that is deemed unsuitable for use.
3.0 SELLER RESPONSIBILITIES
THE CONTRACTOR WILL REQUIRE THEIR DRIVERS TO OBEY ALL SPEED
LIMITS, ALL LOCAL LAWS DICTATING LOAD CAPACITIES, AND DRIVE IN A
SAFE DEFENSIVE MANNER AT ALL TIMES.
No deliveries will be allowed on weekends or holidays due to heavy visitation. Location hours of operation are 0630-1630 Tuesday through Friday from May through October.
3.1 Location:
The contractor shall deliver the material to Rocky Mountain National Park Maintenance yard pit area
1000 Hwy 36, Estes Park, CO 80517. Location inside Rocky Mountain National Park shall be designated by the COR.
3.2 Task to Be Performed:
The contractor will provide the trucks, equipment, and drivers necessary to deliver material addressed in this scope.
The contractor will deliver material to location designated by COR inside Rocky Mountain National Parks
East Maintenance Yard pit area.
The contractor will dump each load on site in the area as directed by the government.
The contractor will have each load weighed and will leave each loads weight ticket in on site in the area directed by the COR.
3.3 Task to Perform by Buyer
The government will provide suitable area that includes ample space for turnaround and solid base for dumping.
3.4 Descriptions of Materials
The material shall be 3/4" CDOT Class 6 Road Base material suitable to stabilize shoulders and rebuild roadways.
Material shall be grey or brown in color. No variation of red or pink color material will be accepted and will be rejected where the contractor will be required to haul unacceptable material off site.
Material shall be free of weeds and organic materials. The government reserves the right to inspect the stockpiled material in place, at the supply pit location, prior to delivery to ensure this requirement is met.
Material shall pass one of the following gradations:
Table 703-2
CLASSIFICATION FOR AGGREGATE BASE COURSE
Sieve Size
Mass Percent Passing Square Mesh Sieves
LL not greater than 35 LL not greater than 30
Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7
150mm (6") 100
100mm (4") 100
75mm (3") 95-100
60mm (2 ½") 100
50mm (2") 95-100 100
37.5mm (1.5") 90-100 100
25mm (1") 95-100 100 100
19mm (3/4") 50-90 95-100
4.75mm (#4) 30-65 30-50 30-70 30-65
2.36mm (#8) 25-55 20-85
75 m (#200) 3-15 3-15 20 max 3-12 3-15 3-12 5-15
NOTE: Class 3 material shall consist of bank or pit run material.
The contractor shall provide COR with documentation of sieve analysis before any material is delivered.
3.5 Quantities
1500 tons of CDOT Class 6 Road Base is to be delivered to Rocky Mountain National Park Maintenance yard pit area (anticipated delivery of Mid-August to be completed by end of September 2024).
All quantities ordered under shall be delivered at the original quoted price.
3.6 Period of Performance
Mid-August to End of September 2024.
4.0 Responsibilities of the Government
Designate location for material location upon delivery.
Stockpile management will be provided by the Government when necessary.
5.0 Project Completion Criteria
The purchase will be complete when all material is delivered and accepted by the Government.
6.0 Additional Terms and Conditions
A physical sample of the road base aggregate shall be provided and approved by the COR prior to acceptance and approval of delivery. The quarry or pit location of the sourced material shall be communicated with submittals for approval. The COR reserves the right to reject any subsequent delivery of product that does not meet this specification or is otherwise unsuitable for use. The supplier will be responsible for completely removing from the project site any product that is rejected by the
COR.
The contractor shall adhere to all park requirements, rules, and regulations and posted speed limits within all park boundaries.
Clean vehicles and construction equipment prior to entry into the Park to minimize the potential for introduction and/or proliferation of invasive non-native weeds through project actions. All vehicles will be inspected and approved by NPS prior to entering the park. Equipment not deemed clean by the COR will not be allowed to enter the park. The contractor remains liable for additional transportation costs incurred if equipment fails inspection.
File details come from the government source that posted it. Updated .