Questions_Addressed_0001.docx

DOCX document 193 KB Posted

Attached to
WFO CATTLE GUARDS Federal contract opportunity
Solicitation number
140L6224Q0054
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document is a set of questions and answers related to Solicitation 140L6224Q0054 for WFO Cattle Guards. The key details are:

The solicitation is for the supply and delivery of five 8'x12' cattle guard grids and five 12' cattle guard bases. The cattle guards must be designed to support HS-20 loading per the Statement of Work, though a stamped PE design is not required unless the contractor proposes a substantially different design. The grids and bases can be delivered separately. There is no incumbent contractor, and the solicitation does not include a formal bid form - contractors should bid per the provided bid schedule. Additional details are provided regarding the dimensions, specifications, and delivery requirements for the cattle guards.

View the file

Other files for this federal contract opportunity

Other files attached to WFO CATTLE GUARDS, newest first.
File Type Posted
Sol_140L6224Q0054_Amd_0001.pdf PDF
323153-1A_0001.pdf PDF
902881-5_Cattle_Guard_Base_(L-Block).pdf PDF
323153-1_Steel_Cattle_Guard_Grid_(with_and_without_Cleanout).pdf PDF
Sol_140L6224Q0054.pdf PDF
Bid_Schedule.xlsx XLSX spreadsheet
Cattle_Guard_SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMD 001

Questions Addressed Solicitation: 140L6224Q0054 WFO Cattle Guards

1. We wanted to see if there are any more specifications for the dimensions in the drawing highlighted (and attached)?

a. The drawing has been updated to include the missing dimensions. Please see the attached drawing 323153-1A.

2. Is this something that we would have to design to for the HS-20 loading (SOW - 2.1.1.C)?

a. Yes, please refer to the specifications Specific Requirements 2.1.1.C.

3. HS-20 loading refers to a tractor truck with a tandem axle semi-trailer with a dual-wheel load of 16,000 pounds. If so, would this need to be a stamped PE design?

a. No, design is not required to be stamped by a PE unless the contractor is proposing to supply a grid with a design that is substantially different from the drawings included in the solicitation.

4. Total number of cattle guards?

a. Per the bid schedule it will be five cattle guards. Bid schedule has a line item to bid the 8’X12’ Cattle Guard Grids and a line for the 12’ Cattle Guard Base.

5. Are we only supplying and delivering the cattle guards or are you asking us to install them as well?

a. The cattle guards will only be supplied and delivered.

6. Are the cattle guards all the same size?

a. Yes, please see bid schedule and specifications.

7. Does the information you emailed include a formal “tender bid” form or do we generate our own?

a. Please bid per the bid schedule provided.

8. Could you please mention the previous incumbent for the 12' long guard grid and 12' long guard base?

a. There is no incumbent for this requirement.

9. What was the qty ordered then and their price?

a. Please see bid schedule for quantity. Per the bid schedule it will be five cattle guards. Bid schedule has a line item to bid the 8’X12’ Cattle Guard Grids and a line for the 12’ Cattle Guard Base.

10. Can both parts be delivered separately?

a. Yes, grids and bases may be delivered separately.