Questions_-_Answers_0001.doc

DOC document 33 KB Posted

Attached to
RAINBOW GARDENS FENCE Federal contract opportunity
Solicitation number
140L3922R0017
Issued by
Department of the Interior Bureau of Land Management Nevada Region

About this file

This document contains questions and answers related to solicitation number 140L3922R0017 for the Rainbow Gardens Fence project. The Bureau of Land Management Nevada Region is seeking to install fencing and cables at the Rainbow Gardens site. Reflective tape must be placed between each fence post. The contractor will be responsible for complying with all local, state, and county regulations including obtaining any necessary dust or environmental permits from Clark County. The contractor must inspect equipment before mobilizing to ensure it is free of seeds, vegetation, and dirt and has no fuel or oil leaks. BLM will provide desert tortoise training materials that the contractor must review and follow regarding protection of the species. No hydrant or water source is available on site.

View the file

Other files for this federal contract opportunity

Other files attached to RAINBOW GARDENS FENCE, newest first.
File Type Posted
Sol_140L3922R0017_Amd_0001.pdf PDF
A04_SOW.pdf PDF
Bid_Schedule.pdf PDF
B03_DBA_Wage_Determination.pdf PDF
Sol_140L3922R0017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number 140L3922R0017 Rainbow Gardens Fence Questions & Answers

Q1) Please provide if a dust permit will be required from Clark County Air.

A1) It will be the contractors responsibility to comply with all local, state and federal regulations. The contractor needs to check with the County on what they will require. The County web site is: https://www.clarkcountynv.gov/government/departments/environment_and_sustainability/division_of_air_quality/permitting/applications_forms/dust_permitting_forms.php.

Q2) On page 6 of the SOW; B6.6 – 6” wide reflective tape. Is this required on the project? If so, is it desired between each post?

A2) Yes, reflective tape is required. Yes, place tape between each post.

Q3) What line item on the bid schedule would you like the cost of 6” tape?

A3) For the Base Option and Options 1 thru 3, please utilize the line for "Install Cables, Clamps, Reflectors"

Q4) Does BLM have a hydrant available for water near the site(s)?

A4) No.

Q5) Could a copy of the sign in sheet be posted?

A5) No.

Q6) Is a biological/archaeological monitor needed?

A6) No.

Q7) Will we need desert tortoise training prior to work/mobilization?

A7) BLM will provide a handout to the contractor. Training will consist of contractor crews reading, understanding and following BLM requirements identified in the handout regarding protection of the Desert Tortoise. Training can be done anytime between contract award and start of construction.

Q8) Will equipment need to be inspected by BLM prior to mobilization?

A8) The contractor will be required to inspect equipment before bringing equipment on site and self-monitor equipment during usage. Equipment needs to be free of seeds, vegetation, and dirt. Contractor shall not bring equipment to site with fuel and/or oil leaks. Refer to SOW Section D3.0 for additional information.

File details come from the government source that posted it. Updated .