Encl_2-Amended_Drawing_Sheets-Rev_1_0001.pdf

PDF 1 MB Posted

Attached to
EAGLE CREEK ROAD RECONSTRUCTION Federal contract opportunity
Solicitation number
140L2622R0008
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

This document package includes construction drawings and specifications for the Eagle Creek Road Reconstruction federal contract opportunity. The Bureau of Land Management Idaho Region is soliciting bids under solicitation number 140L2622R0008 to reconstruct approximately 15 miles of the Eagle Creek Road, which includes work items such as roadway excavation, culvert installation, drainage features, and signage. Bidders should reference the 49 drawings and specifications provided to understand the full scope of work required, including road alignments, typical sections, drainage details, and quantity takeoffs. The deadline to submit bids was not specified in this document package.

View the file

Other files for this federal contract opportunity

Other files attached to EAGLE CREEK ROAD RECONSTRUCTION, newest first.
File Type Posted
Sol_140L2622R0008_Amd_0002.pdf PDF
Eagle_Creek_Bid_Schedule_Amendment_0002_0002.pdf PDF
Pre-bid_tour-Rev_1_tjs_20220815_0001.pdf PDF
Sol_140L2622R0008_Amd_0001.pdf PDF
Encl_1-Amended_Bid_Schedule_and_Section_F_2_0001.pdf PDF
Drawings-Eagle_Cr_Rd-All_tjs_20220721.pdf PDF
SF-24_Bid_Bond.pdf PDF
FP-14_SS_Eagle_Cr_Rd_tjs_20220422.pdf PDF
Sol_140L2622R0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YIELDING FOUNDATION

D

D

D

ROCK FOUNDATION

TYPICAL BACKFILL DETAIL

ONE HALF INCH PER FOOT OF FILL ABOVE

TOP OF PIPE, 12" MINIMUM OR

3/4 D MAXIMUM.

12"12"

(D + 4') MINIMUM

2'

EMBANKMENT ABOVE THIS

HEIGHT SHALL BE COMPACTED

AS SPECIFIED IN SPEC. 204

12" MIN.

24" MIN.

MAXIMUM 6 INCH COMPACTED LAYERS USING

COMPACTION METHODS 6 AND 2 PER SECTION 209.

BEDDING SHALL BE SUITABLE MATERIAL, UNIFORMLY

COMPACTED AND SHAPED TO FIT THE BOTTOM OF

THE PIPE PER SECTION 209 OF THE SPECIFICATIONS.

METAL THICKNESS AND GAGE TABLES

STEEL

ZINC

COATED

UN-

COATED

ALUMINUM APPROX.

GAGE

Metal Thickness in inches 0.064 0.079 0.109 0.138 0.168 0.188 0.218 0.249

0.0598 0.0747 0.1046 0.1345 0.1644 0.1838 0.2145 0.2451 0.27580.280

0.060 0.075 0.105 0.135 0.164

GENERAL NOTES:

TREATMENT OF DAMAGED SPELTER: THE DAMAGED OR CORRODED ENDS OF METAL PIPE TO BE

EXTENDED SHALL BE REMOVED. IF THE DAMAGED END IS FLAME CUT, THE BURNED SPELTER ON THE GALVANIZED PIPE SHALL BE WIRE BRUSHED TO CLEAN METAL AND THE AREA SHALL BE PAINTED WITH TWO COATS OF PAINT, HIGH IN ZINC CONTENT, FOR REPAIR OF THE GALVANIZED SURFACES.

SETTLEMENT AND CAMBER: PIPES SHALL BE CAMBERED AS NECESSARY TO COMPENSATE FOR ANY ANTICIPATED SETTLEMENT IN THE FOUNDATION OR BED. CAMBER SHALL BE ON A PARABOLIC CURVE

WITH NO POINT ALONG THE INVERT BEING HIGHER THAN THE INVERT AT THE INLET.

EMBANKMENT AND FOUNDATION SOIL CONDITION CAMBER

EXISTING FILLS, REGARDLESS OF FOUNDATION SOILS

NEW EMBANKMENT

1% OF PIPE LENGTH, NOT

TO EXCEED 3/4 OF PIPE

SPAN.ROADLC

CAMBER

DWG SHEET NO.

OF

SHEET

9/2 8/1

8 0 7:

M

AR

KL

F

CA

D

ST

AN

DA

RD

S\

AG

EN

CY

S

TA

ND

AR

DS

\F

OR

ES

T

SE

RV

IC

E\

NF

S-

CT

B.

DW

G;

CHECKEDDESIGNERDATEDRAWING TITLEPROJECT NAME

United States Department of Interior Bureau of Land Management

NO. DATEBYREVISION DESCRIPTION

COTTONWOOD FIELD OFFICE

COEUR D'ALENE DISTRICT

EAGLE CREEK ROAD RECONSTRUCTION

STATE OFFICE

IDAHO SUMMARY OF QUANTITIES & CULVERT

INSTALLATION DETAILS

JUNE 9, 2022 TJ SYVERSON TE PARDY 8

S01

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text c

AutoCAD SHX Text h

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text F tsyverson Typewritten Text 1500 3221 tsyverson Line tsyverson Line tsyverson Typewritten Text 1 Amendment No. 1 - Prebid Tour tjs 8/12/22 tsyverson Polygon tsyverson Typewritten Text

DWG SHEET NO.

OF

SHEET

9/2 8/1

8 0 7:

M

AR

KL

F

CA

D

ST

AN

DA

RD

S\

AG

EN

CY

S

TA

ND

AR

DS

\F

OR

ES

T

SE

RV

IC

E\

NF

S-

CT

B.

DW

G;

CHECKEDDESIGNERDATEDRAWING TITLEPROJECT NAME

United States Department of Interior Bureau of Land Management

NO. DATEBYREVISION DESCRIPTION

COTTONWOOD FIELD OFFICE

COEUR D'ALENE DISTRICT

EAGLE CREEK ROAD RECONSTRUCTION

STATE OFFICE

IDAHO BASE ITEMS WORKLISTS 15 & 16

JUNE 7, 2022 TJ SYVERSON TE PARDY 16

W08

AutoCAD SHX Text

U.S. DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF LAND MANAGEMENT

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text a

AutoCAD SHX Text r

AutoCAD SHX Text c

AutoCAD SHX Text h

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text F tsyverson Typewritten Text

10.22 20405 Construct dip, 8% grade, 20˚ RFS. Dip Roadway Excavation. 28.0 Cubic Yard tsyverson Line tsyverson Line tsyverson Line tsyverson Typewritten Text 1 Amendment No. 1 - Prebid Tour tjs 8/12/22 tsyverson Polygon tsyverson Typewritten Text

1-ECR_Title_tjs_20220421-TITLE_signed_printed-REV
2-MAPS PROJECT_tjs_20220422-PROJECT MAP 1
3-MAPS PROJECT_tjs_20220422-PROJECT MAP 2
4-MAPS PROJECT_tjs_20220422-PROJECT MAP 3
5-MAPS PROJECT_tjs_20220422-PROJECT MAP 4
6-MAPS PROJECT_tjs_20220422-PROJECT MAP 5
7-MAPS PROJECT_tjs_20220422-PROJECT MAP 6
8-C-GROUP_tjs_20220609-SUMMARY QUANTITIES & CULVERT DETAILS-1
9-WORKLIST_tjs_20220607-WORKLIST 1&2
10-WORKLIST_tjs_20220607-WORKLIST 3&4
11-WORKLIST_tjs_20220607-WORKLIST 5&6
12-WORKLIST_tjs_20220607-WORKLIST 7&8
13-WORKLIST_tjs_20220607-WORKLIST 9&10
14-WORKLIST_tjs_20220607-WORKLIST 11&12
15-WORKLIST_tjs_20220607-WORKLIST 13&14
16-WORKLIST_tjs_20220607-WORKLIST 15&16
17-WORKLIST_tjs_20220607-WORKLIST 17&18
18-WORKLIST_tjs_20220607-WORKLIST 19&20
19-WORKLIST_tjs_20220607-WORKLIST 21&22
20-WORKLIST_tjs_20220607-WORKLIST 23&24
21-WORKLIST_tjs_20220607-WORKLIST 25&26
22-WORKLIST_tjs_20220607-WORKLIST 27
23-WORKLIST_tjs_20220607-WORKLIST 28&29
24-WORKLIST_tjs_20220607-WORKLIST 30&31
25-WORKLIST_tjs_20220607-WORKLIST 32&33
26-WORKLIST_tjs_20220607-WORKLIST 34&35
27-WORKLIST_tjs_20220607-WORKLIST 36&37
28-C-GROUP_tjs_20220422-TYPICAL SECTIONS-1
29-C-GROUP_tjs_20220422-TYPICAL SECTIONS-2
30-C-GROUP_tjs_20220422-TYPICAL SECTIONS-3
31-C-GROUP_tjs_20220422-REALIGN PLAN & POINTS
32-C-GROUP_tjs_20220422-REALIGN PLAN & PROF
33-C-GROUP_tjs_20220422-REALIGN SECTIONS-1
34-C-GROUP_tjs_20220422-REALIGN SECTIONS-2
35-C-GROUP_tjs_20220422-TURNOUT AND TURNAROUND DETAILS
36-C-GROUP_tjs_20220422-DRAIN DIP DETAIL
37-C-GROUP_tjs_20220422-CULVERT DETAIL
38-C-GROUP_tjs_20220609-DEWATERING TYPICALS
39-C-GROUP_tjs_20220422-CULVERT WITH CATCH BASIN DETAIL
40-C-GROUP_tjs_20220422-CATCH BASIN DETAIL
41-C-GROUP_tjs_20220422-OUTLET DITCH DETAIL
42-C-GROUP_tjs_20220422-CULVERT BAND DETAIL 1
43-C-GROUP_tjs_20220422-CULVERT BAND DETAIL 2
44-C-GROUP_tjs_20220422-CULVERT BAND DETAIL 3
45-C-GROUP_tjs_20220422-GATE DETAILS 1
46-C-GROUP_tjs_20220422-GATE DETAILS 2
47-BENTON MDWS PIT_tjs_20220422-ROCK PIT PLAN
48-C-GROUP_tjs_20220422-STAKING NOTES
49-C-GROUP_tjs_20220609-SIGN PLAN
ALL WORKLISTS_tjs_20220721.pdf
WORKLIST_tjs_20220721-WORKLIST 19&20
WORKLIST_tjs_20220721-WORKLIST 21&22
WORKLIST_tjs_20220721-WORKLIST 23&24
WORKLIST_tjs_20220721-WORKLIST 25&26
WORKLIST_tjs_20220721-WORKLIST 27
WORKLIST_tjs_20220721-WORKLIST 28&29
WORKLIST_tjs_20220721-WORKLIST 30&31
WORKLIST_tjs_20220721-WORKLIST 32&33
WORKLIST_tjs_20220721-WORKLIST 34&35
WORKLIST_tjs_20220721-WORKLIST 36&37

File details come from the government source that posted it. Updated .