This document contains questions and answers regarding solicitation number 140L0621R0009 from the Bureau of Land Management for the Bruneau Fire Station Phase 2 project. The solicitation seeks a contractor to complete several construction items including the fire station building with interior and exterior elements, concrete walkways and parking areas, a gravel drive and parking around the fire station, a landscape shed, premanufactured vault toilet, lawn and landscaping around the cabana, an RV area with gravel drive and walkways, gates and a hookup island, and pavement on Reniecke Road. The document clarifies that the contractor will be responsible for temporary power, water during construction, hiring third-party testing and inspection agencies, and acquiring necessary stormwater permits.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 8 Construction Details for Utility Shed_0001.pdf | ||
| Sol_140L0621R0009_Amd_0001.pdf | ||
| Attachemnt 6 Site Visit Sign in Rooster_0001.pdf | ||
| Attachment 4 DOL Wage Determination.pdf | ||
| Attachment 2 Drawings.pdf | ||
| Attachment 3 Geotechnical Report.pdf | ||
| Sol_140L0621R0009.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 5 Pricing Worksheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 140L0621R0009
Project Title: Bruneau Fire Station Phase II
Attachment 6 Contractor Q&A
1. Plan AF102, finish mark R3 calls for “Sheet Rubber Flooring” but no Specification was provided in Attachment 1 – Specifications. Please provide a specification for the “Sheet Rubber Flooring”.
Answer: Please refer to specification 096516 - RESILIENT SHEET FLOORING
2. It is unclear in the design drawings which items are Phase I and Phase II to be completed with solicitation 140L0621R0009, please clarify exactly which items are to be included with our proposal?
Answer: Please refer to Phase 2 drawings C101 & C102. Please note the utilities shown are as follows: Water, gas & sewer lines, installed underground with stubout withing 5 ft of building location. Electrical and communication conduits are installed with stubout within 5 ft of building location but no cable is present and Phase 2 contractor must furnish and install for any connections related to Phase 2. This includes communication cable connecting from fire station to crew quarters building. Phase 2 contractor must account for all situations encountered with installing cabling in the existing conduits and finishing the connections to phase 2 buildings and communication at crew quarters. Phase 1 Sheet
C102 & C103 below are only FOR REFERENCE and will not become part of the subsequent contract award.
3. Spec section Div. 21 Fire Protection: We see on the code analysis sheet GI-101 that there are no fire sprinklers on this project, however looking at the Spec ledger and spec section 211000 for (WATER-BASED FIRE-SUPPRESSION SYSTEMS) section submittals requirements calls for sprinklers. Please clarify exactly what is needed for the complete system?
Answer: Specification sections are written for Phase 1 and Phase 2 together. Some sections only apply to phase 1 or phase 2 and some to both. Phase 2 Does not include fire sprinklers for fire station building.
4. Plans E107 and E108 show data drops marked with AC, the Legend shows “AC” as a “3 port data faceplate mounted in ceiling run back to comm room.” Please confirm these (3) runs are intended to be Cat6, or provide further information if different types of cabling are needed in these areas (ie. Speaker wire, coax, etc.).
(We assume these locations are for security \ cameras, but we are not exactly sure why
(3) Cat6 cables are needed at each location).
Answer: AC, refers to “at or above ceiling” Per drawing, each “AC” data drop is 3 ports which is 3 CAT6A cables. Other locations are noted by the number unless blank which is 2 ports as a minimum per data drop.
5. Please confirm that Contractor must provide all temporary power and water as Idaho
Power will NOT have a transformer available for use by Contractor for the duration of the project, nor any well or hydrant will be available (for all intents and purposes).
Answer: Contractor is responsible for all power and water supply during construction due to the lack of power service at the site. BLM will not guarantee provision of electrical power or water supply prior to completion of project. Contractor must account for all needs of temporary power and water in bid submission.
6. Please confirm if a 3rd Party Building Commissioning agency is required as no specification was provided specifically for Building Commissioning.
Answer: BLM will perform 3rd party commissioning including architectural and mechanical systems / features.
7. A note on C103 states “Provide Pre-Fabricated Concrete or CMU Block 18’ x 20’ Utility
Shed as provided by CO. Contractor submittal will be required to match existing utility shed from Phase 1. . . “ No shop drawings or information was provided from Phase 1 so it is difficult to match without that information. Please advise.
Answer: Note states: “PROVIDE PREFABRICATED CONCRETE OR CMU BLOCK 18' X 20' UTILITY SHED AS APPROVED BY
CO. CONTRACTOR SUBMITTAL WILL BE REQUIRED TO MATCH EXISTING UTILITY SHED FROM PHASE 1. COORDINATE WITH E-101 FOR
POWER, PROVIDE FOUNDATION PER DETAIL 22/C503” Amendment 1 includes a copy of the design drawings from Phase 1 for CMU block building foundation, walls and roof. Construction details will be used for 18’ x 20’ Utility Shed. Phase 1 has selected CMU block building.
Please see Attachment 7 Construction Detail for Utility Shed (incorporated via
Amendment 1) for these attachments.
8. Please confirm that the Contractor is to engage with a 3rd Party Materials Testing &
Inspection agency for testing of materials and connections (ie. Steel, concrete, asphalt, compaction, etc.) and that the government will NOT be completing these inspections.
There are a handful of specifications that do not indicate responsibility for materials testing.
Answer: Yes, Contractor shall hire and schedule 3rd party materials testing and inspections for Quality Control of work completed.
9. Is the Phase 2 Contractor responsible for a Construction General Permit and Storm Water
Pollution Prevention Plan, even if a plan is in place for Phase 1 construction activities?
Answer: Phase 2 contractor is required to comply with all requirements and permits related to the areas of disturbance for Phase 2. Refer to specification 015000 -
TEMPORARY FACILIITES AD CONTROLS. Contractor is encouraged to review requirements provided by the US Environmental Protection Agency (EPA) and Idaho
Department of Environmental Quality (IDEQ).
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXX
X
X
X X
X X
X X
X X
X X
XXXXXXX
X
X
XXX
X X
X X
X X X X
SD
SD
SD
SDSDSDSDSD SDSDSD
SD
SD
SD
X
X
X
X
X
X X
X
X
X
X
X
X
X X
X X
X X
X X
X X
XXXXXXX
X
X
SDSDSD SDSDSSSDSSSSSS
X
X X
XXXXXXXX
SD
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXX
X
X
X X
X X
X X
X X
X X
XXXXXXX
X
X
XXXX
X X
X X
X X X X
SDSDSDSDSD SDSDSD
SD
SD
SD
SD
SD
SD
X
X
X
X
X
X X
X
X
X
X
X
X
EOA EOA EOA EOA EOA EOA EOA EOA EOA
EOA EOA
EOA
EOA
EOA
EOA
EOAEOAEOA
EOA
EOA
EOA
EOA
EOA
EOA
EOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOAEOA
EOA
FIRE STATION
(PHASE 2)
C R
EW
Q
U
AR
TE
R
S
RENIECKE ROAD
FILL STATION
CABANA
FILL STATION STAND PIPELP TANK PAD
UTILITY SHED
RETENTION BASIN
VAULT TOILET (PHASE 2)
LANDSCAPE SHED (PHASE 2)
PUMP HOUSE
DRAIN FIELD
TRASH ENCLOSURE
RV PADS
(PHASE 2)
TEMPORARY GRAVEL ROAD (PHASE 1)
OTHER GRAVEL AREAS (PHASE 2)
0'
R O
W
PHASE 1 IMPROVEMENTS:
1. ALL ROUGH SITE GRADING
2. SITE UTILITIES INCLUDING ALL UNDERGROUND (ELEC, SEPTIC, GAS, WATER, AND COMMS). INCLUDING
STUB OUTS TO RV PADS, FIRE STATION, CREW QUARTERS, LANDSCAPE AREAS, SHEDS, ETC.
3. ALL COMPONENTS FOR WATER SYSTEM INCLUDING PUMP HOUSE AND CONTROLS.
4. ALL COMPONENTS FOR SEPTIC SYSTEM INCLUDING COLLECTION AND DISPOSAL ELEMENTS AND
FENCING.
5. PROPANE TANKS AND COMPONENTS.
6. CREW QUARTERS BUILDING INCLUDING ALL INTERIOR AND EXTERIOR ELEMENTS.
7. PAVED PARKING AREA FOR CREW QUARTERS INCLUDING SIDEWALKS AND CONCRETE PATIOS.
8. CABANA STRUCTURE AND SIDEWALKS
9. PERIMETER FENCING AND ALL DRIVE AND PEDESTRIAN GATES, EXCEPT RV ACCESS DRIVE GATES.
10. ALL EXTERIOR LIGHTING.
11. FILL STATION INCLUDING UNDERGROUND STORAGE TANK, SHED, FILL STAND, CONCRETE SLAB AND
ACCESS ROADS.
12. ALL STORMWATER CONTROLS AND INFRASTRUCTURES INCLUDING RETENTION BASIN, SWELLS, AND
BERMS.
PHASE 2 IMPROVEMENTS:
1. FIRE STATION BUILDING INCLUDING ALL INTERIOR AND EXTERIOR ATTACHED INFRASTRUCTURE.
2. CONCRETE WALKWAYS, PARKING AREAS, AND APRON SLABS AROUND FIRE STATION.
3. FIRE STATION GRAVEL DRIVE AND PARKING AREAS AROUND YARD.
4. LANDSCAPE SHED.
5. PREMANUFACTURED VAULT TOILET.
6. LAWN AREA AND LANDSCAPE AROUND CABANA.
7. RV AREA INCLUDING GRAVEL DRIVE AND WALKWAYS, GATES, HOOKUP ISLAND (INCLUDING:
ELEC PEDESTAL, SEWER CONNECTION AND VAULT TANK).
8. RENIECKE ROAD PAVEMENT.
EXISTING WELL
Bryce Marsh Digitally signed by Bryce Marsh Date: 2020.08.05 12:21:21 -06'00'
PHASE 1
DRAWIN
GS
UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
X X
X X
X X
X X
X X
XXXXXXXXXXXXXXX
X
X
X X
X X
X X
X X
X X
XXXXXXX
X
X
XXXX
X X
X X
X X X X
SDSDSDSDSD SDSDSD
SD
SD
SD
SD
SD
SD
N35° 23' 53.43"E24.7' N18° 47' 16.74"E
120.3' N19° 35' 49.95"E
136.3' N19° 34' 58.89"E
157.3' N31° 18' 49.71"E44.0'
N24°
X
X
X
X X
X X
X
X
X
X
X X
W M
WMWMWMWMWMWMWMWMWMWM
WM
WM
W M
W M
W M
W M
W M
W M
WMWMWMWMWMWM
WM
SS
SS
SS
SS
SS SS SS SS SS SS
SS
SS
GAS
GAS
GAS
SD
GAS
G
AS
GAS
GAS
GAS
WM
W M
W M
W M
W M
W M
W M
WM
WM
WM WM WM WM WM
U G
C U
G C
U G
C U
G C
U G
C U
G C
U G
C
UGC UGC
UG
P
UGPUGPUGPUGP
U G
P U
G P
U G
P U
G P
UGP
UGP
UGP
UGP
UGP
UGP
UGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGP
U G
P U
G P
U G
P U
G P
U G
P U
G P
U G
P U
G P
UGPUGPUGPUGPUGP
UGP
UGP
UGP UGP
U G
P U
G P
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
U G
C U
G C
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGCUGC
UGP
UGP
U G
P U
G P
UGPUGPUGP
UGP
U G
C U
G C
UGP
UGP
UGP
UGP
UGP
U G
P U
G P
U G
P U
G P
U G
P
UGP
UGP
UGP UGP UGP UGP UGP UGP
C R
EW
Q
U
AR
TE
R
S
RENIECKE ROAD
SEPTIC DRAIN FIELD
CABANA
UTILITY SHED
PUMP HOUSE
10,000 GALLON BELOW GROUND
WATER STORAGE TANK
FILL STATION
PROPANE TANKS
REPLACEMENT DRAIN FIELD
1. FIRE STATION UTILITIES SHALL BE STUBBED AND CAPPED TO WITHIN
FIVE FEET OF THE PROPOSED BUILDING LOCATION AND MARKED
WITH A 60 INCH T-POST BURIED 12".
2. REFER TO ELECTRICAL DRAWINGS FOR SITE POWER, LIGHTING AND
CONDUIT SCHEDULE.
UTILITY NOTES:
FILL STATION
SERVICE
TRANSFORMER
TELECOM
VAULT
FIRE STATION
(PHASE 2)
EXISTING WELL
Bryce Marsh Digitally signed by Bryce Marsh Date: 2020.08.05 12:22:32 -06'00'
PHASE 1
DRAWIN
GS
File details come from the government source that posted it. Updated .