Questions_w_Answers_0002.docx

DOCX document 17 KB Posted

Attached to
Demolition - Laurel MD Federal contract opportunity
Solicitation number
140G0124Q0116
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This document contains Questions and Answers related to a federal contract opportunity for demolition services at two sites in Laurel, MD. The key details are:

The contract opportunity is for the demolition of the former Henshaw Lab and Quarters 80, a 1,000 square foot residential dwelling. This is a small business set-aside procurement under NAICS code 238910 Site Preparation Contractors, with a size standard of $19.0 Million. The solicitation number is 140G0124Q0116, and responses are due on April 15, 2024 at 2:00pm MT. The Q&A cutoff is April 11, 2024 at 2:00pm MT, and a site visit is scheduled for April 9, 2024 at 8:00am EST. The contract will be awarded by the US Geological Survey, Office of Acquisitions and Grants. The questions cover various requirements such as erosion control, parking lot repairs, fencing, utilities, asbestos abatement, and quality control.

View the file

Other files for this federal contract opportunity

Other files attached to Demolition - Laurel MD, newest first.
File Type Posted
Sol_140G0124Q0116_Amd_0002.pdf PDF
Sol_140G0124Q0116_Amd_0001.pdf PDF
Sol_140G0124Q0116.pdf PDF
Construction_Contract_Administration.docx DOCX document
Davis-Bacon_Act_WD_MS20240054.pdf PDF
Henshaw_and_Quarters_80_Demo_SOW_updated_12202023.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Sediment and erosion control is not detailed in the specs, specifically the drain at the lab. What are the requirements? Any parking lot drains should be protected by erosion controls.

At the Lab, the downspouts are buried. Does USGS know if they feed to dry well or stormwater? Is the contractor to include the buried sections of downspouts in the scope? Should the contractor cap and leave exposed? Cap and bury in place? Downspouts may be capped and buried in place.

Is a phase 1 environment plan required? No

Is the Lab parking lot to be removed? If not removed, does the contractor account for any repairs needed if the parking lot is damaged during the course of their work? I will discuss parking area with FWS and have an answer later today.

At both sites, what are the fencing requirements? The lab site is in very close proximity to an actively used building. No fencing requirements

Does USGS have the ability to allow an approved brick-only dump site at the refuge? Recycling is encouraged and containers may be staged on site to accommodate this process.

Will USGS be responsible for water, gas, sewer and electric shutoff? Yes

Are there existing telecommunication lines in the current building? Not active

Is there a required quantity for the slate tile removal? It is likely a high percentage of tile will break despite careful removal, but it is possible to remove the tile. There seems to be a high level of contractor interpretation in this requirement which could create a patent ambiguity. It is understood that a majority of the slate will be damaged in the removal process, so there is no expectation that a certain percentage will be salvaged.

Is there any map, plan, or drawing available for the known private utilities? We are attempting to locate the old plans.

Is there a requirement for a quality control manager? The USDA facility nearby requires one, but the USGS specs provided do not list one. No

If an onsite QC manager is required, what certifications are required? Example: USACE CQM N/A

Is a dedicated SSHO required? If so, what are the certification requirements? No

What is the requirement for slab and foundation removal at the lab, the SOW does specify Quarter 80 requirements. The requirements are the same for each structure. All vertical components of the foundation must be removed and the remaining slab shall be perforated every 4 feet, in a grid pattern, to allow for natural drainage.

Is the above ground fuel tank to be removed, located next to Quarters 80? Any fuel tanks are to be removed as part of the demolition process.

Is there any asbestos or hazardous material in the buildings? Abatement has been performed on both structures.

Is there restrooms onsite contractors can use? Contractor should provide temporary restroom facilities.

Is there any active existing utilities? No

Is the contractor responsible for cutting and capping any existing utilities? No