Sol_140G0121Q0080_Amd_0002.pdf
PDF 89 KB Posted
- Attached to
- PAINT, FLOORING & KITCHENETTE FOR ADMIN BUILDING Federal contract opportunity
- Solicitation number
- 140G0121Q0080
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A7 - COVID19 Non-Employee Checklist_0001.pdf | ||
| Sol_140G0121Q0080_Amd_0001.pdf | ||
| A3 - Release of Claims DI-137.doc | DOC document | |
| A6 - Payment Bond SF 25A.pdf | ||
| A1 - Statement of Work.docx | DOCX document | |
| A2 - Wage Determination WV20210037.pdf | ||
| A5 - Payroll WH-347.pdf | ||
| A4 - Statement and Acknowledgement Sf-1413.pdf | ||
| Sol_140G0121Q0080.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140G0121Q0080 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
GRB
RESTON VA 20192
12201 SUNRISE VALLEY DRIVE
205 NATIONAL CENTER
USGS OAG RESTON ACQUISITION BRANCH
04/21/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/30/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CONSTRUCTION PROJECT
U.S. Geological Survey, Eastern Ecological Science Center at 11649 Leetown Road, Kearneysville, WV 25430
Legacy Doc #: UGS
The purpose of this amendment is to provide answers to questions received and to extend the deadline for quotes to Monday, April 26, COB.
In addition, the bid guarantee amount shall be at least 20 percent of the bid price, or $3 million, whichever is less. (Refers to I.53. 52.228-1 Bid Guarantee)
QUESTIONS AND ANSWERS:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Kris Murray
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140G0121Q0080/0002
1. What is the microwave size or the opening size for the microwave ovens in the upper cabinets?
Standard size microwave
2. Do you have cabinet dimensions, or will the contractor select to infill the 149"? Contractor will select the infill.
3. What is the width of the countertop between the tall cabinets (for the coffee bar)? 72 inches
4. The rendering (A.2) shows crown molding on the upper and tall cabinets. Is this required? No, crown is not required.
5. The rendering shows the bulkhead above the cabinets removed. Is the bulkhead to be removed or left in place? Left in place.
6. In the bulkhead, there is a vent over the stovetop. Is the vent to be terminated or reconfigured? The vent is to be reconfigured.
7. The door by the entrance to the kitchen must be relocated to accommodate the new wall. Is the door handing to stay as-is or change? No change -the door is to stay as-is.
(end)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .