This document contains questions and answers from a pre-bid meeting for an electrical services project. The project involves work at two buildings located at a Fish and Wildlife Service refuge. Work includes replacing breakers and lighting installation. Bids are due by November 27, 2023 before 3:00pm. Refuge project managers will provide specifications for HVAC systems and advise on code compliance and approved lighting locations. One electrical panel will be installed in the second building. Exposed piping will be allowed for an exit circuit in that building.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Services - VA, newest first.
File Type Posted
Sol_140FC224Q0004_Amd_0001.pdf PDF
B08_Past_Performance_Survey.doc DOC document
Sol_140FC224Q0004.pdf PDF
Wages.pdf PDF
SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Arrival time Person Company

8:15 Lukas Faw

Integrated Power Generation, PO Box 2834, Salem, VA, ipgllcmanage@gmail.com

(540)598-4551

8:25 Chad Hinson

Craven Electrical Services, 464 Southlake

Boulevard, N. Chesterfield, VA 23236, chinsonces@gmail.com, (804)266-700, fax

(804) 562-2318

8:26 Abraham Ab and son (804)728-5472

8:25 Anthony Jardine

Wi-up electrical, (804)895-3439, ajardine@wiupelectrical.com

8:25 Maxwell Eanes

Buttner Electrical, www.buttnerelectric.com,

(757) 870-3629, ljbuttner@yahoo.com

Questions Answers

1. Where is the well, well pump, are there other well pumps on site? well pump is behind pump house. There are others but not part of this project

2. Are there code requirements?

3. Do we have to Buy Amercian?

4. Can we confirm the bid date?

5. Do we clean up the breaker box in Q1? Yes

6. Who tells us where the lights will be placed? on site staff

7. Do we need permits for the work?

8. There are different brands of breakers in Q1, do we replace the odd ones to provide name brand continuity?Yes, if possible

9. In Q2, can we get specs on the HVAC system? Yes once job has been awarded

10. Would you like 2 panels or 1 in Q2? One

11. Where will the exit lights go and they are provided by FWS right? Yes , at both building entrances

12. In Q2 is it ok for the exit circuit to have exposed piping?

, replace the odd ones to provide name brand continuity

There will be a contract clause, requiring goods be purchased via an American Distributer

Industry codes

Bids are due November 27, 2023 before 3:00pm

Refuge Project Managers to advise