This document contains questions and answers regarding solicitation number 140F1G24Q0004 for an intrusion detection system at Dulles Airport. The solicitation is seeking a contractor to install an IDS including sensors on doors, with one audible siren. Questions addressed installation details such as the size of backboards, responsibility for power installation, and the ability to arrange a site visit. Clarification was provided that the request is for one siren, and the response deadline was extended to allow time for a site visit. No further information is given on products or services required, pricing terms, or award dates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F1G24Q0004_Amd_0003.pdf | ||
| B08_Instructions_to_Offerors_and_Clauses_Update_1_19_24_0003.pdf | ||
| Sol_140F1G24Q0004_Amd_0002.pdf | ||
| B08_Instructions_to_Offerors_and_Clauses_0001.pdf | ||
| Sol_140F1G24Q0004_Amd_0001.pdf | ||
| Sol_140F1G24Q0004.pdf | ||
| A04_Dulles_Airport_IDS_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
file:///I/...In%20Solicitation/40643916%20-%20Dulles%20VA%20Security%20IDS/B%20--%20Solicitation/Q&A%20140F1G24Q0004.txt[1/10/2024 11:39:49 AM]
Q&A 140F1G24Q0004 - Intrusion Detection System (IDS) - Dulles,VA
Questions:
1. The 3/4'' back board is there size as in 4ft wide x 4ft high? (Large enough to secure the IDS Panel to): Yes
2. Is there existing power or is the contractor required to provide an electrician to install power? Not sure
3. Can a site visit be arranged? Yes, please see instructions to offers attachment for further details.
About the Facility Infrastructure
4. How old is the facility? Not sure
5. How stable is the power? Not sure based on the requirements for a new security system. There are outages, however they are planned.
6. Is there a dropped ceiling in all areas of installation? Yes
7. What type of walls are in the perimeter areas? Not sure
8. What type of walls is inside the offices? Not sure
9. Do we need to drill between the walls, to run our cable infrastructure? Not sure
10. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be? Not sure
11. Are the door frames metal and concrete filled? Not sure
12. How high is the ceiling? Not sure
13. Do you currently have existing IDS Sensors in your doors? No
14. Please specify which doors.
15. We are assuming that there are a total of five sirens to be installed according to the SOW, is that correct? (No, there is only 1 audible siren specified in the SOW)
16. We were questioning if the door frames are wood or aluminum? If you can please provide a breakdown of the frames, it would be greatly appreciated. Not sure
17. We are in touch with the manufacturer to get a quote for this opportunity is it possible if you can extend the due date for this opportunity so we can submit a quote on this opportunity. RFQ is extended and includes the opportunity to visit the site, please see instruction to offerors for details.