Sol_140F0718R0001_Amd_0002.pdf

PDF 6 MB Posted

Attached to
AMT TIGLAX SHIPYARD 2018 Federal contract opportunity
Solicitation number
140F0718R0001
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

140F0718R0001

View the file

Other files for this federal contract opportunity

Other files attached to AMT TIGLAX SHIPYARD 2018, newest first.
File Type Posted
Sol_140F0718R0001_Amd_0004.pdf PDF
Sol_140F0718R0001_Amd_0003.pdf PDF
Sol_140F0718R0001_Amd_0001.pdf PDF
Sol_140F0718R0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0718R0001 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F07

ANCHORAGE AK 99503-6199

1011 E TUDOR ROAD

FWS, DIVISION OF CONTRACTING AND GE

11/22/20170002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/14/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

LIST OF CHANGES:

Bids due date : 05-DEC-17 changed to 12-DEC-17

Date distributed : 14-NOV-17 changed to 22-NOV-17

This amendment adds clause 52.212-4 Limitations on Subcontracting, answers to questions received, pictures, drawings and updated task list.

All other terms and conditions remain unchanged.

Period of Performance: 02/01/2018 to 04/10/2018

00010 Tiglax shipyard maintenance & repairs Item 1:

Dry Dock and Lay Days in accordance with the

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anthony Kuntz

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002 attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 1:

Dry Dock and Lay Days in accordance with the attached Performance Requirements Task List.

Requisition No: 0040364023

Delivery: 04/10/2018

FOB: Destination

00020 Tiglax shipyard maintenance & repairs Item 2:

Administrative Costs & Temporary Services in accordance with the attached Performance

Tiglax shipyard maintenance & repairs Item 2:

Administrative Costs & Temporary Services in accordance with the attached Performance

Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00030 Tiglax shipyard maintenance & repairs Item 3:

Bottom Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 3:

Bottom Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00040 Tiglax shipyard maintenance & repairs Item 4:

Propeller and Shaft Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 4:

Propeller and Shaft Work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00050 Tiglax shipyard maintenance & repairs Item 5:

Rudder Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 5:

Rudder Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

00060 Tiglax shipyard maintenance & repairs Item 6:

Tail Shaft and Transmission Work in accordance with the attached Performance Requirements Task

Tiglax shipyard maintenance & repairs Item 6:

Tail Shaft and Transmission Work in accordance with the attached Performance Requirements Task

List.

Delivery: 04/10/2018

FOB: Destination

00070 Tiglax shipyard maintenance & repairs Item 7:

Freeboard Repaint in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 7:

Freeboard Repaint in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00080 Tiglax shipyard maintenance & repairs Item 8:

Topside Repaint in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 8:

Topside Repaint in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00090 Tiglax shipyard maintenance & repairs Item 9:

Main Deck Repaint below wooden deck boards in accordance with the attached Performance

Tiglax shipyard maintenance & repairs Item 9:

Main Deck Repaint below wooden deck boards in accordance with the attached Performance

Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00100 Tiglax shipyard maintenance & repairs Item 10:

Deck Equipment Repaint in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 10:

Deck Equipment Repaint in accordance with the attached Performance Requirements Task List.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

Delivery: 04/10/2018

FOB: Destination

00110 Tiglax shipyard maintenance & repairs Item 11:

Aft Stores Bilge Repaint in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 11:

Aft Stores Bilge Repaint in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00120 Tiglax shipyard maintenance & repairs Item 12:

Lazarette Repaint in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 12:

Lazarette Repaint in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00130 Tiglax shipyard maintenance & repairs Item 13:

Engine Room Bilge Repaint in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 13:

Engine Room Bilge Repaint in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00140 Tiglax shipyard maintenance & repairs Item 14:

Sea Chest Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 14:

Sea Chest Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00150 Tiglax shipyard maintenance & repairs Item 15:

Pressure Wash Bilges in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 15:

Pressure Wash Bilges in accordance with the attached Performance Requirements Task List.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

Delivery: 04/10/2018

FOB: Destination

00160 Tiglax shipyard maintenance & repairs Item 16:

Potable Water Tank Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 16:

Potable Water Tank Work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00170 Tiglax shipyard maintenance & repairs Item 17:

Ballast Tank Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 17:

Ballast Tank Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00180 Tiglax shipyard maintenance & repairs Item 18:

Black Gray Water Tank Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 18:

Black Gray Water Tank Work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00190 Tiglax shipyard maintenance & repairs Item 19:

Gas Tank Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 19:

Gas Tank Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00200 Tiglax shipyard maintenance & repairs Item 20:

Waste Oil Tank Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 20:

Waste Oil Tank Work in accordance with the attached Performance Requirements Task List.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

Delivery: 04/10/2018

FOB: Destination

00210 Tiglax shipyard maintenance & repairs Item 21:

Starboard Anchor Gear Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 21:

Starboard Anchor Gear Work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00220 Tiglax shipyard maintenance & repairs Item 22:

Center Anchor Work in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 22:

Center Anchor Work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00230 Tiglax shipyard maintenance & repairs Item 23:

Chain Locker Work in accordance with the attached

Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 23:

Chain Locker Work in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00240 Tiglax shipyard maintenance & repairs Item 24:

Hull UT Inspection in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 24:

Hull UT Inspection in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00250 Tiglax shipyard maintenance & repairs Item 25:

Aft Crane Remove, Rebuild and Reinstall in accordance with the attached Performance

Tiglax shipyard maintenance & repairs Item 25:

Aft Crane Remove, Rebuild and Reinstall in accordance with the attached Performance

Requirements Task List.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

7 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

Delivery: 04/10/2018

FOB: Destination

00260 Tiglax shipyard maintenance & repairs Item 26:

Port Light Spigot Remove and Replace in accordance with the attached Performance

Tiglax shipyard maintenance & repairs Item 26:

Port Light Spigot Remove and Replace in accordance with the attached Performance

Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00270 Tiglax shipyard maintenance & repairs Item 27:

Cargo Hatch Remove and Replace in accordance with the attached Performance Requirements Task List.

Tiglax shipyard maintenance & repairs Item 27:

Cargo Hatch Remove and Replace in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00280 Tiglax shipyard maintenance & repairs Item 28:

Aft Stores Hatch Remove and Replace in accordance with the attached Performance Requirements Task

Tiglax shipyard maintenance & repairs Item 28:

Aft Stores Hatch Remove and Replace in accordance with the attached Performance Requirements Task

List.

Delivery: 04/10/2018

FOB: Destination

00290 Tiglax shipyard maintenance & repairs Item 29:

Troubleshoot and Repair Marine Sanitation Device in accordance with the attached Performance

Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

00300 Tiglax shipyard maintenance & repairs Item 30:

Forward crane work in accordance with the attached Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

8 79

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0718R0001/0002

00310 Tiglax shipyard maintenance & repairs Item 30:

Sea Trials in accordance with the attached

Performance Requirements Task List.

Delivery: 04/10/2018

FOB: Destination

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

52.219-14 Limitations on Subcontracting.

As prescribed in 19.508(e) or 19.811-3(e), insert the following clause:

LIMITATIONS ON SUBCONTRACTING (JAN 2017)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Applicability. This clause applies only to.

(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants; and

(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for.

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.

(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.

(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.

(End of clause)

Questions and Answers

Purchase Request: 40364023

Solicitation: F0718R0001

1. What is the make and model of the engines?

Answer: Caterpillar 3412, 1200RPM, 425 hp each.

2. How many gallons of coolant should the contractor expect from each ME?

Answer: 110 gallons per engine.

3. What is the model and size keel coolers for ME?

Answer: Fernstrum DX1660d

4. What is the make and model of the generator engines?

Answer: John Deere 6076ATF

5. How many gallons of coolant should the contractor expect from each generator?

Answer: 55 gallons each

6. What is the model and size of the keel coolers for the generators?

Answer: Fernstrum D10156d

7. Is the contractor required to use the engine manufacturer’s recommended coolant?

Answer: No, the current coolant is Chevron ELC 50/50 mix

8. What style zincs are in the sea chest? Bolt on or welded?

Answer: Welded on 12”, 1 per chest.

9. Request drawings with sizes of shafting and prop components.

Answer: See attached

10. Request drawings with sizes of shafting and rudder components.

11. Request drawings with sizes of tail shaft components.

12. Request drawings with sizes of shafting components.

13. How many UT shots will the contractor take for the hull inspection?

Answer: 150 – 200 shots

14. What is the serial number of the aft crane?

Answer: Slattery model MCT 537, Serial # MCT-537-86-283

15. Request aft crane installation instructions.

Answer: N/A

16. Request technical publication for aft crane.

Answer: Will provide after contract award. Currently unavailable.

17. What size are the portlights?

Answer: 16#

18. What type of materials are the portlights?

Answer: Spigots ar 316SS (to be installed) Original spigots are mild steel and welded in

19. Are the spigots bolt on or welded?

Answer: Welded

20. What size and style is the cargo hatch?

Answer: Deleted from this solicitation

21. What size and style is the aft stores hatch?

Answer: 37” X 47” clear opening, 8” tall coaming, flush top.

22. What is the issue with the MSD?

Answer: Shuts down before completing cycle. No longer a requirement on this solicitation.

23. What brand and model is the MSD?

Answer: Evac Orca II-24

24. For the Dry-dock, is a “Travel-Lift” acceptable if the vessel is blocked according to the docking plan per specified vessel?

Answer: Not sure how a “travel Lift” works. A proposal that includes a “Travel Lift” will be considered subject to acceptance of this method.

25. Are each individual “price estimates” an estimate or actual bid?

Answer: The solicitation is amended to “BID”

26. What paint system is required in the chain locker?

Answer: Suggest it be the same as the holding tank.