REQUIREMENT FOR CONCRETE SUMP INSTALLATION AND 2 C Federal contract opportunity
Solicitation number
140F0619R0015
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

140F0619R0015

View the file

Other files for this federal contract opportunity

Other files attached to REQUIREMENT FOR CONCRETE SUMP INSTALLATION AND 2 C, newest first.
File Type Posted
Wage_Determination.pdf PDF
Concrete_SOW_revised.docx DOCX document
2019-06-21_Bozeman_Fish_Technology_Center_Structural.pdf PDF
Past_Performance_Questionnaire_Template.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040430966

FWS, DIVISION OF CONTRACTING AND GE

LAKE PLAZA NORTH

134 UNION BOULEVARD

LAKEWOOD CO 80228-1807

F06

TRACY MCCONNER

134 UNION BLVD

LAKEWOOD, CO 80228

Tracy Mcconner 303 236-4329

1x 08/02/2019

140F0619R0015

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

1. The government requires the installation of (1) Concrete Sump and (2) Concrete

Tanks poured on-site at the U.S. Fish and Wildlife Service, Bozeman Fish Technology

Center, Bozeman MT. See specification in SOW for dimensions.

2. The contractor shall furnish all labor, material and equipment necessary to install (1) Concrete Sump and pour (2) Concrete Tanks on-site at the U.S. Fish and

Wildlife Service, Bozeman Fish Technology Center, Bozeman MT. This procurement action is being solicited as a Small Business Set-aside. The NAICS code is 238110, Poured Concrete Foundation and Structure Contractors, Size Standard is $15.0. The estimated magnitude for this project is between $25,000 and $100,000. The performance period is 60 calendar days from the Notice to Proceed date. The Notice to Proceed date will be negotiated. This requirement is being procured in accordance with FAR Part 36, "Construction and Architect-Engineer Contracts" and FAR Part 15

"Contracting by Negotiation". A Firm Fixed Price award is contemplated from this solicitation with an award to the offeror providing the best value to the government, based on the evaluation criteria outlined in the solicitation.

Solicitation package number 140F0619R0015 includes the Solicitation Form (SF1442), Statement of Work, and Wage Determination as required. Contractors MUST be registered in the System for Award Management (SAM) in order to participate in this

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 60 calendar days and complete it within ________________ ________________ calendar days after receiving

IAW FAR 52.211-10

09/06/2019

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

FWS, DIVISION OF CONTRACTING AND GE

LAKE PLAZA NORTH

134 UNION BOULEVARD

LAKEWOOD CO 80228-1807

F06

Gregory Moore

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 38

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140F0619R0015 requirement. The SAM site can be found at https://www.sam.gov (this is a free service).

Payments will be made via Electronic Funds

Transfer using the data within the SAM registration database.

Buyer contact information for this requirement is:

Tracy McConner (Contract Specialist)

134 Union Blvd.

Lakewood, CO 80228

Tracy_McConner@fws.gov

(303) 236-4329

Project Manager:

Jason Ilgen (406) 579-9163

Jason_ilgen@fws.gov

All inquiries and questions shall be submitted in writing to tracy_mcconner@fws.gov. No verbal questions will be accepted. All questions should be submitted by 4:00 pm MST, August 19, 2019.

Legacy Doc #: FWS

Delivery: 07/12/2019

Delivery Location Code: 0008350047

FWS BOZEMAN FISH TECHNOLOGY CENTER

4050 BRIDGER CANYON ROAD

BOZEMAN MT 59715-8433 US

Period of Performance: 09/16/2019 to 11/18/2019

00010 Install 1 Concrete Sump and pour 2 Concrete Tanks on-site Bozeman FTC, 4050 Bridger Canyon Road, Bozeman, MT 59715-8433.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 4 of 38

A – Solicitation/Contract Form

See pages 1 through 4

B- Supplies or Services/Prices

Bid Schedule

Each Bid item shall include all cost for materials, labor, expenses, fees, and taxes plus permitting costs, overhead and profit associated with each bid item to construct the following areas of work in accordance with the specified documents. The unit costs shall include the costs for all construction disciplines (civil, structural, mechanical, electrical, control work, etc.) associated with the work area.

Concrete Sump Installation and Two Concrete Tanks Poured Onsite

Item Project Description Qty Unit Cost

1 Concrete Sump 1

2 Two Concrete Tanks formed and poured Onsite 2

2 Bonding 1

3 Overhead & Profit 1

Total Project Cost

END OF BID SCHEDULE

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 5 of 38

C - Description/Specifications

See Attached Statement of Work with Drawings

E – Inspection and Acceptance

52.246-12 Inspection of Construction (Aug 1996)

G – Contract Administration Data

Contracting Officer (CO) responsible for this contract:

Tim Officer U.S. Fish and Wildlife Service Contracting and General Services 134 Union Blvd Lakewood, CO 80228 Telephone Number: 303-236-4320 E-MAIL: Tim_Officer@fws.gov

Contract Specialist (CS) responsible for this contract:

Tracy McConner U.S. Fish and Wildlife Service Contracting and General Services 134 Union Blvd Lakewood, CO 80228 Telephone Number: (303) 236-4329 E-MAIL: tracy_mcconner@fws.gov

For site visits, contact:

Bozeman FTC POC:

Jason Ilgen 4050 Bridger Canyon Road Bozeman, MT 59715-8433 Work: (406) 579-9163 Email: Jason_Ilgen@fws.gov

The Contracting Officer may designate a Contracting Officer's Representative (COR) at the CO’s discretion. A Project Inspector may also be designated. The specific duties and responsibilities of the COR and Project Inspector will be furnished to the contractor, with their designation letter, at time of award.

Only a duly authorized Contracting Officer may change or modify the terms of this contract. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.

mailto:Tim_Officer@fws.gov file://ifw6ro-filesvr1/groups/cgs/TRACY%20MCCONNER/ACTIVE%20FILES/FY-18/PR%200040380073_RMA_Construct%20Parking%20Lot/tracy_mcconner@fws.gov mailto:Jason_Ilgen@fws.gov

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 6 of 38

All correspondence and submittals pertaining to the contract MUST be addressed to the Contracting Specialist, Tracy McConner at tracy_mcconner@fws.gov.

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements

– Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Invoice with a breakdown of the work completed.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Template)

DOI TEXT MESSAGING Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (October 2009)

Executive Order 13513, Federal Leadership On Reducing Text Messaging While Driving, was signed by President Barack Obama on October 1, 2009 (Ref:

http://edocket.access.gpo.gov/2009/pdf/E9-24203.pdf). This Executive Order introduces a Federal Government-wide prohibition on the use of text messaging while driving on official business or while using Government-supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately bans text messaging while driving company-owned or rented tracy_mcconner@fws.gov https://www.ipp.gov/ http://edocket.access.gpo.gov/2009/pdf/E9-24203.pdf

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 7 of 38 vehicles, government owned or leased vehicles, or while driving privately owned vehicles while on official government business or when performing any work for or on behalf of the government. (End of Clause)

I - Contract Clauses

52.204-1 Approval of Contract.

This contract is subject to the written approval of Tim Officer, Contracting Officer, and shall not be binding until so approved.

52.204-7 System for Award Management. (OCT 2018)

52.204-10 Reporting Executive Compensation and First- Tier Subcontract Awards

(OCT 2018)

52.204-13 – System for Award Management Maintenance. (Oct 2018)

(a) Definition. As used in this clause--

“Electronic Funds Transfer (EFT) indicator” means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

“Registered in the System for Award Management (SAM)” means that—

(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record “Active”.

“System for Award Management (SAM)” means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes.

It includes—

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 8 of 38

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12; and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

“Unique entity identifier” means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b) If the solicitation for this contract contained the provision 52.204-7 with its Alternate I, and the Contractor was unable to register prior to award, the Contractor shall be registered in SAM within 30 days after award or before three days prior to submission of the first invoice, whichever occurs first.

(c) The Contractor shall maintain registration in SAM during contract performance and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement. The Contractor is responsible for the currency, accuracy and completeness of the data within SAM, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in SAM after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in SAM to ensure it is current, accurate and complete. Updating information in SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(d)

(1)

(i) If a Contractor has legally changed its business name or ``doing business as'' name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to--

(A) Change the name in the SAM;

(B) Comply with the requirements of subpart 42.12 of the FAR;

and http://www.sam.gov/

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 9 of 38

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (d)(1)(i) of this clause, or fails to perform the agreement at paragraph (d)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims).

Assignees shall be separately registered in SAM. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the unique entity identifier is maintained with the entity designated at www.sam.gov for establishment of the unique entity identifier throughout the life of the contract. The Contractor shall communicate any change to the unique entity identifier to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the unique entity identifier does not necessarily require a novation be accomplished.

(e) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.sam.gov.

(End of Clause)

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 http://www.sam.gov/ https://www.sam.gov/

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 10 of 38 calendar days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

1452.201-70 Authorities and delegations.

As prescribed in section 1401.670-1, insert the following clause:

Authorities and Delegations (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories http://farsite.hill.af.mil/reghtml/regs/other/diar/1401.htm#P104_13583

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 11 of 38 defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause)

1452.204-70 Release of Claims. (JUL 1996)

1452.215-70 Examination of Records by the Department of the Interior. (APR 1984)

1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior. (APR 1984)

1452.228-70 Liability Insurance.

As prescribed in 1428.301, insert the following clause:

Liability Insurance—Department of the Interior (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:

$300,000 each person*

$1,000,000 each occurrence*

$150,000 property damage*

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or http://farsite.hill.af.mil/reghtml/regs/other/diar/1428.htm#P9_564

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 12 of 38 modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

(End of clause)

1452.211-71 CONTRACT WORK HOURS (NOV 2007)

The performance period established for this contract is based upon all work being conducted during regular working hours. Regular working hours are limited to the time between 7:30 AM MT and 4:30 PM MT, Monday through Friday, excluding Government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and Government holidays, a request must be submitted to the Contracting Officer Representative in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.

(End of Clause)

1452.236-70 Prohibition Against Use of Lead-based Paint. (JUL 1996)

52.211-13 Time Extensions (Sept 2000)

52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

52.219-14 Limitations on Subcontracting (JAN 2017)

52.219-28 Post-Award Small Business Program Representation (JUL 2013)

52.222-3 Convict Labor (JUNE 2003)

52.222-6 Construction Wage Rate Requirements. (AUG 2018)

52.222-7 Withholding of Funds (MAY 2014)

52.222-8 Payrolls and Basic Records. (AUG 2018)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 13 of 38

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of Segregated Facilities (APR 2015)

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for Each

Trade Goals for Female Participation for Each

Trade 3.3% 6.9%

These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor’s compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled “Affirmative Action Compliance Requirements for Construction,” and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade.

The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, Executive Order 11246, as

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 14 of 38 amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer’s identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the “covered area” is Bozeman FTC, Bozeman MT.

(End of provision)

52.222-26 Equal Opportunity (SEPT 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)

52.222-35 Equal Opportunity for Veterans (OCT 2015)

52.222-37 Employment Reports on Veterans. (FEB 2016)

52.222-50 Combating Trafficking in Persons. (JAN 2019)

52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015)

52.223-2 Affirmative Procurement of Bio based Products Under Service and Construction Contracts. (SEPT 2013)

52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997)

52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)

52.223-6 Drug-Free Workplace (MAY 2001)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.225-9 Buy American - Construction Materials. (MAY 2014)

BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 15 of 38

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR

2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace;

and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United

States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 16 of 38 of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b) (2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and http://uscode.house.gov/ http://uscode.house.gov/ https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2012_5.html#wp1077123

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 17 of 38

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______ Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information:

Include all delivery costs to the construction site and any applicable duty (whether or not

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 18 of 38 a duty-free entry certificate is issued).

52.225-10 Notice of Buy American Requirement—Construction Materials.

NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American— Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the

Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard61.html#wp1177057 https://www.acquisition.gov/sites/default/files/current/far/html/FormsStandard61.html#wp1177057 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273 https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1169273

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 19 of 38 evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity – Construction Contracts (DEC 2007)

52.227-17 Rights in Data -- Special Works (DEC 2007)

52.228-2 Additional Bond Security (OCT 1997)

52.228-5 Insurance -- Work on a Government Installation (JAN1452 1997)

52.228-11 Pledges of Assets (AUG 2018)

52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-13 Alternative Payment Protections. (JULY 2000)

As prescribed in 28.102-3(b), insert the following clause:

Alternative Payment Protections (July 2000)

(a) The Contractor shall submit one of the following payment protections:

1. Payment Bond

2. Performance Bond

(b) The amount of the payment protection shall be 100% of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

https://www.acquisition.gov/content/28102-3-contract-clauses#i1088607

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 20 of 38

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.228-15 Performance and Payment Bonds – Construction (OCT 2010)

Performance and Payment Bonds -- Construction (Oct 2010)

(a) Definitions. As used in this clause --

“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. The successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection.

(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 21 of 38

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:

U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/ .

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.

(End of Clause)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)

52.232-16 Progress Payments Alternate I (APR 2012)

52.232-23 Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management

(OCT 2018)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)

52.233-1 Disputes. (MAY 2014)

52.233-2 Service of Protest Department of Interior. (JUL 1996)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the http://www.fms.treas.gov/c570/

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 22 of 38

Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

U.S. Fish and Wildlife Service, 134 Union Blvd., Lakewood, CO 80228

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW., Room 6511, Washington, DC 20240.

52.233-3 Protest After Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor. (APR 1984)

52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)

52.236-10 Operations and Storage Areas (APR 1984)

52.236-11 Use and Possession Prior to Completion (APR 1984)

52.236-12 Cleaning Up (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.236-27 Site Visit Construction (FEB 1995)

14F0619R0015 Bozeman FTC Concrete Sump and Onsite Concrete Pouring Page 23 of 38

Site visits may be arranged during normal duty hours by contacting:

Name: Jason Ilgen Address: Bozeman FTC 4050 Bridger Canyon Road Bozeman, MT 59715-8433 Telephone: (406) 579-9163

(End of Provision)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (JAN 2019)

52.246-21 Warranty of Construction. (MAR 1994)

52.248-3 Value Engineering—Construction (OCT 2015)

52.249-2 Termination for Convenience of the Government (Fixed-Price) Alternate I

(APR 2012)

52.249-10 Default (Fixed-Price Construction) (APR 1984)

52.252-1 Solicitation Provisions Incorporated by Reference. (APR 2012)

SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.