About this file

Revised Page 5 - Price Schedule

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document No.

140F0618R0028 Document Title Lodgepole Fire Fence Rehabilitation – Charles M Russell NWR Revised

SECTIONS

A - Solicitation/Contract Form B - Supplies or Services/Prices

LODGEPOLE FIRE FENCE REHABILITATION @ CHARLES M RUSSELL NATIONAL WILDLIFE REFUGE

Description of work: Providing all labor, supplies and equipment to rehabilitate fire damaged existing fences in accordance with attached Statement of Work, Specifications, Drawings and Maps.

This project involves the rehabilitation of approximately 21 miles of existing fence (See Notes 1, 2, 3 and 4).

ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL AMOUNT

1 Mobilization & Demobilization 1 L.S. $___________ $_______________

21 Strand Smooth Wire Install21Mile$___________$_______________
32 Strand Barbed Wire Install (See Note 3)7Mile$___________$_______________

4 Corners 99 Each $___________ $_______________

5 Post End Brace 66 Each $___________ $_______________

6 Wire Gate w/Stays 27 Each $___________ $_______________

7 Stress Panel 82 Each $___________ $_______________

8 Drainage Crossings – Type 1 (See Note 4) 15 Each $___________ $_______________

9 Drainage Crossings – Type 2 (See Note 4) 4 Each $___________ $_______________

10 Single Steel Post with Brace 29 Each $___________ $_______________

11 General Labor (Grubbing, Clean-up, etc.) 21 Mile $___________ $_______________

12 Bonding (Rate per $1000.00 - ________) 1 L.S. $___________ $_______________

13 Overhead (Rate __________ %) 1 L.S. $_______________

14 Profit (Rate __________ %) 1 L.S. $_______________

Total Cost $_______________

1 Price per foot of fence (complete removal 1 Foot $___________ & replacement (minus the smooth bottom wire))

2 Single T-Post and Installation 1 Each $___________

NOTE 1: This price schedule is based on performing the entire 21 mile project and will be used for price competition. The proposal that is Lowest Priced Technically Acceptable for the entire 21 miles will receive an award. However, due to possible budget constraints, a negotiated, reduced scope contract may be issued to the contractor offering the successful proposal.

NOTE 2: All quantities are approximations. These values will be used for pricing purposes only. Payments will be made on actual measured quantities removed or installed.

NOTE 3: 2 Strand Barbed Wire Install – It is anticipated that only 30 percent of the 21 miles will require the barbed wire to be replaced. Of this, 1 or both wires may require replacement. For pricing purposes, assume that we will replace both wires over 7 miles. Field adjustments will be made to definitize the actual amounts replaced.

NOTE 4: See the attached Drainage Crossings sketches for a description of each type.