Sol_140A0524Q0003_Amd_0001.pdf

PDF 156 KB Posted

Attached to
Environmental Remediation in Eek, Alaska Federal contract opportunity
Solicitation number
140A0524Q0003
Issued by
Department of the Interior Bureau of Indian Affairs and Indian Education

About this file

This document contains an amendment to a solicitation for environmental remediation services in Eek, Alaska issued by the Bureau of Indian Affairs. The key services required include a site characterization of contaminated soils, installation of groundwater monitoring wells, collection of soil and water samples for laboratory analysis, and development of a remediation plan. Bidders should include costs to excavate and dispose of an estimated 330 cubic yards of contaminated soils above regulatory limits, as well as backfill and site restoration. The amendment provides answers to questions from interested vendors to clarify the scope of work. A separate task order process will be utilized for subsequent excavation and remediation work.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Remediation in Eek, Alaska, newest first.
File Type Posted
Sol_140A0524Q0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A0524Q0003 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

A13

Sacramento CA 95825 Contracting Office

2800 COTTAGE WAY ROOM W2820

BIA PACIFIC 00013

12/18/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/28/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 is to publicly release all questions that have been asked on the solicitation to date and the answers provided by BIA.

All interested parties submitting a quotation must complete blocks 8 and 15A-C of this

Amendment

AND INCLUDE the completed page 1 of this Amendment with their quotation.

All questions about this amendment and solicitation shall be emailed to jodi.zachary@bia.gov.

All terms and conditions of the solicitation remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jodi Zachary

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment # 1 140A0524Q0003, Eek Remediation:

1. Will excavation be covered under a separate phase?

Yes, excavation be covered under a separate phase.

2. Paragraph 1 of the Introduction mentions geotechnical investigation, but it is not mentioned again under Task 3. Should the bidder plan on mobilizing a drill rig to the site?

A geotechnical investigation will not be necessary.

3. A groundwater investigation was mentioned. Should the bidder include the cost of installing monitoring wells, if so, how many should be included in the cost. How many existing wells are on site that are in functional condition?

Yes, GWM wells will have to be installed. Discussions with AK DEC during planning will help guide the GWM, however BIA assumes 11 GWM wells in total—three uphill, three downhill, two on each side and one at the central point.

4. If monitoring wells are required to be installed, are temporary wells acceptable?

Yes, permanent monitoring wells will be required to be installed.

5. Due to laboratory turnaround times, it is unlikely analytical results will be available immediately at the conclusion of the site characterization. Should the bidder assume a second mobilization to excavate soils?

See #1. Excavation will be covered under a separate phase, the following field season under a separate scope.

6. Are analytical samples to be collected during the site characterization, or this to be done based on visual evidence and review of previous records?

Analytical samples are expected to be collected based on field screening results

7. If analytical samples are to be collected (both groundwater and soil), is there a number of samples and a list of analytes bidders should include in their quote?

BIA anticipates 16 soil and 11 water samples for laboratory analysis. Contaminants of concern are primarily DRO with PAHs and VOCs also tested for at locations exhibiting the highest field screening results.

8. Task 2 states a “risk evaluation”, will completing an ADEC Conceptual Site Model suffice for this requirement?

A risk evaluation is not included in the scope.

9. Does a landfarm exist that has capacity for the quantity of soil to be excavated, or should the bidder include costs for the construction of a landfarm.

BIA is not aware of an existing active landfarm in the Village of Eek. Site examination should include the investigation of a suitable site in the Village of Eek and a cost estimate for construction.

10. RFQ mentions excavation of approximately 330 CY of contaminated soil. Is this a maximum amount?

This is an estimate from previous old reports. This assessment will determine how much area and volume of contaminated soil above DEC regulatory limits there is to be remediated under a separate phase, the following field season.

11. Does the 330 cy include clean soils that may be encountered in surface soils, or is this limited to contaminated soils above maximum allowable concentrations?

Clean overburden, based on field screening and AK DEC consultations, can be segregated and replaced during return to grade.

12. Is there a maximum amount of soil to be excavated, including both clean and contaminated? If the contamination is confined to a thin layer a significant area and large volumes of clean soil would have to be excavated to remove 330 cy of contaminated soils.0

Amendment # 1 140A0524Q0003, Eek Remediation:

No. The results of this assessment (field screening, analytical results, DEC consultations, etc.) will determine the area/volume of contaminated soil above DEC regulatory limits to be remediated under a separate phase, the following field season.

13. Is the contractor responsible for backfilling the excavation? If so, can the excavation be backfilled prior to the receipt of analytical results?

Yes, any excavated areas need to be returned to grade. Yes, based on field screening results and consultation with AK DEC.

14. Should the bidder include costs for backfill material, or will this be provided by the village or other entity?

Yes, the bidder shall include costs for the backfill material.