Attachment_V_Specification_Deliverables.pdf

PDF 67 KB Posted

Attached to
Request for Quotation (RFQ) NOAA Ship Rainier Drydock Federal contract opportunity
Solicitation number
1305M219QNMAN0213
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Attachment V Specification Deliverables

View the file

Other files for this federal contract opportunity

Other files attached to Request for Quotation (RFQ) NOAA Ship Rainier Drydock, newest first.
File Type Posted
Amendment_6.pdf PDF
Amendment_6.pdf PDF
Attachment_IV_-_Price_Schedule_RA_REV_B.pdf PDF
Amendment_5.pdf PDF
Attachment_I_Specification_Revision_C.pdf PDF
AC_Images.zip ZIP file
Amendment_4.pdf PDF
Attachment_IV_-_Price_Schedule_RA_REV_A.pdf PDF
RFQ_1350M219QNMAN0213.pdf PDF
Attachment_I_Specification_Revision_B.pdf PDF
RA-120-001.pdf PDF
Amendment_3.pdf PDF
Attachment_I_Specification_REVISION_A.pdf PDF
Amendment_2_References.zip ZIP file
Amendment_2.pdf PDF
Amendment_1_Work_Item_13111.pdf PDF
Attachment_III_Past_Performance_Questionnaire.pdf PDF
Attachment_IV_-_Price_Schedule_RA.xlsx XLSX spreadsheet
Attachment_II_Past_Performance_Information_Form.pdf PDF
Attachment_1_Specification.pdf PDF
RA_DD_REF.zip ZIP file
RFQ_1350M219QNMAN0213.pdf PDF
SYNOPSIS__RAINIER_DD.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Quantity Due Date Deliver To

Gen Req Contractor Schedule 1 First 3 days of PoP PE

Gen Req Weekly progress report 1 Weekly PE

Gen Req Weekly Look Ahead 1 Weekly PE

Gen Req Hot Work Permits 1 Daily As Needed OOD

10910 Estimate of ABS Services Fee 1 First Week of PoP PE

10910 ABS Schedule 1 First Week of PoP PE

10910 ABS Load Line Renewal Cert 1 By close of PoP PE

10911 Service Records of Safety and Fire Equipment 2 By close of PoP PE and CO

10912 Pressure Vessel Hydro‐test reports 1 By close of PoP PE

12330 Main Engine Repair Report 1 By close of PoP PE

13110 Diesel Generator Repair Report 1 By close of PoP PE

15050 Hydrostatic test results of repaired piping 1 By close of PoP PE

15051 Survey of Non‐Metallic Expansion Joints 1 By close of PoP PE

15120 Cleaning Report 1 By close of PoP PE

15140 Compressor Inspection Report 1 By close of PoP PE

15170 Boiler Servicing and repair report 1 By close of PoP PE

15330 Grey Water Tank Inspection Report 1 By close of PoP PE

15680 Motor Service Report 1 By close of PoP PE

15720 Certificate of Inspection 1 By close of PoP PE

15830 Report of Services for Davits, and Windlass 1 By close of PoP PE and Chief B

16120 NDT reports 1 By close of PoP PE

16510 Installation Report 1 By close of PoP PE

21230 Weld Inspetion Report 1 By close of PoP PE

21230 Structural test Report 1 By close of PoP PE

21230 ABS Inspection Report (if needed) 1 By close of PoP PE

21230 Certificates and Documentation of equipment 1 By close of PoP PE

21230 Work Completed Report 1 By close of PoP PE

54010 Work Completed Report 1 By close of PoP PE

66440 Weld Inspetion Report 1 By close of PoP PE

66440 Structural test Report 1 By close of PoP PE

66440 ABS Inspection Report (if needed) 1 By close of PoP PE

66440 Certificates and Documentation of equipment 1 By close of PoP PE

66440 Work Completed Report 1 By close of PoP PE