Attachment_IV_-_Price_Schedule_RA.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Request for Quotation (RFQ) NOAA Ship Rainier Drydock Federal contract opportunity
- Solicitation number
- 1305M219QNMAN0213
About this file
Attachment IV Price Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_6.pdf | ||
| Amendment_6.pdf | ||
| Attachment_IV_-_Price_Schedule_RA_REV_B.pdf | ||
| Amendment_5.pdf | ||
| Attachment_I_Specification_Revision_C.pdf | ||
| AC_Images.zip | ZIP file | |
| Amendment_4.pdf | ||
| Attachment_IV_-_Price_Schedule_RA_REV_A.pdf | ||
| RFQ_1350M219QNMAN0213.pdf | ||
| Attachment_I_Specification_Revision_B.pdf | ||
| RA-120-001.pdf | ||
| Amendment_3.pdf | ||
| Attachment_I_Specification_REVISION_A.pdf | ||
| Amendment_2_References.zip | ZIP file | |
| Amendment_2.pdf | ||
| Amendment_1_Work_Item_13111.pdf | ||
| Attachment_II_Past_Performance_Information_Form.pdf | ||
| Attachment_III_Past_Performance_Questionnaire.pdf | ||
| Attachment_V_Specification_Deliverables.pdf | ||
| Attachment_1_Specification.pdf | ||
| RA_DD_REF.zip | ZIP file | |
| RFQ_1350M219QNMAN0213.pdf | ||
| SYNOPSIS__RAINIER_DD.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Prices
| Attachment IV NOAA Ship RAINIER Drydock | |||||||
| PRICE SCHEDULE | |||||||
| BASE ITEMS | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 10000 | 10870 | DRYDOCKING BERTHAGE AND UTILITIES | 1 | JB | |||
| 10000 | 10910 | ABS ANNUAL LOAD LINE SURVEY AND REPAIRS | 1 | JB | |||
| 10000 | 10911 | FIRE AND SAFETY INSPECTIONS AND REPAIR | 1 | JB | |||
| 10000 | 11370 | DECK AND BULKHEAD STEEL REPAIRS | 1 | JB | |||
| 10000 | 12330 | MAIN ENGINE ANNUAL MAINTENANCE AND INSPECTION | 1 | JB | |||
| 10000 | 12410 | REDUCTION GEAR INSPECTION | 1 | JB | |||
| 10000 | 13110 | SSDG ANNUAL MAINTENANCE AND INSPECTION | 1 | JB | |||
| 10000 | 13111 | EGEN MAINTENANCE AND INSPECTION | 1 | JB | |||
| 10000 | 15040 | MACS SYSTEM SERVICING | 1 | JB | |||
| 10000 | 15050 | FIRE MAIN AND MISCELLANEOUS PIPING REPAIR | 1 | JB | |||
| 10000 | 15120 | VENTILATION CLEANING | 1 | JB | |||
| 10000 | 15140 | AC AND REEFER INSPECTIONS | 1 | JB | |||
| 10000 | 15170 | BOILER SERVICING | 1 | JB | |||
| 10000 | 15330 | GREY WATER TANKS CLEAN | 1 | JB | |||
| 10000 | 15610 | STEERING GEAR INSPECTION AND MAINTENANCE | 1 | JB | |||
| 10000 | 15720 | ELEVATOR INSPECTION | 1 | JB | |||
| 10000 | 15830 | LIFTING GEAR INSPECTIONS | 1 | JB | |||
| 10000 | 16310 | UNDERWATER HULL COATING | 1 | JB | |||
| 10000 | 16311 | FREEBOARD HULL COATING | 1 | JB | |||
| 10000 | 16340 | DECK NON-SKID RENEWAL | 1 | JB | |||
| 20000 | 22430 | SHAFTS BEARINGS AND PROPELLER HUB | |||||
| REFURBISHMENT | 1 | JB | |||||
| 20000 | 25680 | SPP PLC REPLACEMENT | 1 | JB | |||
| 20000 | 26310 | SUPERSTRUCTURE COATING | 1 | JB | |||
| 20000 | 26440 | TOILET AND SHOWER RENEWAL | 1 | JB | |||
| Total Base Items | $0.00 | ||||||
| ADDITIONAL ITEMS - GROWTH | |||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 30000 | |||||||
| 40000 | 30000 | ||||||
| 40000 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity:1,650; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 1,650 | |
| 30000 | ||
| 40000 | 30000 | |
| 40000 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $80,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$80,000.00 X percentage quoted]: $______________
| % | EST. 80,000.00 | |||||
| 0025 | N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| 1 | ||||||
| 0026 | N/A | Laydays (See CAR Clause 1372.271-89) | Day | EST 1 | ||
| Total Growth | $0.00 | |||||
| OPTION ITEMS | ||||||
| Note: These items (0024 - 0034) may be exercised in accordance with FAR Clause 52.217-7 “OPTION FOR INCREASED QUANTITY-SEPARATELY PRICED LINE ITEMS”. | ||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE |
| 50000 | 50840 | CRANE SUPPORT SERVICES | 1 | JB | ||
| 50000 | 55290 | BILGE PUMPING | 1 | JB | ||
| 50000 | 55410 | DIESEL FUEL STORAGE | 1 | JB | ||
| Total Option Items | $0.00 |
| BASE | $0.00 |
| BASE + OPTIONS | $0.00 |
| BASE + OPTIONS +GROWTH | $0.00 |
&KFF0000Attachment IV
RFQ 1305M219QNMAN0213
NOAA Ship RAINIER Drydock
File details come from the government source that posted it.