Sol_12SPEC18B0004_Amd_0002.pdf
PDF 100 KB Posted
- Attached to
- Delta-Clearwater Remediation Project Federal contract opportunity
- Solicitation number
- 12SPEC18B0004
About this file
Amendment 002 with Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SubGrade_-_TINN.dxf | DXF file | |
| Topsoil_-_TINN.dxf | DXF file | |
| Sol_12SPEC18B0004_Amd_0001.pdf | ||
| WD_AK170001_11.24.17.pdf | ||
| Final_spec_packet_-_w_PE_Stamp.pdf | ||
| 2017-08-21_DCW_Design_Phase_2_DWGs_B_Size_Optimized.pdf | ||
| 12SPEC18B0004_Delta_Clearwater_Remediation_Project_for_FBO_Base.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12SPEC18B0004
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-AK-120150
PALMER AK 99645
SUITE 100
800 WEST EVERGREEN
USDA-NRCS-ALASKA STATE OFFICE
WASHINGTON DC 20250
NRCS-HQ-123C78
ROOM 6801-S
1400 INDEPENDENCE AVENUE, SW
USDA-NRCS CONTRACTING TEAM 3
NRCS-HQ-123C78
12/08/20170002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/08/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Delta Clearwater Remediation Project Phase 2 Construction Contract.
The purpose of this amendment is to provide responses to questions received, to amend construction specification 5, and to provide information about the public bid opening.
The public bid opening will be held at 10:00am Alaska Time on January 10th, 2018 at the
USDA/NRCS Alaska State Office, 800 W. Evergreen Ave., Palmer, AK 99645.
If you are interested in dialing in to the bid opening, please contact the Contracting
Officer at either ryan.lorimer@wdc.usda.gov or 907-761-7744 for the call-in number and instructions no later than 8am Alaska Time on 1/10/2018.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
RYAN LORIMER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12SPEC18B0004/0002
All other terms and conditions remain the same.
The COR will be designated at the time of award.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
DELTA CLEARWATER REMEDIATION PROJECT
Q1. Bid Items 17 and 21 are both Salvaged Riprap. The spec details both as being salvaged riprap in the splitting channel. Item 17 is lump sum and item 21 is unit price. Please identify if there is a delineation between these items or if they are one in the same. Please clarify.
A1. Response: The specifications clearly describe differences between Bid Item 17, Salvaging Riprap and Bid Item 22, Riprap, Salvaged. The two items are subject to completely different specifications, and entail different construction activities.
Q2. Please clarify if the details on sheets 12 and 13 apply to the entire area of the splitting channel depicted on sheet 11 or will the NRCS be delineating areas to be repairs. If so will the NRCS detail the size and extent of those areas so we can properly estimate the costs.
A2. The entire area and length of splitting channel as depicted drawing sheet 11 will require combinations of Sections T, U, V, and W to be constructed. As stated on drawing sheet 13, the extents of Detail B (and hence Section U-U) will be staked by NRCS, prior to construction.
Q3. Is the surface course in the parking lot incidental to Item 13 Parking lot or Item 23 Road Surfacing? The specifications are not 100% clear. It is also difficult to determine as no engineers calculations have been provided.
A3. Response: Construction Specification 402, Section 6, clearly states the items of work to be performed under the specification.
Q4. Can the engineers calculations be made available to bidders?
A4. No
Q5. Due to the fact that the contractor is responsible for obtaining all of the topsoil (from multiple sources), +/- 90,000 CY of embankment material, live staking and shrub plantings from offsite and due to the holiday season we are requesting a 14 day extension on the bid opening.
A5. No extension of bid time
Q6. Please reconsider increasing the time limit for construction to include 2 seasons to perform the work. We feel that your design and phasing along with obtaining the materials required from off-site sources will make it difficult to complete this project in the 150 day time limit without incurring the liquid dated damages at $1,750/Day.
A6. No extension of performance time
Q7. Would you please forward me a copy of the planholders list on this project. We intend to contact parties for supply and materials.
A7. Please refer to the tab titled “Interested Vendors List” on the FBO.gov post. Link:
(https://www.fbo.gov/index?s=opportunity&mode=form&id=2ed38ea36c273cadf0f3b8fe35b20dbc&tab=core &_cview=1)
8) In construction specification 5, pollution control, amend section 8-a-(2)-c) to include the following in Stage 1 order of work. The portion of stage 1 work between approximate Station 96+00 of existing side inlet 1 and extending to a line between the northernmost corner of existing side inlet number 2 (approximate station 16+00) and the southernmost corner of existing auxiliary spillway 1 (approximate station 13+00), may be completed at any time during stage 1 work. The length of this section does count toward the 1000 foot maximum allowed to be under construction at any point in time.