S01 AMD 02 Additional QAs.pdf

PDF 160 KB Posted

Attached to
Emergency Watershed Protection, Shelby County, Texas Federal contract opportunity
Solicitation number
12FPC322B0004
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document contains a federal contract opportunity solicitation and related questions and answers. The solicitation is for Emergency Watershed Protection services in Shelby County, Texas, with an estimated value between $1,000,000 to $5,000,000. The work involves stabilization of county roads and drainage ways damaged by storms and hurricanes through methods such as constructing timber headwalls, placing rock riprap and sand-cement bags, and placing rock armor along stream banks and drainage ditches. The solicitation is set aside for small businesses with a North American Industry Classification System code of 237990 and size standard of $39.5 million. The fixed-price contract will be awarded in May 2022 under sealed bid procedures to a firm registered in the System for Award Management database. The questions and answers clarify that backfill material suitability will be determined in the field, and culvert sizes and materials were left to the county's discretion and are unknown.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Farm Production and Conservation

Business Center

USDA is an equal opportunity provider, employer and lender.

United States Department of Agriculture

May 18, 2022

SUBJECT: EWP, Shelby County, Texas Solicitation No. 12FPC322B0004

1) What kind of backfill material will be used a the various locations?

Construction Specification 21 ‐ Excavation, Section 4 ‐ Use of Excavated material & Construction Specification 420 – Site Preparation, Section 3 – Excavation, Paragraph 3 beginning with “Section 4…”:

a. In Spec 21, Section 4 – Use of Excavated Material, both methods use the language “The suitability of material for specific purposes is determined by the engineer”

b. In Spec 420, Section 3 it further clarifies section 4 of specification 21 by saying “Section 4, Use of excavated materials – Method 1 – There is no guarantee that materials obtained from the specified excavations may be used directly in specified fill areas.

Stockpiling of selected materials to insure their availability for use in specific zones of the fill areas may be required. Additional compensation will not be made for stockpiling of excavated materials.”

c. Typically, the contractor is able to use the same material that was excavated from the site, but this is not always the case due to the high likelihood that some of the soil will have an unsuitable moisture content. In the event that there is not enough suitable backfill material, and the county cannot bring material, it is the responsibility of the contractor to secure backfill material.

2) Will the material from question 1 be the same for placement under culverts or a different material used?

Again, it depends on the suitability. If the material is of the correct moisture content such that it compacts well, then yes, it can be used underneath the culverts. But that will need to be determined by the NRCS representative in the field, or by the COR.

3) Could we get the sizes and material type for the new culverts for each location? The drawings do not specify this information on whether the existing culvert will be replaced/removed or remain?

The culvert size and material was left up to the discretion of the county. The NRCS does not know the size/material of the culverts the county will use for the culverts to be replaced.