P08 Drawings.pdf
PDF 14 MB Posted
- Attached to
- EWP - Streambank Stabilization - Blizzards Gate Site, Harman, Randolph County, WV Federal contract opportunity
- Solicitation number
- 12FPC220B0001
About this file
This document outlines a federal contract opportunity for streambank stabilization work along Horsecamp Run in Harman, West Virginia. The USDA Natural Resources Conservation Service seeks to stabilize an eroded section of streambank using gabion baskets adjacent to a home. Interested small businesses must bid on the fixed-price construction contract by February 5th, 2020. The 64-day performance period includes site preparation, channel clearing and shaping, pollution control, seeding and mulching, water removal, excavation, earthfill, quality control, geotextiles, and obstruction removal. A pre-bid site showing will be held on January 15th at the Harman Fire Department. All questions are due by January 24th, with responses posted on January 27th.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BIDOPENINGRESULTS.pdf | ||
| S01 Amend 001 12FPC220B0001 QA.pdf | ||
| P08 Specifications.pdf | ||
| Construction Wage Determination WV2020061.pdf | ||
| S01 Invitation for Bids 12FPC220B0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .