About this file

This document outlines a federal contract opportunity for streambank stabilization work along Horsecamp Run in Harman, West Virginia. The USDA Natural Resources Conservation Service seeks to stabilize an eroded section of streambank using gabion baskets adjacent to a home. Interested small businesses must bid on the fixed-price construction contract by February 5th, 2020. The 64-day performance period includes site preparation, channel clearing and shaping, pollution control, seeding and mulching, water removal, excavation, earthfill, quality control, geotextiles, and obstruction removal. A pre-bid site showing will be held on January 15th at the Harman Fire Department. All questions are due by January 24th, with responses posted on January 27th.

View the file

Other files for this federal contract opportunity

Other files attached to EWP - Streambank Stabilization - Blizzards Gate Site, Harman, Randolph County, WV, newest first.
File Type Posted
BIDOPENINGRESULTS.pdf PDF
S01 Amend 001 12FPC220B0001 QA.pdf PDF
P08 Specifications.pdf PDF
Construction Wage Determination WV2020061.pdf PDF
S01 Invitation for Bids 12FPC220B0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .