About this file

This document provides details of a federal construction contract solicitation. The USDA Farm Production and Conservation Operations Branch is seeking bids to stabilize a section of eroded streambank along Horsecamp Run in Harman, West Virginia. The work will use gabion baskets and other measures under the Emergency Watershed Protection Program. The performance period is 64 calendar days. Interested contractors must be registered in SAM and complete annual representations and certifications to be eligible. Sealed bids are due on February 5, 2020 and must include bid guarantees of 20%. Performance and payment bonds of 100% will be required within 7 days of award. A pre-bid site showing will be held on January 15, 2020. All necessary permits and land rights have been acquired. The estimated value is between $500,000-$750,000 and it is set aside for small businesses. Questions are due by January 24th and responses will be posted on January 27th.

View the file

Other files for this federal contract opportunity

Other files attached to EWP - Streambank Stabilization - Blizzards Gate Site, Harman, Randolph County, WV, newest first.
File Type Posted
S01 Amend 001 12FPC220B0001 QA.pdf PDF
P08 Specifications.pdf PDF
Construction Wage Determination WV2020061.pdf PDF
P08 Drawings.pdf PDF
S01 Invitation for Bids 12FPC220B0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Randolph County, WV

CONTRACTOR NAME BID AMOUNT

1 Nehemiah Construction 489,934.88$

2 Mountaineer Infrastructure 521,176.00$

3 Jim Construction 521,723.43$

4 Petrucci Brothers 570,000.00$

5 Eastern Arrow 623,222.00$

SUMMARY OF BIDS RECEIVED

Solicitation Number: 12FPC220B0001

Project: EWP - Blizzards Gate Site

Date: 2/5/2020

Sheet1

File details come from the government source that posted it. Updated .