129JGP19Q0075_Pinecrest_Sewage_System_Refurbishment.doc
DOC document 165 KB Posted
- Attached to
- Pinecrest Sewage System Refurbishment Federal contract opportunity
- Solicitation number
- 129JGP19Q0075
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_01_129JGP19Q0075_Pinecreast_Sewage.pdf | ||
| Attachment.zip | ZIP file | |
| Site_Visit_Reschedule_Memo.docx | DOCX document | |
| Attach_04_2011_Pinecrest_East_Shore_Improvements_PLANS.pdf | ||
| Attach_06_Capability_of_Offeror_Questionnaire.docx | DOCX document | |
| Attach_01_Wage_Determination_CA190018.pdf | ||
| Attach_02_Pinecrest_Sewer_Reconstruction.pdf | ||
| Attach_03_Project_Specifications.pdf | ||
| Attach_05_Fire_Plan_Aug_2012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.acquisition.gov/far/
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
129JGP19Q0075
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE ORDER NO.
958699
6. PROJECT NO.
7. ISSUED BY
CODE
| 9JGP |
| 8. ADDRESS OFFER TO |
USDA FOREST SERVICE
Central California Acquisition Service Area
631 Coyote Street
Nevada City, California 95959 See Block 7.
9. FOR INFORMATION
CONTACT:
A. NAME
Robert Briney
B. CONTACT INFORMATION
(530) 478-6120 or email Robert.briney@usda.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Project Title: Pinecrest Sewage System Refurbishment The Government's estimate is: $25,000.00 to $100,000.00 Contractor MUST be registered in System for Award Management www.sam.gov **Please provide the following information:**
DUNS#_______________________
11. The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days after receiving FORMCHECKBOX award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Section F)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 01 copies to perform the work required are due at the place specified in Item 8 by 3:00 PM Pacific (hour) local time Thursday June 27th 2019. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e) OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
SECTION C—DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
This project is for the replacement, repair, and/or troubleshooting of components on three existing sewer lift stations, raising wet well and pipe vault lids, raising surrounding grades around two wet well and pipe vaults, and making modifications to an existing composting toilet building.
Project Location
Summit Ranger Station Pinecrest Day Use Area Pinecrest Reservoir East Shore
#1 Pinecrest Lake Road
Pinecrest, CA 95364 Price Range
The Government’s estimate is:
[X] $25,000.00 to $100,000.00.
Estimated Start Date 1 August 2019 Option Items
None Restrictions on Work Work shall be performed during daylight hours between 0600 hrs and 1900 hrs local time. Exceptions to these times are:
1. In accordance with the fire plan, if included in Section J.
2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.
Insurance & Certifications The Contractor shall provide evidence of Worker’s Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing (see also Section H, Camping Permit Compliance) Camping is not permitted in US Forest Service campgrounds. Contractor [ ] will [ X ] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
Maps See section J list of attachments Drawings and Specifications See section J list of attachments
SECTION E—INSPECTION AND ACCEPTANCE
E.1 Clauses Incorporated by Reference (FAR 52.252-2) (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisitions.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984)
52.246-12 Inspection of Construction (AUG 1996)
Inspections
SECTION F—DELIVERIES OR PERFORMANCE
F.1 Clauses Incorporated by Reference (FAR 52.252-2) (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisitions.gov
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 Commencement, Prosecution, and Completion of Work (FAR 52.211-10) (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 45 calendar days from the effective date on the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
F.3 Contract Time
Item Estimated Starting Date
Calendar
1. August 1st, 2019 60 Days Work shall progress at a rate, which will insure job completion within the calendar time specified above.
Work Timing
Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
Winter Shutdown
When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.
SECTION G—CONTRACT ADMINISTRATION DATA
Invoices Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. The one-time enrollment in IPP means a series of emails will be sent to the point of contact (POC) established in your System for Award Management (SAM) account at www.sam.gov. So, please verify that the POC’s email address is up to date in your company’s SAM account prior to starting the IPP enrollment process. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
Invoices shall be accompanied by the signed contractor certification, using the exact wording in the clauses, FAR 52.232-5, and be up-to-date on certified payrolls for the invoiced timeframe, FAR 52.222-8. (See next page for invoice certification language.) Invoices that do not meet these requirements will be rejected.
The contractor shall submit payrolls weekly for each week in which any contract work is performed. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information listed on the form WH-347 (available for download at www.dol.gov., including the certification verbatim from the WH-347. Forms from other State or County governments are not compliant. Invoices that do not meet these requirements will be rejected. A Contract Release is required with the final invoice, or the invoice may be rejected.
Payment for Materials Off-Site
In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items
The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.
Preconstruction Conference
This required conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)
PAYMENT CERTIFICATION
I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.
(Name)
(Title)
(Date)
SECTION H—SPECIAL CONTRACT REQUIREMENTS
Emergencies
Fire Plan [x]See Section J, Fire Plan
[ ]Not applicable; however, Contractors are required to comply with State law during fire season.
Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor’s area of responsibility for fire under the terms of the Fire Plan (Section J):
[ ](a) Trail Construction — 100 meters on either side of the centerline
[x](b) Construction of Structures — 100 meters around the perimeter of the project
[x]I Road Construction — 400 meters on either side of the centerline
[ ](d) Special for this project:
Utility Services
NONE
Superintendence by Contractor
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a “Designation of Contractor’s Representative” form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction
Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties’ property as a result of the Contractor’s operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Camping Permit Compliance
Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.
Archaeological and Historic Sites
Location of known archaeological, historic, or pre-historic materials—such as Native American artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)—will be identified for the contractor before work commences.
Spill Plan
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor’s employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor’s employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning
All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
SECTION I — CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013)
52.204-4 Printed or Copied Double- Sided on Recycled Paper (MAY 2011)
52.204-7 System for Award Management (OCT 2018)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-6 Brand Name or Equal (Aug 1999) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
52.211-18 Variation in Estimated Quantity (APR 1984) 52.213-4 Terms and Conditions – Simplified Acquisitions (Other Than Commercial Items)(Jan 2019) 52.215-8 Order of Precedence—Uniform Contract Format. (Oct 1997) 52.217-7 Option for Increased Quantity—Separately Priced Line Item. Fill In (within 60 days after award) 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) 52.222-6 Construction Wage Rate Requirements (Aug 2018)
52.222-7 Withholding of Funds (MAY 2014)
52.222-8 Payrolls and Basic Records (Aug 2018)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination — Debarment (MAY 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-26 Equal Opportunity (SEPT 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)
52.223-1 Biobased Product Certification (MAY 2012)
52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (September 2013).
52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997)
52.225-9 Buy American—Construction Materials. (May 2014)
52.225-10 Notice of Buy American Requirement—Construction Materials. (May 2014) 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications. (Aug 2018)
52.227-1 Authorization and Consent (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity — Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets (Aug 2018)
52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)
52.228-13 Alternative Payment Protections. Fill in below
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor’s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required.
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.
(v) A deposit of the types of security listed in 28.204-1 and 28.204-2.
52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014)
52.232-16 Progress Payments (APR 2012)
52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.243-5 Changes and Changed Conditions. (Apr 1984) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (Apr 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.228-70 Alternative Forms of Security (NOV 1996) Fill in: USDA Forest Service 452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
452.236-71 Prohibition against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
Order of Precedence--Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
SECTION J--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Attachments
| Attachment No. |
| Description |
(All documents uploaded separately and included in the solicitation) Pages Included
| 1 |
| Wage Determination CA190018 |
| 76 |
| 2 |
| Pinecrest Day Use Area Sewage System Refurbishment Stanislaus National Forest April 29, 2019 |
| 9 |
| 3 |
| Pinecrest Day Use Area Sewer System Refurbishment Stanislaus National Forest Project Specifications |
| 21 |
| 4 |
| Pinecrest Recreation Area – East Shore Day Use Area Improvements August 2011 |
| 5 |
| 5 |
| Fire Plan |
| 9 |
| 6 |
| Capability of Offeror Questionnaire |
| 3 |
SECTION K--REPRESENTATIONS AND INSTRUCTIONS
AGAR 452.219-70 Size Standard and NAICS Code Information (Sept 2001) Fill in below Contract line item(s): ALL
NAICS Code:
237110 Size Standard:
$36.5 Million 52.204-8 -- Annual Representations and Certifications. Fill in below
(1) The North American Industry classification System (NAICS) code for this acquisition is __237110__.
(2) The small business size standard is _____$36.5 Million__.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this address:
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
52.204-6 Unique Entity Identifier (OCT 2016) 52.215-1 Instructions to Offerors--Competitive Acquisition (JAN 2017), Alternate II (OCT 1997) 52.215-5 Facsimile Proposals (OCT 1997) Fill in: 530-478-6126, Nevada City, CA 52.216-1 Type of Contract (APR 1984) Fill in: Firm-fixed price contract 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999) Fill in below:
19.8% for Tuolumne County, CA
Tuolumne County 52.232-13 Notice of Progress Payments.
52.236-28 Preparation of Proposals – Construction (OCT 1997)
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES
452.204-70 Inquiries (FEB 1988)
FAR 52.236-27 Site Visit (Construction) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) A site visit for this project has been scheduled for the 20th of June at 1:00 P.M. PST meeting at the Pinecrest Recreation Area – East Shore Day Use Area. Be advised that contractors will be responsible to provide their own boat transportation to cross Pinecrest Lake or hike the two mile trail to access the site. Please email rwbriney@fs.fed.us if you plan on attending the site visit.
(End of Provision)
Pre-Bid Information
This project was pre-advertised on 5/30/2019 when a notice was posted on the FedBizOpps website: http://www.fbo.gov.
NOTE: The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of a contract based on this solicitation, unless that understanding or representation is expressly stated in the contract.
Submission of Offers/Preparation of Proposals
Proposals may be submitted in the following ways:
By hand or by mail to:
631 Coyote St, Nevada City CA 95959
By fax to:
530-478-6120 By email to:
Robert.briney@usda.gov Address/cover sheets/email subject line to include Solicitation number and project name.
RETURN Sections:
A (SF1442),
B (Schedule of Items), and Response to Capability of Offeror Questionnaire and All proposal information (or its equivalent) when submitting an offer.
Failure to submit all required documents may result in the offer’s being rejected.
SECTION M--EVALUATION FACTORS FOR AWARD
AWARD DETERMINATION
Award will be made using the Simplified Acquisition Procedures in accordance with FAR Part 13. Award will be made to the offeror whose acceptable offer provides the best value to the government, considering price and the non-price factors. Non-price evaluation factors include past performance, capability of offeror.
EVALUATION FACTORS
Acceptability of the Offer
The Government will determine the acceptability of each offer on a pass or fail basis. An offer is acceptable when it manifests the offeror's assent, without exception, to the terms and conditions of the RFQ, including attachments. If an offeror takes an exception to any of the terms and conditions of the RFQ, then the Government will consider its offer to be unacceptable.
Capability of the Offeror
The Government will assess the capability of each offeror on the basis of the following criteria: (1) Understanding of the Government's requirements, (2) Organizational Experience, and (3) Organizational Past Performance. The Government will not assess capability on a pass/fail basis, but will use its assessments of capability as a basis for comparing offerors to determine best value.
(1) Understanding of the Government's Requirements. The Government will evaluate each offeror's relative understanding of the Government's requirements on the basis of its written submittals addressing the following subfactors:
a) Any information that indicates the extent to which the site for this project was visited.
b) The results concluded from the site visit.
c) The resources (personnel and equipment) which are planned for use on the project, and how realistic that plan is given concurrent obligations. Discuss any subcontractors and their background and capability.
d) Site-specific safety plan.
e) Plan of work to include the major tasks and timelines.
f) Where applicable, estimated production rates.
(2) Organizational Experience. Experience is the opportunity to learn by doing. The Government will evaluate each offeror's organizational experience on the basis of its breadth, its depth, and its relevance to the work that will be required under the prospective contract. The Government will not evaluate an offeror's organizational experience on the basis of the personal experience of the offeror's key personnel. However, the Government will consider the extent to which the offeror's key personnel have worked together in the past.
(3) Organizational Past Performance. Past performance is a measure of the degree to which an offeror satisfied its customers in the past and complied with Federal, state, and local laws and regulations. The Government will contact some of each offeror's customers to ask whether or not: (1) the offeror was capable, efficient, and effective; (2) the offeror's performance conformed to the terms and conditions of its contract (specifications); (3) work was finished within the contract time; (4) the offeror was reasonable and cooperative during performance; and (5) the offeror was committed to customer satisfaction. In evaluating past performance, the Government will contact some of the references provided by the offeror and other sources of information, including, but not limited to: Federal, state, and local government agencies, better business bureaus, published media, and electronic data bases.
�PAGE \# "'Page: '#'�'" ��**NOTE** [FILL IN THE BLANKS]
File details come from the government source that posted it.