Amendment_4.pdf

PDF 188 KB Posted

Attached to
FY19 HUD Mechanical Site Prep Federal contract opportunity
Solicitation number
129JGP19Q0009
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

View the file

Other files for this federal contract opportunity

Other files attached to FY19 HUD Mechanical Site Prep, newest first.
File Type Posted
Amendment_7.pdf PDF
Amendment_6.pdf PDF
Amendment_5.pdf PDF
Amendment_3.pdf PDF
Amendment_2_Revision_1_LOP.pdf PDF
FY19_HUD_FR_and_SP_Amendment_1.pdf PDF
Attachment_3_FY19_HUD_Fuels_Reduction_Site_Prep_Data_Table_2_LOP.xlsx XLSX spreadsheet
Attachment_5_NDR_Service_Contract_Addendum_no_CA_Wages.docx DOCX document
Attachment_2_FY19_HUD_Fuels_Reduction_Site_Prep_Data_Table_1.xlsx XLSX spreadsheet
FY19HUD_Fuels_Reduction_and_site_prep_Sol.pdf PDF
Attachment_6_Wage_Determination.docx DOCX document
Attachment_4_2012_FINALPAL_Fire_Plan_080212.doc DOC document
Attachmnet_1_Maps.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

1. CONTRACT ID CODE

I

PA

E OF PAGES

I 2

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable) 2. AMENDMENT/MODIFICATION

NO. 4

3. EFFECTIVE DATE

12/20/2018

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I USDA Forest Service Central CA Acquisition Service Area 631 Coyote St.

Nevada City, CA 95959

8. NAME AND ADDRESS OF CONTRACTOR (No., street. county, State and ZIP Code) �

9A. AMENDMENT OF SOLICITATION

NO.

X

129JGP19Q0009

98. DATED (SEE ITEM 11)

11/28/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

□ 108. DATED (SEE ITEM 13)

CODE !FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

D The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended, D is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning _____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor D is not, XX is required to sign this document and return ___1_ _ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 4 is to post Additional Questions and Answers. Date for questions and answer cut off is January 2, 2019.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 0A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

158. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

NSN 7540-01-152-8070

Previous edition unusable

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

OLAINE MARTINEZ

168. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of Contracting Officer) 12/20/2018

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

Q1. In section C6 Licenses and Insurance it states that the contractor shall be registered as a Farm Labor Contractor. Upon reviewing the requirements for a Farm Labor Contractor we do not meet the requirements to register. Can this requirement be waived?

A1. It doesn’t need to be waived. It only applies if you meet the requirements to register. If you don’t meet the requirements then just states so.

Q2. Under Section 8.2 / General Specifications in regards to the piles it states that all piles shall not exceed 70 feet, however during the job walk it was expressed that there was no limit to pile size. Is there a limit or not?

A2. It was stated at the pre-bid tour that there was no pile size this was not correct the contract is correct at a 70 foot size.

Q3. Can we get a map that shows all the LOP / Controlled Areas (arch sites, noxious weeds, non-work, etc)?

A3. A Map with LOP areas/controlled areas such as arch sites, noxious weeds will not be provided at this time. These are not items normally put on our maps. If time permits, we will attempt develop a Map including some of these areas and provide it prior to January 2, 2019.

Q4. On areas over 45%: Are all areas over 45% considered non-work or will there be some hand work in these areas? Will there be a map showing what areas will be considered hand work?

A4. Yes hand work will be required on the 45% and over slopes. Limitations for some units listed in C.8.2 Specification F. Common to all Treatments: # 3 Units Q009, T006 U003 live brush and dead brush skeletons on slopes greater than 45% slope no treatment is required. Dead trees would still be felled and piled.

Q4. Can we bill for progress payments in the larger units?

A4. Yes, but partial unit inspections need to be discussed with COR and Inspectors. This should be a part of your schedule, your plan or approach to work.

Q5. Do we have to bid all items? Based on the discussion at the job walk not all items were required to be bid. Please confirm.

A5. Yes all items need to be bid.

Amendment 4
Atachment Amendment 4. Site Visit Q&A

File details come from the government source that posted it.