Site Visit Q and A.pdf

PDF 97 KB Posted

Attached to
Riverside Structure Demolition Project Federal contract opportunity
Solicitation number
129AD620R0002
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Riverside Structure Demolition Project, newest first.
File Type Posted
Attachment 1 - Specifications - Revision 0001.pdf PDF
Amendment 0001.pdf PDF
Attachment 5 - Wage Determination.pdf PDF
Attachment 1 - Specifications.pdf PDF
Solicitation 129AD620R0002.pdf PDF
Attachment 3 - Photos.pdf PDF
Attachment 4 - Hazardous Material Inspection Form.pdf PDF
Attachment 2 - Project Site Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Riverside Facilities Structure Demolition Site Visit Q&A

1. Is testing for Asbestos part of the 24 days to complete.

I would consider the asbestos/hazardous materials testing as part of the 24 days deadline since it should only take a few days to complete, but the deadline itself is flexible due to the influence of COVID19.

2. In regards to removing the cinder block structure, a contractor asked: during removing if part of the concrete slab breaks how do they repair. One option is to cut the asphalt out one ft. from cinder block on all three sides, the other is to saw cut from one green house to the other 19’ and 6’ deep which is a total of 114 sq. Ft. or they can try removing it. If it breaks figure out what to do at that point.

Based on the contract, adjacent concrete structures are included in the demolitions so technically the concrete slab can be removed as part of the contract since the sidewalks are also being removed. Talking with Warren, the saw cut from one green house to the other is a more clean option.