Standard_Specification_List.pdf
PDF 136 KB Posted
- Attached to
- Telephone Pit Aggregate Crushing Federal contract opportunity
- Solicitation number
- 129AC719Q0025
About this file
List of Std Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD_CA190007,_Rev_4_dated_05.03.2019.pdf | ||
| 129AC719Q0025-0002.pdf | ||
| Q&A_Version_2_-_05.16.19.docx | DOCX document | |
| Q&A_Version_1_-_04.30.19.docx | DOCX document | |
| 129AC719Q0025-0001.pdf | ||
| Project_Plans.pdf | ||
| Supplemental_Specifications.pdf | ||
| 129AC719Q0025.pdf | ||
| WD_CA190007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS & BRIDES ON
FEDERAL HIGHWAY PROJECTS (FP-14)
SPECIFICATION LIST
SECTION
NUMBER
TITLE DATE
- Preface 2/28/2019 100 General Requirements - 101 Terms, Format, and Definition -
101.01 Meaning of Terms 11/9/2016
101.03 Abbreviations 11/9/2016
101.04 Definitions 9/5/2018
102 Bid, Award, and Execution of Contract - 102 Delete Section 102 in its entirety 11/9/2016 103 Scope of Work - 103 Delete Subsections 103.02, 103.03, 103.04, 103.05 11/9/2016 104 Control of Work -
104.00 Delete Subsections 104.01, 104.02, 104.04 11/9/2016
104.06 Use of Roads by Contractor 11/9/2016
105 Control of Material -
105.02 (a) Government-provided sources 7/18/2017
106 Acceptance of Work -
106.01 Conformity with Contract Requirement 7/18/2017
106.02 Visual Inspections 11/9/2016
107 Legal Relations and Responsibility to the Public -
107.05 Responsibility for Damage Claims - Delete 7/18/2017
108 Prosecution and Progress - 108 Delete Section 108 in its entirety 11/9/2016 109 Measurement and Payment -
109.00 Delete Subsections 109.06, 109.07, 109.08, and 109.09 11/9/2016
109.01 Measurement of Work 2/22/2019
109.02 Measurement Terms and Definition 11/9/2016
109.03 Weighing Procedures and Devices 11/1/2016
150 Project Requirement - 151 Mobilization - 153 Contractor Quality Control -
153.03 Quality Control Plan 11/1/2016
153.07 Records and Control Charts 11/1/2016
155 Schedules for Construction Contracts – Delete Section 155 in its entirety
155 Delete Section 155 in its entirety 11/9/2016
SECTION
NUMBER
TITLE DATE
156 Public Traffic -
156.00 Public Traffic 2/5/2019
205 Rock Blasting -
205.03 Regulations 11/8/2016
205.06 Preblast condition survey and vibration monitoring and control 11/8/2016
205.07 Test Blasting 11/8/2016
205.08 Blasting 11/8/2018
314 Stockpiled Aggregate -
314.01 Description 7/18/2017
314.04 Stockpile Site 7/18/2017
600 Incidental Construction - 619 Fences, Gates, Cattle Guards, and Bollard Posts - 700 Material - 703 Aggregate -
703.05 (c) Surface Course Aggregate 7/18/2017
703.05 Subbase, Base, Surface Course, and Screened Aggregate 6/7/2018
705 Rock -
705.02 Riprap 7/18/2017
725 Miscellaneous Material -
File details come from the government source that posted it.