129AC718Q0061_Amendment_1.pdf
PDF 172 KB Posted
- Attached to
- Bogard Engine Bay Roof Installation Federal contract opportunity
- Solicitation number
- 129AC718Q0061
About this file
Amd 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 074113_-_METAL_ROOF_PANELS.pdf | ||
| 129AC718Q0061.pdf | ||
| Project_Location_Map.pdf | ||
| 076200_-_SHEET_METAL_FLASHING_AND_TRIM.pdf | ||
| WD_CA180009_27Jul18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
129AC718Q0061
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
R5 NO-CAL ACQ SERVICE AREA NCASA
USDA FOREST SERVICE
08/03/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/03/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Bogard Engine Bay Roof Installation
Lassen National Forest
QUOTE DUE DATE EXTENDED TO AUGUST 22, 2018 at 12:00 PM PACIFIC
This amendment:
1) Adds roof removal to the Schedule of Items (USE AMENDMENT PAGE 2 or other written format)
2) Updates Section C.1 with the attached language (AMENDMENT PAGE 3)
3) Removes line 2.2 A.1.b. of CSI 07411 - Metal Panel Specifications: "Overlays existing roof panels; the ribs line up with the existing ones".
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
SANDRA VINCENT
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
129AC718Q0061/0001
There are no other changes.
FOB: Destination
Period of Performance: 30 calendar Days
Removal and Disposal of Existing Metal Roof
Metal Panel Roof Installation
LS $________________
LS $________________
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
C.1 SCOPE OF WORK
(REMOVE AND REPLACE LANGUAGE WITH THE FOLLOWING)
The project requires the furnishing of labor, equipment, transportation, supplies, and materials to remove and dispose of the current metal panel roof and install a new metal panel roof onto the
Bogard Engine Bay building. The roof is approximately 6,500 SF at roughly a 4/12 pitch with metal panel overhangs over the front and back of the building that extend about 4.5 feet out and run 125 feet along the length of the building. The overhang on the backside of the building does not have foam on top. There are 10 translucent panels that serve as skylights for the building.
The roof shall be installed with flashing, and sealed tight so that there are no leaks (i.e. around vents and skylights). The skylight panels will need to be removed and replace with new ones that will fit with the new metal roof panels. The rake edges shall be removed and new ones matching the existing color shall installed. Remove one unused vent pipe and vent cap located close to the center of the building.