SOW - Upgrade Air Handler Controls (1).docx
DOCX document 667 KB Posted
- Attached to
- REMOVE & REPLACE 4 AIR HANDLERS FOR MARICOPA, AZ Federal contract opportunity
- Solicitation number
- 12905B24Q0035
About this file
This combined synopsis and solicitation requests quotations for the removal and replacement of four air handlers located at the U.S. Arid Land Agricultural Research Center in Maricopa, Arizona. Offerors must provide all labor, materials, equipment, and supervision to remove the existing controls from four air handlers and install new Delta BACnet controllers, including programming, mapping points to graphics, and point-to-point checks. Quotes are due by February 14, 2023 at 12:00pm PST and shall be submitted to Brian.Fien@usda.gov. The solicitation is set aside for small businesses and issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area. Installation must be completed within 60 days of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WAGE DETERMINATION 2015-5469.pdf | ||
| Terms and Conditions.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture
Research, Education and Economics Agricultural Research Service
STATEMENT OF WORK
Upgrade Air Handler Controls
Located at the
U.S. Arid Land Agricultural Research Center in Maricopa, Arizona
1.0 PROJECT REQUIREMENTS: Contractor shall furnish a technical and unit priced (labor and materials) cost proposal to complete each project for any requested work as detailed in section 7.1 below. All requested work will be performed at the U.S. Arid Land Agricultural Research Center, Maricopa, Arizona. The contractor shall work with the site personnel to ensure project is accomplished in a timely manner.
1.1 Schedule: Provide qualified labor, supervision, equipment, and supplies/materials, necessary to Upgrade Air Handler Controls.
· All work is to be completed during normal business hours (M-F - 7:00am-3:00pm)
· Schedule work with Facilities Department.
7.1.1 Upgrade Air Handler Controllers for (4) Air Handlers:
BASE: Upgrade 4 Air Handler Controls ( One in Building 100 North - AHU 101, One in Building 100 South - AHU 102, and Two in Building 200 – AHUs 201 and 202):
1. Provide labor to remove existing Alerton Controls from 4 air handlers.
2. Supply and install a new Delta BACnet MSTP controller (or other non-proprietary equivalent) for each Air Handler (4 total).
3. Provide labor to create programming, map points to graphics, and perform a point-to-point check of the system.
2.0 Description of Work:
a) The Contractor will work with site personnel to ensure project is accomplished in a timely manner.
b) Contractor shall furnish all labor, materials, equipment, transportation, and field supervision for the completion of any requested project.
c) All removed hardware, debris and surplus materials resulting from all completed work shall be removed from the work area and disposed of properly after completion of the project.
d) Contractor shall schedule his work so that his working hours and the working hours of the location coincide (M-F -7:00am – 3:30pm). Should it be necessary to work hours other than the normal, regular working hours, the contractor shall arrange for access to the area with the location personnel.
e) Sanitation facilities: The contractor may use the government sanitary facilities. It is required that the contractor use these facilities in a responsible manner.
3.0 GENERAL REQUIREMENTS:
3.1 Existing Installations:
a. Contractor shall modify existing installations, as needed, to accommodate the new installation.
b. Contractor shall coordinate modification of existing installations with location personnel.
c. Contractor shall legally dispose all equipment / materials removed that will not be retained.
3.2 Installation:
a. It shall be the responsibility of the Contractor to complete work in accordance with the manufacturer’s recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the location personnel for immediate resolution.
3.3 Quality Control:
a. The work performed under this contract shall be subject to continuous audit by the location personnel. Quality control is the exclusive responsibility of the Contractor.
3.4 Protection of Work and Property/Safety Requirements:
a. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the COR.
3.5 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the location personnel.
3.6 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.9.8
3.7 Cleanup:
a. The construction site shall always be kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the location personnel.
3.8 Warranty:
a. Submit data concerning the standard warranty for workmanship, including the equipment warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
image1.jpeg image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .