QA_2_050218.pdf

PDF 137 KB Posted

Attached to
Road Base Aggregate Delivery Federal contract opportunity
Solicitation number
12850818R0007
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Questions and Answers 2 050218

View the file

Other files for this federal contract opportunity

Other files attached to Road Base Aggregate Delivery, newest first.
File Type Posted
12850818R0007_Amend_0001.pdf PDF
QA_1_041018.pdf PDF
12850818R0007_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12850818R0007

Questions and Answers 2

05/03/18

Q1. Page 5 article “I.1 Schedule of Items” please clarify that delivery point for Item “I.1.3” is actually “NFSR 900.1 near Yampa, CO” and NOT “NSFR 250.1”

A.1 Yes, I.1.3 should say NFSR 900.1. Additional funding has also become available and the Est. Qty. will increase from 800 to 1,300 tons. The government will issue an amendment to the solicitation

Q2. Page 5 article “I.1 Schedule of Items” Please provide us with definition of “grading U” as we could not locate the definition in FP-14 manual.

A2. Grading U is is defined in the Forest Service Supplemental Specifications Section 703 (pg 65 of the contract). That table is also provided below for clarity:

Table 703-3 Target Value Ranges for Subbase and Base Gradation

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

F G H S T U

1 ½ inch 100 100 1 inch 97 – 100 100 72 – 92 (6) 100

3/4 inch 76 – 89 (6) 97 – 100 97 – 100 100 1/2 inch 71 – 91 (6) 3/8 inch 56 – 68 (6) 70 – 80 (6) 80 – 92 (6) 51 – 71 (6) 71 – 90 (6)

No. 4 43 – 53 (7) 51 – 63 (7) 58 – 70 (7) 36 – 53 (7) 43 – 60 (7) 50 – 68 (7) No. 8 26 – 40 (6) 30 – 46 (6) 34 – 51 (6)

No. 16 23 – 32 (6) 28 – 39 (6) 28 – 40 (6) No. 40 15 – 23 (5) 19 – 27 (5) 16 – 26 (5) 14 – 25 (5) 16 – 28 (5) 19 – 30 (5)

No. 200 10.0 – 16.0 (4)

10.0 – 16.0 (4)

9.0 – 14.0 (4)

8.0 – 15.0 (4)

8.0 – 15.0 (4)

8.0 – 15.0 (4)

( ) The value in parentheses is the allowable deviation (±) from the target values.

If the Plasticity Index (PI) is greater than 0, the TV range for the No. 200 sieve size is 8 – 12 (4)

Q3. Please clarify if Spot Dumping of aggregate is sufficient to meet contract scope of work or Stockpiling of aggregate is required.

A3. On NFSR 900.1 ONLY, Contractor will coordinate with Forest Service personnel on site to windrow aggregate on the road while FS personnel spread it on road. At NFSR 250.1, Contractor shall stockpile aggregate; spot dumping will not be accepted.

Q4. Please elaborate if site preparation for Stockpiling is part of scope of contract or destination is already prepared for Stockpiling.

A4. Site preparation is not in the scope of the contract. Designated sites are already suitable for stockpiles

12850818R0007

Q5. Please verify which of the Specification tables provided in solicitation pgs. 64-66, are correspondent to CO Class 6 aggregate as requested in this solicitation.

A5. ’CO Class 6’ was written on page 1 of the solicitation in error; it will be corrected in the amendment.

Grading U as specified on pages 5 and 65 will be the standard for this contract. Some, but not all aggregate that meets CO Class 6 specs also meets Grading U specs. It will be the responsibility of the contractor to ensure aggregate meets Grading U; the government may verify test results (see FP-14 section 106 and FSSS to Section 106 on pages 53-55 of the contract).

Q6. Please see below table and attached document from CDPT specifying Class 6 aggregate; please confirm if below table complies with solicitation requirement.

A6. Please see answer to Number 5 above.