A-10_Attachment_5_Bridge_Inspection_Report.pdf

PDF 7 MB Posted

Attached to
Road Reconstruction - Owl Creek Federal contract opportunity
Solicitation number
1282MK18R0001
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Attachment 5

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NFSR 858 OWL CREEK ROAD RECONSTRUCTION

BRIDGE MAINTENANCE OPTIONAL PAY ITEMS

Contents Page

Summary of Pay Items ………………………………………………… 1

Pay Items Listing by Bridge ……………………………………………. 1

Bridge Existing Condition Photos and Notes

Bridge Mile Post

11.4 ………………………………………………………….. 3

20.0 ………………………………………………………….. 12

20.1 ………………………………………………………….. 20

24.9 ………………………………………………………….. 27

25.7 …………………………………………………………. 33

Summary of Pay Items

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

20201 Selective Clearing, disposal method F

Lump

Sum 3

57301 Clean Deck Square

Feet 6852

57302 Minor Bridge Repair Cubic

Feet 11

61705 Replacement Approach Rail Feet 685

TOTAL

Pay Items Listing by Bridge

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

20201 Selective Clearing, disposal method F LS 1

57301 Clean Deck SF 690

57302 Minor Bridge Repair CF 4

61705 Replacement Approach Rail LF 137

TOTAL

A - Bridge 858.0-11.40

Project Totals for All Bridges

NFSR 858 OWL CREEK ROAD RECONSTRUCTION

BRIDGE MAINTENANCE OPTIONAL PAY ITEMS

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

20201 Selective Clearing, disposal method F LS 1

57301 Clean Deck SF 714

57302 Minor Bridge Repair CF 2

61705 Replacement Approach Rail LF 137

TOTAL

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

20201 Selective Clearing, disposal method F LS 1

57301 Clean Deck SF 1820

57302 Minor Bridge Repair CF 2

61705 Replacement Approach Rail LF 137

TOTAL

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

57301 Clean Deck SF 2885

57302 Minor Bridge Repair CF 3

61705 Replacement Approach Rail LF 137

TOTAL

ITEM DESCRIPTION UNIT QTY

UNIT

PRICE TOTAL

57301 Clean Deck SF 743

61705 Replacement Approach Rail LF 137

TOTAL

E - Bridge 858.0-25.70

B - Bridge 858.0-20.0

C - Bridge 858.0-20.10

D - Bridge 858.0-24.90

Route: 858 Milepost: 11.40

OVER

COUNTY,

Insert Cover photo here.

FOREST SERVICE ROAD 855 WEST FORK CIMARRON RIVER

GUNNISON COLORADO

USFS858.0-11.40

UNCOMPAHGRE NATIONAL FOREST

USDA FOREST SERVICE, REGION 2

Milepost: 11.40

Notes:

20201 - Cut trees encroaching bridge and near wingwalls, see photo.

57301 - Remove excess (dirt, rock, debri, etc) material from bridge deck.

57302 - Patch pending spalls on upstream side of deck near first and second rail posts at Abutment 2, see photo.

61705 - Replace all approach rail and end rails to meet current standards, see drawings for details - rail lengths may vary to accommodate existing ground condition

** Fill low approach at Abutment 1 (see photo). Use aggregate from approved borrow pit. Work shall be incidental to road reconditioning pay item.

20201 Selective Clearing, disposal method F LS 1

57302 Minor Bridge Repair CF 4

61705 Replacement Approach Rail LF 137

57301 Clean Deck SF 690

Work Item Code REFERENCE NO. AND DESCRIPTION Unit Quantity

Structure Name: USFS858.0-11.40

Route: 858

Route: Milepost: 11.40

Structure Name: USFS858.0-11.40

BRIDGE - EXISTING CONDITIONS

(FOR REFERENCE ONLY)

Route: Milepost: 11.4

Insert photo here.

DECK LOOKING NORTHEAST

DECK LOOKING SOUTHWEST

Structure Name: USFS858.0-11.40

BRIDGE PHOTOS

Structure Name:

TYPICAL CONDITION OF JOINTS AT ABUTMENTS

USFS858.0-11.40

BRIDGE PHOTOS - cont.

LOW APPROACH AT ABUTMENT 1

Structure Name:

Insert photo here.

TYPICAL LIGHT ABRASION/SCRAPE MARKS ON DECK

USFS858.0-11.40

BRIDGE PHOTOS - cont.

TYPICAL SCRAPE MARKS WITH R1 RUSTING ON ALL APPROACH RAIL

Insert photo here.

SCRAPES WITH R1 RUSTING ON RAILS

Structure Name: USFS858.0-11.40

ELEVATION LOOKING NORTHWEST

ELEVATION LOOKING SOUTHEAST

Structure Name: USFS858.0-11.40

LARGE SPALL WITH EXPOSED ANCHOR BOLT - 1ST POST FROM A2 - UPSTREAM

SIDE

SPALLING AROUND BASE OF 2ND POST FROM A2 - UPSTREAM SIDE

Structure Name: USFS858.0-11.40

Route: 858 Milepost: 20.00

COUNTY,

USFS858.0-20.00

UNCOMPAHGRE NATIONAL FOREST

USDA FOREST SERVICE, REGION 2

ROAD BRIDGE INSPECTION REPORT

BRIDGE INSPECTION AND MANAGEMENT PROGRAM

Insert Cover photo here.

FOREST SERVICE ROAD 858 MIDDLE FORK CIMARRON RIVER

GUNNISON COLORADO

U.S. DEPARTMENT OF AGRICULTURE

20201 Selective Clearing, disposal method F LS 1

Structure Name: USFS858.0-20.00

Route: 858

Work Item Code REFERENCE NO. AND DESCRIPTION Unit Quantity

57301 Clean Deck SF 714

57302 Minor Bridge Repair CF 2

20201 - Cut trees encroaching bridge and near wingwalls, see photo.

57301 - Remove excess (dirt, rock, debri, etc) material from bridge deck.

57302 - Patch spall on upstream deck edge at center rail post, see photo.

61705 - Replace all approach rail and end rails to meet current standards, see drawings for details - rail lengths may vary to accommodate existing ground condition

** Fill erosion hole at west approach and potholes at northwest approach (see photo). Use aggregate from approved borrow pit. Work shall be incidental to road reconditioning pay item.

61705 Replacement Approach Rail LF 137

Milepost: 20.00

Route: Milepost: 20.00

Structure Name: USFS858.0-20.00

DECK LOOKING EAST

Structure Name:

DECK LOOKING WEST

USFS858.0-20.00

TYPICAL CONDITION OF CONCRETE DECK

TYPICAL SCRAPE MARKS WITH R1 RUSTING ON RAILS

CRACKING IN ABUTMENT HEADWALL - (TYP.) BOTH ABUTMENTS

Structure Name:

POTHOLE AT EAST APPROACH - NORTHEAST CORNER

USFS858.0-20.00

ELEVATION LOOKING NORTH

ELEVATION LOOKING SOUTH

ROADWAY SLOPE EROSION AROUND NORTHWEST CORNER

SPALL AT MIDSPAN - UPSTREAM SIDE

Route: 858 Milepost: 20.10

COUNTY,

USFS858.0-20.10

UNCOMPAHGRE NATIONAL FOREST

USDA FOREST SERVICE, REGION 2

Insert Cover photo here.

FOREST SERVICE ROAD 858 EAST FORK CIMARRON RIVER

Milepost: 20.10

20201 Selective Clearing, disposal method F LS 1

Structure Name: USFS858.0-20.10

Route: 858

Work Item Code REFERENCE NO. AND DESCRIPTION Unit Quantity

57301 Clean Deck SF 1820

57302 Minor Bridge Repair CF 3

20201 - Cut trees encroaching bridge and near wingwalls, see photo.

57301 - Remove excess (dirt, rock, debri, etc) material from bridge deck.

57302 - Patch pending spalls on upstream side of deck near first and second rail posts at Abutment 2.

61705 - Replace all approach rail and end rails to meet current standards, see drawings for details - rail lengths may vary to accommodate existing ground condition

** Fill low approach at Abutment 1 (see photo). Use aggregate from approved borrow pit. Work shall be incidental to road reconditioning pay item.

Route: Milepost: 20.10

Structure Name: USFS858.0-20.10

BRIDGE EXISTING CONDITION (FOR REFERENCE ONLY)

DECK LOOKING NORTHEAST

DECK LOOKING SOUTHWEST

Structure Name: USFS858.0-20.10

BRIDGE PHOTOS

CONDITION OF EXPANSION JOINT AT PIER 2 - FILLED WITH DIRT

Structure Name:

Insert photo here.

TYPICAL CONDITION OF DECK

USFS858.0-20.10

BRIDGE PHOTOS - cont.

SETTLEMENT AT NORTHEAST APPROACH A2

SETTLEMENT AT SOUTHWEST APPROACH A1

Structure Name: USFS858.0-20.10

ELEVATION LOOKING NORTHWEST

ELEVATION LOOKING SOUTHEAST

Structure Name: USFS858.0-20.10

Route: 858 Milepost: 24.90

COUNTY,

Insert Cover photo here.

FOREST SERVICE ROAD 858 CIMARRON RIVER

GUNNISON COLORADO

USFS858.0-24.90

GUNNISON NATIONAL FOREST

USDA FOREST SERVICE, REGION 2

Milepost: 24.9

57301 - Remove excess (dirt, rock, debri, etc) material from bridge deck.

57302 - Patch spall at notheast curb and southeast curb (see photos).

61705 - Replace all approach rail and end rails to meet current standards, see drawings for details - rail lengths may vary to accommodate existing ground condition

Structure Name: USFS858.0-24.90

Route: 858

57301 Clean Deck SF 2885

Work Item Code REFERENCE NO. AND DESCRIPTION Unit Quantity

57302 Minor Bridge Repair CF 3

Route: Milepost: 24.9

Structure Name: USFS858.0-24.90

DECK LOOKING SOUTHEAST

Structure Name:

DECK LOOKING NORTHWEST

USFS858.0-24.90

BRIDGE PHOTOS

IMPACT SPALL WITH EXPOSED REBAR AT NORTHEAST CURB

IMPACT SPALL WITH EXPOSED REBAR AT SOUTHEAST CURB

Structure Name: USFS858.0-24.90

ELEVATION LOOKING NORTHEAST

ELEVATION LOOKING SOUTHWEST

Structure Name: USFS858.0-24.90

Route: 858 Milepost: 25.70

COUNTY,

USFS858.0-25.70

GUNNISON NATIONAL FOREST

USDA FOREST SERVICE, REGION 2

Insert Cover photo here.

FOREST SERVICE ROAD 858 CIMARRON IRRIGATION

Milepost: 25.70

57301 - Remove excess (dirt, rock, debri, etc) material from bridge deck.

61705 - Replace all approach rail and end rails to meet current standards, see drawings for details - rail lengths may vary to accommodate existing ground condition.

61705 Replacement Approach Rail LF 137

57301 Clean Deck SF 743

Work Item Code REFERENCE NO. AND DESCRIPTION Unit Quantity

Structure Name: USFS858.0-25.70

Route: 858

Route: Milepost: 25.70

Structure Name: USFS858.0-25.70

DECK LOOKING SOUTH

Structure Name:

DECK LOOKING NORTH

USFS858.0-25.70

BRIDGE PHOTOS

Insert photo here.

SOUTHEAST APPROACH RAIL IMPACTED - NOT ATTACHED

SOUTHWEST APPROACH RAIL IMPACTED - POSTS BUSTED OFF

Structure Name: USFS858.0-25.70

ELEVATION LOOKING WEST

ELEVATION LOOKING EAST

Structure Name: USFS858.0-25.70

USFS858.0-11.40.pdf
Cover
4 Wk Items (2)
7-Sketches
6b-Photos
6c-Photos
6d-Photos
6f-Photos
6g-Photos
6h-Photos
USFS858.0-20.00.pdf
Cover
4 Wk Items (2)
7-Sketches
6a-Photos
6b-Photos
6c-Photos
6d-Photos
6e-Photos
6f-Photos
6g-Photos
6h-Photos
USFS858.0-20.10.pdf
Cover
4 Wk Items (2)
7-Sketches
6c-Photos
6d-Photos
6e-Photos
6g-Photos
USFS858.0-24.90.pdf
Cover
4 Wk Items (2)
7a-Sketches
6a-Photos
6b-Photos
6c-Photos
6d-Photos
6e-Photos
6f-Photos
6g-Photos
6h-Photos
USFS858.0-25.70.pdf
Cover
4 Wk Items (2)
6a-Photos
6b-Photos
6c-Photos
6d-Photos
6e-Photos
6f-Photos
6g-Photos
6h-Photos
6i-Photos
7-Sketches

File details come from the government source that posted it.