Attachment 11 - Pre Bid Meeting Questions and Answers and Vendor List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A-10_Amend_1_1282MK18R0001.pdf | ||
| A-10_1282MK18R0001.pdf | ||
| A-10_Attachment_2_Owl_Creek_Supplemental_Specifications.docx | DOCX document | |
| A-10_Attachment_1_OwlCreek_Cimarron_drawings_NEW.pdf | ||
| A-10_Attachment_2_Supplemental_Specifications.docx | DOCX document | |
| A-10_Attachment_4_Fire_Control_Plan.pdf | ||
| A-10_Attachment_9_Bid_Bond_SF24.pd.pdf | ||
| A-10_Attachment_7_Performance_Bond_SF25.pdf | ||
| A-10_Attachment_6_UtilizationBioBasedProducts.docx | DOCX document | |
| A-11_Attachment_10_ExperienceQuestionnaire.docx | DOCX document | |
| A-10_1282MK18R0001.pdf | ||
| A-10_Attachment_1_OwlCreek_Cimarron_drawings_NEW.pdf | ||
| A-10_Attachment_5_Bridge_Inspection_Report.pdf | ||
| A-10_Attachment_8_Payment_Bond_SF25A.pdf | ||
| A-10_Attachment_3_Wage_Determination_CO22.txt | TXT text file |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 11 Pre-Proposal Questions and Answers Owl Creek/Cimarron Road Reconstruction
1282MK18R0001
Pre-Proposal Meeting Held: April 10, 2018, 10:00 p.m. Mountain Time Location: US Forest Service, 2250 South Main Street, Delta, Colorado
Government Attendees Peggy Dobie, Contracting Officer Chris Phelps – Civil Engineering Tech.
Doug Marah – Civil Engineering Tech.
Daris Matos – Civil Engineer Grant Clark – West Zone Engineer
Vendor Attendees
| NAME |
| COMPANY NAME |
| PHONE # |
| EMAIL ADDRESS |
| Kyle Alstatt |
| Moody Construction |
| 970-250-5838 |
| kyleamu10@yahoo.com |
| Josh Zitting |
| Williams Construction |
| 970-327-4218 |
| josh@williamsconstruction.biz |
| EC Cates |
| Cate Land Ind |
| 775-761-5200 |
| catelandind@yahoo.com |
| Scott Davis |
| Rock & Company |
| 303-210-1523 |
| scott@rockandco.com |
| Ned Nauroth |
| Screamin Eagle Trucking & Excavating |
| 970-216-8831 |
| Naureth.se@gmail.com |
| Tyler Walter |
| HD Inc. |
| 719-499-3250 |
| twalter@hditeam.com |
| Bub Donelson |
| Screamin Eagle |
| 970-319-2268 |
| bub@screamingeaglecorp.com |
| Matt Reams |
| Reams Construction |
| 970-865-2886 |
| matt@reams-construction.com |
| Daniel Williams |
| Reams Construction |
| 970-865-2886 |
| jnelson@reams-construction.com |
| Kevin Neptune |
| Screamin Eagle |
| 970-216-7507 |
| neptunekevin79@gmail.com |
| Casey Mills |
| GCS LLC |
| 970-256-0465 |
| cmills@gcs-llc.net |
| Zane Luttrell |
| Rocky Mountain Aggregate |
| 970-249-8780 |
| zane@rockymountainaggregate.com |
| Michelle Hicks |
| Med Ved Global |
| Tammy |
| Med Ved Global |
| Chuck |
| Med Ved Global |
| Erin |
| Weminuche Construction |
| James |
| Weminuche Construction |
| Heidi Distel |
| Distel Contracting |
| 970-901-4062 |
| chuck@distelcontracting.com |
QUESTIONS DURING PRE-PROPOSAL MEETING:
During the pre-proposal meeting several questions were raised. Each question and answer is provided below:
Five Digit Numbers listed with each question refer to Section B – Schedule of Items
1. Provide details on - 25701 Retaining Wall lines and grades.
Answer: This retaining wall includes a portion about 40 feet wide, parallel to the road. Our goal is to build it back up to grade. It will require hiring a Geotechnical Engineer to come in and design. Our goal is to keep the road open, even it is single lane, during the entire project. You can propose closing access but would need to include what the value is to close access.
2. Is a traffic control plan required?
Answer: Yes it is required and must conform to MUTCD Standards.
3. Will there be additional add on for the borrow source?
Answer: NO Update: April 13, 2018
4. The repair items for the bridge locations 20201. How much deleterious material will we be required to remove and get rid of?
Answer: We feel that the cubic feet of deleterious material is accurate in our Schedule.
5. What is required for the work in the bridge locations?
Answer: Sand blast and refer to standard construction technique.
6. Is the contractor required to do sampling on the aggregate and crushing?
Answer: Yes, the vendor is responsible for quality control.
7. The bridge railing photos show scratch and scuff marks. Do these need repaired?
Answer: The intent is to realign those rails that are misaligned. Some of the rails are not to code and do not have the proper approach. The intent is to have the contractor replace the existing and realign them to code.
8. When does the road normally open and close.
Answer: That is variable depending on weather. The road is mostly on a northern exposure while the gravel pit is on a southern exposure.
OTHER INFORMATION:
Vendors should pay special attention to Sections L and M of the solicitation and the date and time responses are due.