A-10_Exhibit_1_Detailed_Info_Chart.docx

DOCX document 31 KB Posted

Attached to
Tree Planting Services Federal contract opportunity
Solicitation number
1282MK18Q0006
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Exhibit 1

View the file

Other files for this federal contract opportunity

Other files attached to Tree Planting Services, newest first.
File Type Posted
A-10_Exhibit_9_Inspection_Scores_Calculation.pdf PDF
A-10_Exhibit_11_Employment_of_Eligible_Workers.docx DOCX document
A-10_Exhibit_10_-__Fire_Control_Plan.pdf PDF
A-10_1282MK18Q0006.pdf PDF
A-10_Exhibit_3_FSH2409.17.doc DOC document
A-10_Exhibit_2-Maps.pdf PDF
A-10_Exhibit_5_Sample_Inspection.doc DOC document
A-10_Exhibit_7_Safety.docx DOCX document
A-10_Exhibit_8_Images.docx DOCX document
A-10_Exhibit_4_Planting_Inspection_Sheet.doc DOC document
A-10_Exhibit_6_Wage_Determination_01162018.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2018 GMUG Tree Planting ProjectExhibit 1 - 1282MK18Q0006
Grand Mesa-Uncompahgre-Gunnison National ForestsPage 1 of 5

Exhibit 1 Tree Planting – DETAILED INFORMATION CHART

Item 1, 2, 4 and 5– Highway 149 Project Area

Sub-item or Planting Unit
1-10
1-11
1-12
2-26
2-3
FACTS ID
850201EXTR-010
850201EXTR-011
850201EXTR-012
850201H149-026
850209RAMB-003
Unit Name
Extra Salvage Unit 10
Extra Salvage Unit 11
Extra Salvage Unit 12
Hwy 149 Unit 26 Landing
Rambo Salvage Unit 3
FACTS Acres
30
59
77
7
136
Net Planting Acres
25
59
77
0.5
63
Portion Net Planting Acres With Plantable Spots
0.85
0.9
0.9
0.9
.85
Desired TPA
436
436
436
436
436
Estimated Number of Trees Needed
11,200
23,200
30,300
200
23,400
Average Spacing C.4.4.5
10’x 10’
10’x 10’
10’x 10’
10’x10’
10’x10’
Seed Lot C.4.4.9
PIEN-246-106-11
PIEN-246-106-11
PIEN-243-110-94
PIEN-246-106-11
PIEN-243-110-94
Boundary Marking - See Project Map 1
Pink tree paint exterior.
Pink tree paint exterior.
Pink tree paint exterior.
Blue flagline and pin flags on roadside.
Orange tree paint exterior.
Non-planting Areas C.4.4.11
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Tree Shelter Type C.4.5
N/A
N/A
N/A
Tree Shade Cards
Tree Shade Cards
Average Aspect
E
E
NE
E
NW
Average Slope
8%
7%
7%
0%
20%
Average Elevation
11,300
11,200’
10,800’
10,800’
10,600
Direct Vehicle Access1
Yes
Yes
Yes
Yes
Yes
Walk-in Distance in Feet to Center Unit
650 feet
1000 feet
600 feet
150 feet
Delivery Point
At pull offs along Highway 149. And NFSR 473.0
At pull offs along Highway 149.
At pull offs along Highway 149.
At pull offs along Highway 149.
Along FR 735.0
Alternative Delivery Point
NA
NA
NA
NA
NA

1Vehicle Access C.4.1.1 and C.4.1.4. All roads may be impassible when wet or snow covered.

Item 2 and 4– Perfecto- Chavez Project Area

Sub-item or Planting Unit
2-9
2-9.1
2-9.2
2-47
FACTS ID
870106PFSS-P09
870106PFSS-P9A
870106PFSS-PBC
870101NCSS-047
Unit Name
Perfecto Salvage Unit 9
Perfecto Salvage 9A
Perfecto Salvage 9A
Nutras Creek Roadside Unit 47
FACTS Acres
28
11
7
3
Net Planting Acres
27.9
10.9
6.7
2.6
Portion Net Planting Acres With Plantable Spots
0.63
0.72
0.6
0.73
Desired TPA
538
538
302
680
Estimated Number of Trees Needed
9,500
4,300
1,300
1,300
Average Spacing C.4.4.5
9’x 9’
9’x 9’
12’x12’
8’x8’
Seed Lot C.4.4.9
PIEN-243-110-94
PIEN-243-110-94
PIAR-243-104-09
PIEN-243-110-94
Boundary Marking - See Project Maps 1&2
Blue flagline and pin flags on roadside.
Blue flagline and pin flags on roadside.
Blue flagline and pin flags on roadside.
Orange tree paint exterior.
Non-planting Areas C.4.4.11
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Tree Shelter Type C.4.5
Tree Shade Cards
Tree Shade Cards
Tree Shade Cards
Tree Shade Cards
Average Aspect
E
E
E
N
Average Slope
10%
10%
10%
5%
Average Elevation
11,100’
11,200’
11,200’
10,900’
Vehicle Access1
Yes
Yes
Yes
Yes
Walk-in Distance in Feet to Center Unit
500 feet
1,600 feet
1,600 feet
100 feet
Delivery Point
At pull offs along FR 794.2H.
At pull offs along FR 794.0.
At pull offs along 794.0
At pull offs along 794.0
Alternative Delivery Point
NA
NA
NA
NA

Item 2 and 4– Perfecto- Chavez Project Area

Sub-item or Planting Unit
2-46

Bid Item 1 Totals Bid Item 2 Totals

FACTS ID
870101CCSS-046
Unit Name
Chavez Creek Roadside Unit 46
FACTS Acres
13
166
205
Net Planting Acres
12.8
166
124
Portion Net Planting Acres With Plantable Spots
.9
Desired TPA
538
Estimated Number of Trees Needed
6,200
64,700
46,200
Average Spacing C.4.4.5
9’x 9’
Seed Lot C.4.4.9
PIEN-243-110-94
Boundary Marking - See Project Maps 1&2
Orange tree paint exterior.
Non-planting Areas C.4.4.11
Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration.
Tree Shelter Type C.4.5
Tree Shade Cards
Average Aspect
N
Average Slope
5%
Average Elevation
11,500’
Vehicle Access1
Yes
Walk-in Distance in Feet to Center Unit
100 feet
Delivery Point
At pull offs along Highway NFSR 794.0
Alternative Delivery Point
NA

Item 3 & 6– Kings Spruce Salvage

Sub-item or Planting Unit
3-1
3-2
3-3

Bid Item 3 Totals

FACTS ID
1501073001-000
1501073002-000
1501073003-000
Unit Name
Kings Spruce Unit 1
Kings Spruce Unit 2
Kings Spruce Unit 3
FACTS Acres
86
83
76
Net Planting Acres
14.2
10.1
4.8

29.1

Portion Net Planting Acres With Plantable Spots
0.7
0.7
0.7
Desired TPA
538
538
538
Estimated Number of Trees Needed
5,400
3,800
1,800

11,000

Average Spacing C.4.4.5
9’x 9’
9’x 9’
9’x 9’
Seed Lot C.4.4.9
PIEN-223-095-77
PIEN-223-095-77
PIEN-223-095-77
Boundary Marking - See Project Map 3
Blue flagline around plantable areas.
Blue flagline around plantable areas.
Blue flagline around plantable areas.
Non-planting Areas C.4.4.11
Rocky areas, large slash areas, woody debris beds, untreated pile burn ash pits, roadsides, areas of advanced regeneration, wet areas.
Rocky areas, large slash areas, woody debris beds, unburned slash piles, untreated pile burn ash pits, roadsides, areas of advanced regeneration, wet areas.
Rocky areas, large slash areas, woody debris beds, unburned slash piles, untreated pile burn ash pits, roadsides, areas of advanced regeneration.
Tree Shelter Type C.4.5
N/A
N/A
N/A
Average Aspect
W
W
W
Average Slope
5%
5%
5%
Average Elevation
10,600’
10,700’
10,700’
Vehicle Access1
Yes
Yes
Yes
Walk-in Distance in Feet to Center Unit
1,000 feet
2,000 feet
4,000 feet
Delivery Point
At pull offs along NFSR 100.0.
At pull offs along County Road 65.
At pull offs along County Road 65.
Alternative Delivery Point
NA
NA
NA

Section J – Exhibit 1 (Continued) Tree Planting – DETAILED INFORMATION CHART

General Location
Highway 149, Kings Spruce, and Perfecto-Chavez Project Areas
Bid Items
1, 2, 3, 4, 5, and 6

Trees - Planting Stock C.3.5

Species to plant
Engelmann Spruce (ES), Bristlecone Pine (BP)
Stock Type
Container
Age
1-year

Tree Planting C.4.4

Clearing C.4.4.2

Minimum diameter (inches)
18”
Maximum depth (inches)
Surface

Scalping C.4.4.2

Minimum diameter (inches)
18”
Maximum depth (inches)
2” or Mineral Soil

Shade and Protection C.4.4.3

Down Log (min. diameter & length) 6” & 2 ft.

Stump (minimum diameter & height) 8” & 6”

Standing Dead Tree (minimum dbh) 8 inches

Rock (minimum diameter & height)
8” & 6”
Max. distance plant from the above microsite protection materials
4 inches

Shade / Protection Requirements

Tree Shade Cards C.4.5

In Items 2 and 4, all Sub-items Shade cards to be placed at 2 to 4-inches from seedling base to south-southwest of seedling (azimuth 210o + 30o).

Tree Shade Cards Not Available C.4.4.3
4. Stationary material first, transportable shade second, plant in open last. A tree shall be planted next to stationary material when it is available. If stationary material does not exist in the spacing allowance, shade shall be transported to the tree. When neither stationary nor transportable material exists, the tree may be planted in the open.

Acceptable Established Trees C.4.4.6

Species
Any Species
Height (inches)
6

File details come from the government source that posted it.