B01c_Between_IRSC_Appendix_C_Road_Maint.doc

DOC document 77 KB Posted

Attached to
Between Integrated Resource Stewardship Contract (IRSC) Federal contract opportunity
Solicitation number
1282CS19Q4006
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Appendix C

View the file

Other files for this federal contract opportunity

Other files attached to Between Integrated Resource Stewardship Contract (IRSC), newest first.
File Type Posted
B01f_Between_LoggingMap.pdf PDF
B01a_Between_IRSC_Appendix_A.docx DOCX document
B01e_Between_Vicinity.pdf PDF
B01_1282CS19Q4006_SF1449_Between_IRSC.pdf PDF
B01g_WD_1976-1351_Rev56_20190312.pdf PDF
B01b_Between_IRSC_Appendix_B_Scaled.doc DOC document
B01d_Between_CAM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: 1282CS19Q4006 Between IRSC

Appendix C

ROAD MAINTENANCE PLAN

CT5.31# – ROAD MAINTENANCE REQUIREMENTS

Between IRSC Timber Sale T- Specification T-800, T802, T-805, T-807, T808 (included below for further explanation of maintenance requirements) Road Segments Used: (See Map)

Segment
Maint.

Level

Termini
Length
Segment Volume
Estimated Loads
Maintenance Responsibility
NFSR 504
III - SL

(Local)

MP 0.0 to MP 7.5
7.5 miles
812 CCF
82 Loads
Contractor (C)
NFSR 506
III – SL

(Local)

MP 0 to MP 4.5
4.5 miles
812 CCF
82 Loads
Contractor

(C)

NFSR 506
II- SL

(Local)

MP 4.5 to MP 4.7
0.2 miles
249 CCF
25 Loads
Contractor (C)
NFSR 215
II- SL

(Local)

MP 2.7 to MP 2.1
0.6 miles
373 CCF
38 Loads
Contractor (C)
NFSR 506.M
II- SL

(Local)

MP 0.0 to MP 1.0
1.0 miles
249 CCF
25 Loads
Contractor (C)

Maintenance Needs:

Pre, During and Post haul Prior to start of operations purchaser will ensure roads are maintained and water control structure function is in place.The purchaser will be restricted from using the roads at the time it is determined that unacceptable road damage could occurred. Use may resume at such time as the road conditions improve and , if necessary, the road promptly repaired. Unacceptable road damage ocurrs on gravel roads when a maximum of 1-inch ruts occur or when contamination of the existing aggregate base or surfacing occurs.Unacceptable road damage ocurrs on native surface roads when a maximum of 4-inch ruts occur. No blading of material off the road running surface, such as into adjacent vegetation or trees, or over fill slopes will be allowed.

Existing temporary roads may be used as temporary roads by the purchaser in order to efficiently harvest the sale. No new temporary roads will be authorized in existing meadows, however new temporary roads in forested areas may be individually approved.

Temporary roads or any temporary roads used during the harvest operation shall be decommissioned (inactivated) by the purchaser as directed by the Forest Service after timber hauling is completed.

Decommissioning shall consist of the following work: ripping the roadbed to a minimum 4” and maximum 6” depth, slashed-in, seeding with enclosed seed mix, and constructing nondrivable waterbars at locations approved by the Forest Service. The nondrivable waterbars shall be constructed as per attached drawing and as per the enclosed spacing table.

The operator shall maintain Forest Service Roads used in conjunction with operations as herein outlined:

1) Keep drainage channels, ditches, and culverts clear of debris and functioning as intended.

2) Repair fences, gates, cattle guards, culverts, bridges and other structures to standard specifications if damaged during harvest or haul operations.

3) When road condition warrant purchaser shall blade and shape surface and shoulders to maintain a suitable riding surface. Earth and debris from side ditches, slides, or other sources must not be left on the road or mixed into the surface portions of the road. Blading shall not undercut banks. Gravel or other selected surface material shall not be bladed off the surface of the road. Material from slides or other sources requiring removal from the road shall not be deposited in streams or stream channels or at locations where it will wash into streams and cause damage through silting or obstruction of the streams or reservoirs.

4) All maintenance shall be performed as needed, in a timely manner or when directed by the Forest Service. In addition, at the end of each operating season, maintenance work shall be performed to minimize damage from adverse weather. Such work shall include final blading to remove ruts and other irregularities that would prevent normal surface runoff, and final clearing of ditches and culverts to ensure satisfactory functioning of the road drainage system.

MAXIMUM NONDRIVABLE WATERBAR SPACING (in feet)

Unified Soil Classification – ASTM D2487

Road Grade (%)
ML, SM

Extr. Erodible

Silts-sands with little or no binder

(d.g.)

MH, SC, CL

Highly Erodible

Silts-sands with moderate binder

SW, SP,GM, GC

Mod. Erodible

Gravels + fines & sands with little or no fines

GW, GP

Low Erodible

Gravels with little or no fines

1-3
600
1000
1000
1000
4-6
300
540
680
1000
7-9
200
360
450
670
10-12
150
270
340
510
13-15
120
220
270
410

1. ALL WATER BARS SHALL BEGIN AT THE INTERSECTION OF THE ROADBED AND CUT SLOPE AND RUN ACROSS THE ENTIRE WIDTH OF THE ROADBED.

2. ALL WATER BARS SHALL HAVE FREE FLOWING OUTLETS.

3. WHEN STAKES ARE USED, THEY DESIGNATE THE OUTLET LOCATION.

SEED MIX & APPLICATION RATE

Refer to K-G.6.0.1 Erosion Control Seeding (11/2006) mix and application rates T- Specification

SPECIFICATION T-800 DEFINITIONS

Wherever the following terms or pronouns are used in Specifications T-801 through T-811, the intent and meaning shall be interpreted as follows:

800-1.1 - Agreement. Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.

These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.

It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.

800-1.2 - Annual Road Maintenance Plan. A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.

800-1.3 - Base Course. Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.

800-1.4 - Berm. Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.

800-1.5 - Borrow. Select Material taken from designated borrow sites.

800-1.6 - Crown, Inslope, and Outslope. The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.

800-1.7 - Culverts. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.

800-1.8 - Drainage Dip. A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.

800-1.9 - Drainage Structures. Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, and the like.

800-1.10 - Dust Abatement Plan. A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.

800-1.11 - Lead-off Ditches. A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.

800-1.12 - Material. Any substances specified for use in the performance of the work.

800-1.13 - Prehaul Maintenance. Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Purchaser's use, provided Purchaser's Operations do not damage improvements under B6.22 or National Forest resources and hauling can be done safely. This work will be shown in the Annual Road Maintenance Plan as provided in C5.31#.

Prehaul Maintenance work the Purchaser elects to perform will be in compliance with the Road Maintenance T-Specifications.

800-1.14 - Roadbed. The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.

800-1.15 - Road Maintenance Plan. A table which shows applicable road maintenance specifications to be performed by Purchaser on specific roads.

800-1.16 - Roadside. A general term denoting the area adjoining the outer edge of the Roadway.

800-1.17 - Roadway. The portion of a road within the limits of excavation and embankment.

800-1.18 - Shoulder. That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.

800-1.19 - Slide. A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.

800-1.20 - Slough. Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.

800-1.21 - Slump. A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.

800-1.22 - Special Project Specifications. Specifications which detail conditions and requirements peculiar to the individual project.

800-1.23 - Subgrade. Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.

800-1.24 - Surface Course. The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.

800-1.25 - Surface Treatment Plan. A table which lists the roads and surface treatments to be applied.

800-1.26 - Traveled Way. That portion of Roadway, excluding Shoulders, used for the movement of vehicles.

800-1.27 - Turnouts. That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.

800-1.28 - Water Source. A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.

800-1.29 - Waterbar. A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A Waterbar is not designed to be traversable by logging trucks.

SPECIFICATION T-802 DITCH CLEANING

DESCRIPTION

1.1 Ditch cleaning is removing and disposing of all Slough Material from Roadway ditches to provide a free-draining waterway.

REQUIREMENTS

3.1 Ditch cleaning shall be repeated during the year as often as necessary to facilitate proper drainage.

3.2 All Slough Material or other debris which might obstruct water flow in the Roadway ditch shall be removed. Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated Berms in conjunction with Surface Blading T-803 operations.

Material removed from ditches that is not by Agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site designated by the Forest Service.

3.3 Roadway backslope or Berm shall not be undercut.

SPECIFICATION T-805 DRAINAGE STRUCTURE

DESCRIPTION

1.1 This work consists of maintaining Drainage Structures and related items such as inlet and outlet channels, existing riprap, trash racks, and dropinlets.

MATERIALS

2.1 All Materials used in the maintenance of Drainage Structures shall conform by type and specification to the Material in the structure being maintained.

REQUIREMENTS

3.1 Drainage Structures and related items shall be cleared of all foreign Material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into maintenance work shall be hauled to a disposal site designated by the Forest Service.

3.2 If outlet or inlet riprap was installed by Purchaser as a construction item or existed prior to Purchaser's haul, it shall be maintained in good condition including the replacement of riprap if necessary to previous line, grade, and cross-section.

3.3 Perform maintenance to insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure

SPECIFICATION T-807 ROADWAY VEGETATION

DESCRIPTION

1.1 This work includes removal of brush and trees from within the Roadway limits.

REQUIREMENTS

3.1 Vegetative matter within the Roadway which impedes vehicular travel or interferes with road maintenance operations, such as surface blading and ditch and culvert cleaning shall be removed. Downed timber meeting utilization standards shall be cut in appropriate lengths and decked along the Roadside in locations where the Traveled Way or sight distances will not be impaired.

3.2 Vegetative matter removed from the Roadway shall be treated by the specified method and as required by C6.7#.

SPECIFICATION T-808 MISCELLANEOUS STRUCTURES

DESCRIPTION

1.1 Maintenance of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.

MATERIALS

2.1 Any Materials needed in the maintenance of miscellaneous structures shall be similar in type and quality to the Material in the structure being maintained.

REQUIREMENTS

3.1 Cattleguards. Loose rails shall be welded or bolted back in place.

Excess Material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.

3.2 Gates. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.

Brush and debris shall be removed from within the swinging radius.

PAGE

File details come from the government source that posted it.