Specifications.pdf

PDF 1 MB Posted

Attached to
Modular Building Roofing Repair Federal contract opportunity
Solicitation number
1282A720Q0042
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Modular Building Roofing Repair, newest first.
File Type Posted
Sol_1282A720Q0042.pdf PDF
WDOL-Lincoln Co., OR.pdf PDF
Sol_1282A720Q0042.pdf PDF
RoofPlans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service Project Specifications

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 1 of 8 General Requirements

PART 1 - GENERAL

1.01 SUMMARY

A. Location

SECTION 01 29 77

GENERAL REQUIREMENTS

Angell Job Corps and Conservation Center 335 NE Blodgett Road Yachats, OR 97498

541.547.5690 (front Office) Point of Contact: Jeffrey Bolles; 541.547.5621

B. Work:

1. Furnishing all labor, materials, equipment, management, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.

C. Payment:

1. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, as shown on the drawings, and as staked in the field.

2. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.

1.02 QUALITY ASSURANCE

A. Errors and Omissions: Any errors found in plans or specifications shall be brought to the attention of the CO. Contractor is responsible for execution all work to meet applicable codes. Discovery of errors does not relieve contractor from responsibility to perform all work to meet standards and codes.

B. Resolve all conflicts with applicable regulations. Prepare and submit to the CO all additional clarifying details including substitute methods and materials as needed to secure the required approval and resolve conflicts.

1.03 DETERMINATION OF QUANTITIES

A. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.

B. Quantity Measurements:

1. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Contract Quantity or Lump Sum Quantity (LSQ).

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 2 of 8 General Requirements

2. The contractor shall compute the quantities for periodic progress payments; the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.

3. All Contractor measurements are subject to verification.

4. When requested by the CO, the Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.

5. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

C. The following measurements and calculations are used to determine contract quantities.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three dimensional methods.

3. Structures shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipes shall be measured along center of invert.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items--such as fence, wire, plates, rolled shapes, pipe conduits--identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

1.04 INSPECTION OF CONSTRUCTION (AUG. 1996)

A. Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

C. Government inspections and tests are for the sole benefit of the Government and do not --

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 3 of 8 General Requirements

1. Relieve the Contractor of responsibility for providing adequate quality control measures;

2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

3. Constitute or imply acceptance; or

4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) of this section.

D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

E. The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

G. If the Contractor does not promptly replace or correct rejected work, the Government may -

1. By contract or otherwise, replace or correct the work and charge the cost to the

Contractor; or

2. Terminate for default the Contractor’s right to proceed.

H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 4 of 8 General Requirements

1.05 DEFINITION OF BID ITEMS

A. Schedule of Items:

1. Provide pricing for all items listed in the Schedule of Items. Place “0.00” if there is zero price for the item.

2. Contract award will be made for the Base Items, subject to availability of funds.

B. Base items –

1. Repair Top Chord

a. The EACH price shown in the Schedule of Items includes all material, equipment, labor, and incidents to reinforce the top chord of the trusses needing repairs

b. The Unit Price is for up to four (4) feet of splice as measured on one side of the top chord.

2. Replace roof

a. Payment: The contract LUMP SUM price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to demolish the existing built-up flat roof and construct a sloped, metal roof. Work includes, but is not limited to:

b. Removal and disposal of all roof components, gutters and scudders, flashings, etc. to the top of the trusses.

c. Supply and installation ripped lumber and appurtenances, plywood, metal roofing, gutters and downspouts, flashings, etc. as required to have a complete weatherproof roof system.

1.06 USE OF PREMISES

A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations.

C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

1.07 WORK RESTRICTIONS

Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.

1.08 PROJECT SCHEDULING

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 5 of 8 General Requirements

Coordinate and schedule work with Contracting Officer to minimize impacts to center operations.

1.10 CONTRACTOR’S RESPONSIBILITIES

A. Confine storage of materials to areas as approved by the CO.

B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.

1.11 FIELD VERIFICATION

Field verify all new and existing dimensions affecting the work of this contract before ordering products.

1.12 ACCIDENT PREVENTION

A. DESCRIPTION

This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.

B. SUBMITTALS

1. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. Notice to proceed will not be made until the plan is received. As a minimum the plan shall include:

a. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.

b. Name and contact information of supervisor responsible to carry out the plan.

c. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

d. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.

2. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.

3. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.

4. Submit a brief report of safety meetings and of inspections.

5. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

C. QUALITY ASSURANCE

1. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 6 of 8 General Requirements the requirements of this section and related sections may result in suspension of work.Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.

D. ACCIDENT REPORTING

1. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.

2. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the CO and other officials as required in the investigation of the accident.

E. FIRST AID FACILITIES

Provide adequate facilities for the number of employees and the type of construction at the site.

F. PERSONNEL PROTECTIVE EQUIPMENT

Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.

G. EMERGENCY INSTRUCTIONS

Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

H. PROTECTIVE EQUIPMENT

Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.

Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.

I. SAFETY MEETINGS

As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.

J. HARD HATS AND PROTECTIVE EQUIPMENT AREAS

1. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.

2. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.

K. TRAINING

1. First Aid: Provide adequate training to ensure prompt and efficient first aid.

2. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. acciDent prevention

Jan 2019 Modular Building Roof Replacement 01 29 77 Page 7 of 8 General Requirements

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 01 29 77

Jan 2019 Modular Building Roof Replacement 01 33 00 Page 1 of 4 Submittals Procedures

SECTION 01 33 00

SUBMITTALS PROCEDURES

PART 1 - GENERAL

1.01 DESCRIPTION

A. The work of this section consists of general submittal requirements before and during construction.

B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1.02 RELATED REQUIREMENTS

A. Closeout submittals - Section 01 77 00.

B. Other Sections with specific submittal requirements.

1.03 SUBMITTAL AND APPROVAL PROCEDURES

A. All submittals shall be transmitted in the formal described below.

B. Submittals will not be required if the product(s) will not be part of the permanent structure.

An example would be devices used in the construction of forms for cast in-place concrete.

1.04 MATERIAL SUBMITTALS

A. Submit electronic copies of catalog cuts, shop drawings, diagrams and manufacturing installation. Put the specification items number on each cut sheet.

B. Submittal format: The contractor shall supply all submittals in original manufacturer’s PDF cut sheets on all material and equipment.

1. Transmit all pdf cut sheets, drawings, etc. electronically a single file. A separate file for the repair of the roof can be submitted for approval after the Option Item(s) have been exercised.

2. Group information in the file by Specification Section and Paragraph Numbers.

3. Index the file for easy reference

C. Obtain written approval for the above submittals prior to construction, assembly, and delivery.

D. Furnish complete material submittals whenever possible. Partial submittals will be considered only to allow timely ordering of materials.

E. Submittals shall have sufficient detail to determine if ratings, characteristics, and physical construction are equivalent to those specified.

F. Where manufacturer's catalog sheets are used,

1. Indicate the specific items to be supplied in ink either by arrow, encircled on the sheet, or the inapplicable portion(s) blocked out.

2. List manufacturer's name, contract, specification section and drawing sheet reference number (if applicable) on each catalog sheet.

3. Identify where equipment is to be used, if not obvious.

Jan 2019 Modular Building Roof Replacement 01 33 00 Page 2 of 4 Submittals Procedures

4. Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

5. Submittals shall show any changes to be made resulting from substitution of equipment or materials for those that are specified.

G. Shop Drawings: Include the following information with each copy of shop drawings.

Other specification sections may require additional information on the drawings.

1. Firm or entity that prepared each submittal clearly at the top of each submittal. Name and address of the prime Contractor

2. Project name.

3. Date.

4. Date of revisions (when applicable).

5. Professional Engineer’s Stamp and Signature where required.

6. Contractor's certification that shop drawing has been checked for compliance with contract documents.

7. Number and title of appropriate Specification Section and drawing number and detail reference as appropriate.

8. Details of fabrication, assembly and erection including connections and engagement to contiguous work.

9. Materials used and manufacturer’s information.

10. All required dimensions.

11. The term "by others" shall not be used. All work shall be identified by Contractor’s or subcontractor’s name, discipline, or trade.

H. Samples: Samples shall be large enough to illustrate clearly the functional characteristics.

I. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until Project Acceptance.

J. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

K. Approved Equals:

1. For each item proposed as an "Equal” to a specified item, submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

Jan 2019 Modular Building Roof Replacement 01 33 00 Page 3 of 4 Submittals Procedures

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the warranties for the proposed item that are at least equal to the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waivers all claims for additional expenses that may be incurred as a result of the substitution.

L. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.

M. Submittal Identification:

1. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must have the Identification information uniquely identifying the submittal, manufacturer, date, specification section stamped on the submittal.

2. Identification information of the submittal and specification section shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.

N. Submittal Numbering:

1. Number each submittal consecutively.

2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.

3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.

O. Contracting Officer's Review:

1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; submittals are illegible.

2. Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.

3. After reviewing submittals, the Contracting Officer will return applicable (marked

up) submittal sheets or shop drawings to the Contractor. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.

4. The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

Jan 2019 South Wall Replacement 01 33 00 Page 4 of 4 Submittals Procedures

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified. The Contractor shall allow an additional 15 days for CO approval of resubmittals. The total Contract Time will not be changed due to the Contractor having to resubmittals.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION

Jan. 2019 Modular Building Roof Replacement 02 41 13 Page 1 of 1

Selective Demolition

PART 1 - GENERAL

1.01 DESCRIPTION

SECTION 02 41 13

SELECTIVE DEMOLITION

A. The work of this section consists of demolition and removal of elements as shown on the drawings and other related items needed to complete this Contract.

1.02 SUBMITTALS

A. As specified in Section 01 77 00.

B. Temporary wall bracing

1. Submit a drawing(s) or narrative showing how the building will be supported when the corner column(s) have been removed.

2. The submittal will bear the signature and stamp of the responsible Architect or Engineer, licensed in the State of Oregon.

1.03 QUALITY ASSURANCE

A. Comply with safety requirements for demolition, ANSI A10.6-90.

1.04 PROJECT CONDITIONS

A. Keep dust to a minimum at removal site and on haul roads. Use sprinklers or water trucks as necessary.

B. Ensure safety of persons in demolition area. Provide temporary barricades as required.

C. Explosives: Not Permitted.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.01 PREPARATION

A. Protect buildings, structures, utilities, and vegetation to remain.

3.02 DISPOSAL

A. Dispose of unsuitable and excess material from off Federal Land and in a lawful manner.

Jan. 2019 Modular Building Roof Replacement 06 10 00 - 6/4 Rough Carpentry

SECTION 06 10 00

ROUGH CARPENTRY

PART 1 GENERAL

1.01 SUMMARY

A. This section specifies rough carpentry, including all framing, sheathing, and underlayment.

1.02 RELATED SECTIONS

A. 06 18 00 – Glulaminated Lumber

1.03 QUALITY ASSURANCE

A. Furnish materials complying with the following:

1. Softwood Lumber.

a. Graded in accordance with the latest edition of "Standard Grading Rules

No. 17,” WCLIB, or "Western Grading Rules," WWPA. Lumber grades specified below are taken from "Standard Grading Rules, No. 17." Equal grades from "Western Grading Rules" are acceptable. Furnish lumber bearing a recognized grading bureau mark or a "Certificate of Grade" may be substituted. Where a grade for Douglas Fir (DF) species is indicated, other species, if approved by the COR, may be supplied on an equal stress grade basis.

2. Pressure Treatment, Lumber and Plywood.

a. Waterborne, conforming to AWPA C2, AWPA P5.

3. Plywood.

a. Graded in accordance with APA PS 1, current edition. Furnish panels identifiable by a grade trademark of a recognized grading association.

Index numbers listed (i.e. 24/0) may be larger but not smaller than shown.

b. OSB Not acceptable

4. Texture 1-11 Siding.

a. Match existing siding on west side of building.

b. Size: 48 inches x 120 inches

5. All materials and construction techniques shall meet applicable Local codes or the requirements herein, whichever is stricter.

B. All lumber materials shall be FSC Certified.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Lumber.

1. Furnish S4S lumber, unless otherwise shown on drawings. Furnish lumber with a moisture content of 19 percent or less for material 3 inches and less in nominal thickness, unless otherwise specified.

B. Felt.

Jan. 2019 Modular Building Roof Replacement 06 10 00 - 7/4 Rough Carpentry

1. Wall: ASTM D 226, type II, 30 pounds/100 square feet.

2. Roof: ASTM D 226, type I, 30 pounds/100 square feet.

C. Exterior Sheathing.

1. Roof Sheathing.

a. (Concealed Surfaces) 5/8 inch CDX exterior plywood, 24/0; (Exposed surface) 1/2 inch C-C ext., plywood 24/0.

PART 3 - EXECUTION

3.01 CONSTRUCTION

A. Exterior Sheathing.

1. Install roof and wall sheathing at right angles to supports. Stagger end joints a minimum of 1 span.

B. Treated Wood.

1. Field treat cuts and holes in pressure treated members with two coats of copper naphthenate.

2. Install pressure treated wood in contact with concrete.

C. Exposed Hardware.

1. Provide rough hardware for the proper installation of work. Install hot-dipped galvanized hardware, nails, bolts, etc. at locations exposed to the weather.

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 1 of 7 Preformed Metal Roof Panels

SECTION 07 41 13

PREFORMED METAL ROOF

PART 1 – GENERAL

1.01 DESCRIPTION

A. General

1. Design of the lateral load resisting system.

2. Furnish all labor, material, tools, equipment and services for all preformed roofing as indicated, in accord with the provisions of the Contract Documents.

3. All components including, but not limited to, panels, panel clips, trim/flashing, fascias, ridge, closures, sealants, fillers and any other required items, will be supplied and/or approved by a single manufacturer.

4. Completely coordinate with work of all other trades.

5. See Division 1 for General Requirements.

B. Related work specified elsewhere

1. Rough Carpentry: Section 61 00 00

2. Flashing and sheet metal: Section 07 60 00.

C. Definitions

1. OSSC: Oregon Structural Safety Code

1.02 QUALITY ASSURANCE

A. Applicable standards

1. ADM1, Aluminum Design Manual, Aluminum Association, Arlington, VA, 2010.

2. ASTM A653, Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc- Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process, American Society for Testing and Materials.

3. ASTM A792, Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy- Coated by the Hot-Dip Process, American Society for Testing and Materials.

4. ASTM E1514, Standard Specification for Structural Standing Seam Steel Roof Panel Systems, American Society for Testing and Materials, West Conshohocken.

5. ASTM E1592, Standard Test Method for Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference, American Society for Testing and Materials.

6. ASTM E1646, Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure Difference, American Society for Testing and Materials.

7. ASTM E1680, Standard Test Method for Rate of Air Leakage through Exterior Metal Roof Panel Systems, American Society for Testing and Materials.

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 2 of 7 Preformed Metal Roof Panels

8. UL 580, Tests for Uplift Resistance of Roof Assemblies, Underwriters Laboratories, Inc., Northbrook, IL, 2006, with Revisions through July, 2009.

B. Manufacturer’s qualifications

1. Manufacturer shall have a minimum of three years’ experience in manufacturing metal roofing systems. Panels specified in this section shall be produced in a permanent factory environment with fixed-base roll- forming equipment. A letter from the manufacturer certifying the manufacturer’s qualifications shall accompany the product material submittals.

1.03 SYSTEM PERFORMANCE REQUIREMENTS

A. Performance Testing

1. Metal roofing systems shall be tested in accordance with UL580, Class 90 rating.

2. Metal roof panel systems shall be tested in accordance with ASTM E1592 for negative loading. Capacity for gauge, span or loading other than those tested is permitted to be determined by interpolating between test values only.

3. Metal roof panel systems shall have no water leakage at a pressure differential of 6.24 psf when tested in accordance with ASTM E1646.

4. The panels and concealed anchor clips shall be capable of supporting a 300-pound temporary concentrated load at the panel mid-span in the installed condition. The load shall be applied over the entire panel width. The panels shall support this concentrated load without displaying permanent distortions that would affect the weathertightness.

1.04 DESIGN REQUIREMENTS

A. General

1. The roof shall be designed by the manufacturer as a complete system.

Members and connections not indicated on the drawings shall be the responsibility of the Contractor. All components of the system shall be supplied or specified by the same manufacturer.

B. Design Loads

1. Design load application shall be in accordance with 2014 OSSC.

2. Dead Loads

a. The dead load shall be the weight of all permanent materials, down to the existing trusses. Collateral Loads shall be as shown on the contract drawings. Collateral Loads shall not be applied to the roof panels.

Collateral Loads consist of Sprinklers, Mechanical and Electrical Systems, and Ceilings, and shall not be attached to the roof panels.

3. Live and others loads: See General Notes on the drawings.

a. The panels and concealed anchor clips shall be capable of supporting a minimum uniform live load of 20 psf.

C. Roof Panels

1. Steel panels shall be designed in accordance with the AISI S100.

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 3 of 7 Preformed Metal Roof Panels

2. Deflection requirements shall be in accordance with the applicable building code, or as a minimum, L/180 for roof snow load (but not less than 20 psf).

D. Accessories and Their Fasteners

1. Accessories and their fasteners shall be capable of resisting the specified design wind uplift forces and shall allow for thermal movement of the roof panel system. Exposed fasteners shall not restrict free movement of the roof panel system resulting from thermal forces, except at designed points of roof panel fixity.

1.05 SUBMITTALS

A. Installation Drawings

1. Submit completed design calculations, installation drawings, and installation details by the manufacturer, to the C.O. for review.

2. Installation drawings shall show methods of installation, elevations and plans of roof and wall panels, sections and details, specified loads, flashings, roof curbs, vents, sealants, interfaces with all materials not supplied by the metal roofing system manufacturer, and proposed identification of component parts and their finishes.

B. Calculations

1. All calculations noted below shall be reviewed and sealed by a Licensed

Professional Engineer.

2. Submit engineering calculations defining cladding loads for all roof areas based on specified building codes, allowable clip loads, and required number of fasteners to secure the panel clips to the designated substructure.

3. Compute uplift loads on clip fasteners with full recognition of prying forces and eccentric clip loading.

4. Calculate the lateral force loads, in accordance with the OSSC, and design connections to transmit the loads to the trusses in both directions.

5. Calculate holding strength of fasteners in accordance with submitted test data provided by Fastener Manufacturer based on length of embedment and properties of materials.

6. Submit drainage calculations for valley, gutter, and downspout design.

C. Physical Samples

1. Submit samples and color chips for all proposed finishes.

a. Submit one 12-inch long sample of panel, including clips.

b. Submit two 3-inch x 5-inch color chip samples in color selected by the architect (owner).

D. Test Reports

1. Submit test report showing that metal panels have been tested in accordance with ASTM E1592.

a. Submit test report showing that metal panels meet the water penetration requirements of ASTM E1646.

b. Submit test report showing that metal panels meet the air infiltration requirements of ASTM E1680.

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 4 of 7 Preformed Metal Roof Panels

E. Installation contractor’s qualifications

1. Submit a letter from the manufacturer identifying the installer of the metal roofing system as an authorized installer, approved by the manufacturer prior to the start of the installation of the metal roofing system.

1.06 PRODUCT DELIVERY, STORAGE AND HANDLING

A. Delivery

1. Deliver metal roofing system to job site properly packaged to provide protection against transportation damage.

B. Handling

1. Exercise care in unloading, storing and installing metal roofing system to prevent bending, warping, twisting and surface damage.

C. Storage

1. Store all material and accessories above ground on well supported platforms.

Store under waterproof covering. Provide proper ventilation of metal roofing system to prevent condensation build-up between each panel or trim/flashing component.

1.07 WARRANTY

A. The manufacturer shall warrant the roof installation for a minimum of 25 years from the date of final acceptance.

PART 2 – PRODUCTS;

2.01 MATERIALS

A. Metal roof panel

1. Seam Type: Interlocking / Snap Connection

2. Minimum Thickness: Panel to meet all specified design loads, but not less than

26 Gauge.

3. Panel Base Material

a. Galvanized steel sheet, G90, conforming to ASTM A653

4. Texture:

a. Smooth.

5. Finish

a. Selected by the C.O. from manufacturer’s standard offering.

B. Concealed Anchor Clips

1. Concealed anchor clips shall be the same as those used during the testing of the roof system. Clip bases shall have factory punched or drilled holes for attachment. Clips shall be made from multiple pieces with the allowance for the total thermal movement required within the clip. Fixed clips are permitted when the manufacturer can substantiate that the system can accommodate the thermal cyclic movement under sustained live or snow loads.

2.02 MISCELLANEOUS MATERIALS

A. Fasteners

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 5 of 7 Preformed Metal Roof Panels

1. Fasteners for steel roof panels shall be zinc-coated steel, aluminum, corrosion resisting steel, or nylon-capped steel, type and size specified below, or as otherwise, approved for the applicable requirements.

2. Fasteners for aluminum roof panels shall be aluminum or corrosion resisting steel.

3. Fasteners for structural connections shall provide both tensile and shear ultimate strengths of not less than 750 pounds per fastener.

4. Fasteners for accessories shall be the manufacturer’s standard.

5. Exposed roof fasteners:

a. Sealed or have sealed washers on the exterior side of the covering to waterproof the fastener penetration.

b. Painted the same color as the roof sheets.

c. Washer material shall be compatible with the screw head; have a minimum diameter of 3/8-inch for structural connections; and gasket portion of fasteners or washers shall be neoprene or other equally durable elastomeric material.

B. Components

1. Components shall be compatible with the roof panel furnished. Flashing, trim, metal closure strips, caps, gutters, downspouts, roof curbs, and similar metal components shall not be less than the minimum thickness specified by the Manufacturer.

2. Exposed metal components shall be finished to match the panels or trim, as furnished.

3. Molded closure strips shall be closed-cell or solid-cell synthetic rubber or neoprene, or polyvinyl chloride pre-molded to match configuration of the covering and shall not absorb or retain water.

4. Thermal spacer blocks and other thermal barriers at concealed clip fasteners shall be as recommended by the Manufacturer.

C. Sealants

1. All tape sealant shall be a pressure sensitive, 100 percent solid, sealing tape with a release paper backing. Provide permanently elastic, non-sagging, non-toxic, non- staining tape sealant approved by the Manufacturer.

2. The Manufacturer shall approve all joint sealant that will come into contact with the metal roof.

2.03 FABRICATION

A. Panels shall be produced by a Manufacturer meeting the requirements of section

1.02B.

B. Fabricate trim, flashing and accessories to Manufacturer’s specified profiles.

2.04 PREFABRICATED CURBS AND EQUIPMENT SUPPORTS

A. General: Provide the Manufacturer with the dimensions, weights and model number of the units to be supported by the curb(s).

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 6 of 7 Preformed Metal Roof Panels

B. Fabricate curbs of hot-dipped galvanized sheet. Curbs shall have welded joints unless a two-piece curb is required. Provide integral base plates and water diverters/crickets. Front base plate shall be extended up-slope from the beginning of the water diverter. Curbs shall be designed for a compatible installation with the panel system.

C. Curbs shall be constructed to match the roof slope and provide a mounting surface as required by the rooftop unit manufacturer.

D. Submit roof curb manufacturer’s shop drawings to Manufacturer for approval before fabrication of curbs.

E. Any curb structural support system shall allow thermal movement of the curb with the roofing system.

2.05 PREFABRICATED PIPE FLASHINGS

A. Pipe flashings shall provide a weathertight joint at projections through the roof, taking into account the thermal movement of the roof and the service temperature of the projection. Pipe flashings shall have an aluminum-flanged base ring.

PART 3 – EXECUTION

3.01 SURFACE CONDITIONS

A. Examination

1. The Contractor shall verify installed work of other trades that such work is complete to a point where the roofing system installation may commence.

2. Verify that the substructure installation is in accordance with the approved shop drawings and Manufacturer’s requirements. This specifically includes verifying that secondary structural members and/or decking are installed to meet performance requirements. Coordinate with Manufacturer to ensure that the substructure is installed to accommodate the appropriate clip spacing.

B. Discrepancies

1. In event of discrepancy, notify the architect (owner).

2. Do not proceed with installation until discrepancies have been resolved.

3.02 INSTALLATION

A. Install the roofing in accordance with manufacturer’s instructions and approved installation drawings.

B. Install the roofing so that it is weathertight and allows for thermal movements.

C. Locate and space all exposed fasteners in accordance with the Manufacturer’s recommendations. Use torque settings to obtain controlled uniform compression for a positive seal without rupturing the neoprene washer.

D. Avoid placing pipe penetrations through the panel seams.

E. Do not allow panels or trim to come into contact with dissimilar materials (i.e.

copper, lead, graphite, treated lumber, mortar, etc.). Water run-off from these materials is also prohibited.

F. Comply with Manufacturer’s approved installation drawings, instructions and recommendations for installation of roof curbs. Refer to Manufacturer’s standard

Rev. Date 01/2019 Modular Building Roof Replacement 07 41 13 - Page 7 of 7 Preformed Metal Roof Panels installation details. Anchor curbs securely in place with provisions for thermal and structural movement.

3.03 CLEANING, PROTECTION

A. Dispose of excess roofing materials and remove debris from site.

B. Clean work in accordance with manufacturer’s recommendations.

C. Protect work against damage until final acceptance. Replace or repair to the satisfaction of the architect (owner), any work that becomes damaged prior to final acceptance.

D. Touch up minor scratches and abrasions per the Manufacturer’s recommendations.

Jan. 2019 Modular Building Roof Replacement 08 70 00 - Page 1 of 1 Hardware

SECTION 07 62 00

SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.01 SUMMARY

A. This section specifies flashing and sheet metal work, and required accessories.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Flashing:

1. 26 gauge galvanized steel, ASTM A361, ASTM G90, Type I, Class D .

B. Roof Drains, Gutters, and Downspouts.

1. 26 gauge galvanized steel, ASTM B361, ASTM G90, Type I, Class D.

C. Gutter Spikes.

1. ASTM F1667.

D. Plastic Cement.

1. ASTM C920, Type S.

2.02 FABRICATION

A. Shop fabricates items where possible. Accurately reproduce profiles.

PART 3 - EXECUTION

3.01 CONSTRUCTION

A. Metal Roof Edging.

1. Bend and solder all corners. Lap soldered joints a minimum of 1 inch and fasten with rivets or sheet metal screws before bedding in plastic cement.

B. Gutters.

1. Attach with spikes and ferrules or screws and hangers as approve by manufacturer.

C. Downspouts.

1. Fasten at top and bottom and every 10 feet for buildings greater than one story.

Terminate leaders with a turnout from building to connect to drains or splash blocks.

PART 1 - GENERAL
SECTION 01 29 77 GENERAL REQUIREMENTS
PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED)
PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)
PART 1 - GENERAL
SECTION 02 41 13 SELECTIVE DEMOLITION
PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION
SECTION 06 10 00
ROUGH CARPENTRY
PART 1 GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
SECTION 07 41 13 PREFORMED METAL ROOF
PART 2 – PRODUCTS;
PART 3 – EXECUTION
SECTION 07 62 00
PART 2 - PRODUCTS
PART 3 - EXECUTION