RoofPlans.pdf
PDF 1 MB Posted
- Attached to
- Modular Building Roofing Repair Federal contract opportunity
- Solicitation number
- 1282A720Q0042
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1282A720Q0042.pdf | ||
| Specifications.pdf | ||
| WDOL-Lincoln Co., OR.pdf | ||
| Sol_1282A720Q0042.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN OREGON
INDEX MAP
LOCATION T14S R12W SEC12
FOREST SERVICE - REGION SIX
ANGELL JOB CORPS CENTER
PROJECT
SITE
PORTLAND
THE
DALLES
MEDFORD
GRANTS
PASS
COOS
BAY
ROSEBURG
BEND
SALEM
CORVALLIS
EUGENE
ASTORIA
TILLAMOOK
NEWPORT
p5 p5 p5 o o o o o o
DETROIT
FLORENCE
REEDSPORT
DRAWINGS FOR
MODULAR BUILDING
ROOF REPAIR
VICINITY MAP (NOT TO SCALE)
INTENDED PRINT SIZE 11" X 17"
U S
TURNOFF TO TILLICUM PARK(WEST)
AND ANGELL JCCC(EAST)
DARREN LEMON
FOREST ENGINEER
JOHN BOOKER
CENTER DIRECTOR
APPROVED
REVIEWED BY
Date
Date
DESIGNED BY
W
A L P
O
R
T
M
I L E
S
Y A
C
H
A T
S
M
I L E
S
SHEET DRAWING TITLE
1 G1 TITLE SHEET
2 G2
GENERAL NOTES AND
ABBREVIATIONS
3 G3 GRAPHIC SYMBOLS AND PATTERNS
S1 ROOF REPLACEMENT
DEMOLITION
S2 ROOF REPLACEMENT
PLAN AND SECTION
S3 ROOF REPLACEMENT
TRUSS REPAIR
"MODULAR" BUILDING
PROJECT SITE
ADMINISTRATION BUILDING
CONTRACTOR CAN USE RESTROOM IN
THIS BUILDING DURING WORK HOURS.
MICHAEL D. MORNEAULT
CIVIL ENGINEER
Date
JEFF CASWELL, P.E.
CIVIL ENGINEER
Date
MARK SODARO, S.E.
STRUCTURAL ENGINEER
Date
. GENERAL NOTES
1. AS-BUILT PLANS FOR THE EXISTING BUILDING COULD NOT BE FOUND. MANY DETAILS OF IT WERE SURMISED FROM FIELD
OBSERVATION AND ORIGINAL DESIGN (NOT AS-BUILTS) DRAWINGS.
2. DESIGN LOADS
3. ALL CONSTRUCTION MATERIAL SHALL MEET THE PERFORMANCE STANDARD OF AND MATCH EXISTING MATERIALS.
4. REPORT ANY ERRORS, AMBIGUITIES AND/OR OMISSIONS IN THE DRAWINGS OR SPECIFICATIONS TO THE C.O. IMMEDIATELY IN
WRITING. NO WORK IS TO BE STARTED BEFORE FINAL DETERMINATION IS MADE.
5. PROVIDE TEMPORARY SHORING, BRACING, & OTHER TEMPORARY STRUCTURES AS REQUIRED UNTIL ALL PERMANENT CONNECTIONS
AND STIFFENERS HAVE BEEN INSTALLED AND APPROVED.
6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED
BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, USE SIMILAR DETAILS OF CONSTRUCTION, SUBJECT REVIEW AND APPROVAL
BY THE C.O.
7. DO NOT CARRY OUT VARIATIONS OR MODIFICATIONS TO WORK SHOWN ON THESE DRAWINGS OUT WITHOUT THE WRITTEN
APPROVAL FROM THE CO.
8. COORDINATE THE WORK OF ALL TRADES REQUIRED TO PERFORM THE WORK, AND BE RESPONSIBLE FOR THE JOINING OF HIS WORK
TO THE WORK OF OTHER TRADES.
9. NO PORTION OF THE WORK REQUIRING A SUBMITTAL APPROVAL SHALL BE COMMENCED UNTIL THE SUBMITTAL HAS BEEN APPROVED
BY THE CO. ALL SUCH PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SUBMITTAL MATERIALS.
10. KEEP AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS CAUSED BY DEMOLITION AND STORE CONSTRUCTION MATERIALS, SALVAGED ITEMS, AND EQUIPMENT IN AREAS DESIGNATED BY THE C.O.
11. HANDLE ALL MATERIAL STORED ON-SITE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND PROTECTED FROM
WEATHER TO PREVENT DAMAGE AND DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CAUSE FOR REJECTION
OF WORK.
12. ALL REFERENCES TO COMMERCIAL PRODUCTS BY MANUFACTURER ARE TO SET A STANDARD. SUBMIT ALL PRODUCTS FOR REVIEW
AND APPROVAL BEFORE USE.
13. PROTECT ALL GOVERNMENT IN THE BUILDING FROM WET WEATHER.
14. ANY NECESSARY RELOCATION OF STORED GOVERNMENT MATERIALS IN THE BUILDING IS THE RESPONSIBILITY OF THE
CONTRACTOR. RETURN MATERIALS TO THEIR ORIGINAL LOCATIONS OR AS DIRECTED BY THE CO. OUTSIDE STORAGE ARES WILL BE
PROVIDED BY THE GOVERNMENT, IF NEEDED. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE MATERIALS FROM WET
WEATHER. THE STORAGE AREA WILL BE WITHIN THE CAMPUS.
15. ENCIRCLE THE CONSTRUCTION SITE WITH A TEMPORARY ORANGE PLASTIC CONSTRUCTION FENCE. DO NOT DAMAGE THE EXISTING
ASPHALT PAVEMENT DURING ERECTION. GENERALLY THE PUBLIC WILL NOT IN THE IMMEDIATE AREA. THE STUDENTS AND STAFF OF
THE CENTER ARE AWARE OF OSHA REGULATIONS.
LOAD DESCRIPTION VALUE REFERENCE
ROOF LIVE 10 PSF MINIMUM
FLOOR LIVE 100 PSF
ASCE, TABLE C4-1
ULTIMATE WIND SPEED 135 MPH
FIGURE 1609A, OSSC
BASIC WIND SPEED 105 MPH CBO AND OSSC TABLE 1609.3.1
EXPOSURE B OSSC 1609.4.3
SNOW 0 CBO
RAINFALL 1 INCH/HR CBO
SEISMIC
RISK CATEGORY II
SITE CLASS D
OSSC 1613
© AT
CL CENTERLINE
NUMBER, POUND
A.B.
ANCHOR BOLT
ACT ACOUST. CLG TILE
ADD
ADDITIONAL, ADDITIVE
ADJ ADJACENT
AF ABOVE FLOOR
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALIGN
ALIGN (N) WITH (E)
ALT ALTERNATE
ANOD ANODIZED
BLDG BUILDING
BLKG BLOCKING
BOD BASIS OF DESIGN
BOT BOTTOM
BTW BETWEEN
BUR BUILT UP ROOFING
CAB CABINETRY
CBO
COUNTY (OR CITY) BUILDING
OFFICAL
CFB CEMENTITIOUS FIBER BOARD
CLR CLEAR
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO, C.O.
CONTRACTING OFFICER
CONC. CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
D DRYER
DIA, Ø
DIAMETER
DIM,
DIMS
DIMENSION, DIMENSIONS
DS DOWNSPOUT
DWG,
DWGS
DRAWING, DRAWINGS
EA EACH
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
(E), EXIST
EXISTING
EXT EXTERIOR
F FLUSH
FLASH FLASHING
FE FIRE EXTINGUISHER
FF FINISH FLOOR
FG FULL GLASS
FIN FINISHED
FOR FACE OF FINISH
FOIC
FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FOIO
FURNISHED BY OWNER,
INSTALLED BY OWNER
FOS FACE OF STUD
GA GAUGE
GEN GENERAL
GFI GROUND FAULT INTERRUPTER
GL GLASS
GWB GYPSUM WALLBOARD
HARDW HARDWOOD
HC HANDICAPPED
HM HOLLOW METAL
HT HEIGHT
HW HOT WATER HEATER
IBC
INTERNATIONAL BUILDING
CODE
ID INSIDE DIMENSION
IFC INTERNATIONAL FIRE CODE
INSUL INSULATION
INT INTERIOR
KIT KITCHEN
LAM LAMINATED
M MATERIAL
MTL METAL
MFR MANUFACTURER
MIN MINIMUM
MAX MAXIMUM
(N), N
NEW
NIC NOT INCLUDED IN CONTRACT
NO NUMBER
O.C., O/C
ON CENTER(S)
OSSC
OREGON STATE STRUCTURAL
CODE
OPP
HAND
OPPOSITE HAND
P PAINT
PL TOP PLATE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PT PRESSURE TREATED
R RADIUS
RCP REFLECTED CEILING PLAN
REF REFRIGERATOR
RB RUBBER BASE
REQD REQUIRED
RD ROUGH OPENING
RMKS REMARKS
RWL RAIN WATER LEADER
SAM SELF-ADHESIVE MEMBRANE
SC SOLID CORE WOOD DOOR
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SOW SCOPE OF WORK
SPEC SPECIFICATIONS
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STN STAIN
STRUCT STRUCTURAL
SV SHEET VINYL
TBD TO BE DETERMINED
TERM. TERMINATION
TG TEMPERED GLASS
TME TO MATCH EXISTING
TOP TOP OF
TOS TOP OF SLAB
TOW TOP OF WALL
TYP TYPICAL
UON UNLESS OTHERIMSE NOTED
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
W WASHER
WC WOOD COMPOSITE
ARREVIATIONS
D e s c r i p t i o n
D a t e
A p p r
M a r k
DRAWING
OF
D E
S I G
N E
D
B
Y
C A
D
D
W G
F
I L E
P R
O J E
T
N
O
I S
S U
E
I N
F O
R M
A T
I O
N
C H
E C
K E
D
B
Y
D R
A W
N
B
P
P R
O V
E D
B
SHEET
A P
P R
O V
E R
C H
E C
K E
R
M D
M
M D
M
M O
D U
LA
R
B U
IL
D
IN
G
R O
O F
R
EP
LA
C
EM
EN
T
G E
N E
R A
L
N
O T
E S
A
B R
E V
I A
T I O
N S
P R
O J E
I L
E
N
U M
B E
R
NOTE: NOT ALL ABBREVIATIONS ARE USED ON THIS PROJECT.
TYPE NUMBER AS APPLIES
OBJECT TYPE
ROOM NAME AND NUMBER
DOOR NUMBER - REFERENCES
TO ROOM NUMBER
REVISION DELTA NUMBER
EXISTING OBJECT
PROPERTY LINE
CENTER LINE
WINDOW TYPE
SIDEWALK PATTERN
GRAVEL PARKING
NEW FRAMED WALL
STONE TILE
WALK-OFF MAT
HATCH PATTERNS
GYPSUM WALL BOARD
WOOD SHAKES
EXTERIOR
VERTICAL SIDING
STONE VENEER
CONCRETE
MASONRY UNITS
CONCRETE
EARTH FILL
WASHED ROCK
WOOD SHINGLES
INTERIOR
ELEVATION
TAG
EXTERIOR
ELEVATION
TAG
A6.00
+1'-0"
SPOT
ELEVATION
TAG
ELEVATION
LEVEL TAG
Elevation
Name
GRIDLINE
DETAIL
AREA
TAG
DETAIL
TAG
WALL
SECTION
BUILDING
SECTION
WINDOW TAG
GRAPHIC SYMBOLS
NORTH
ARROW
REVISION
TAG
DOOR TAG
ROOM TAG
Room name
WALL, FLOOR,
ROOF- TYPE
TAG
DETAIL #
SHEET I.D.
DETAIL #
SHEET I.D.
REFERENCE I.D.
SHEET NUMBER
SHEET NUMBER
REFERENCE I.D.
SHEET NUMBER
REFERENCE I.D.
SHEET NUMBER
A
1.00
A4.00
LEVEL NAME
ELEVATION HEIGHT VALVE
ELEVATION HEIGHT ABOVE
REFERENCE LEVEL
ELEVATION REFERENCE
ON SHEET
SHEET NUMBER
ELEVATION REFERENCE
ON SHEET
SHEET NUMBER
D e s c r i p t i o n
D a t e
A p p r
M a r k
DRAWING
OF
D E
S I G
N E
D
B
D
D
L E
P R
O J E
I S
S U
E
I N
F O
R M
A T
I O
N
C H
E C
K E
D
B
Y
D R
A W
N
B
P R
O V
SHEET
A P
P R
O V
E R
C H
E C
K E
R
M D
M
M D
M
M O
D U
LA
R
B U
IL
D
IN
G
R O
O F
R
EP
LA
C
EM
EN
T
G R
AP
H
S
M
B O
L
H
T
T
TE
R
N S
P R
O J E
I L
E
N
U M
B E
R
NOTE: NOT ALL GRAPHIC SYMBOLS AND HATCH PATTERNS ARE USED ON THIS PROJECT.
PHOTO NUMBER
SHEET NUMBER
PH
PHOTO
VIEW
M
O
L
I
X
I
S
T
I
U
I
L
T
U
O
A
V
V
E
R
I
N
G
A
Y
W
O
E
A
T
H
I
O
U
S
S
E
X
I S
T
I
P
H
A
O
F
N
N
T
R
A
C
T
E
X
I S
T
I
M
T
O
F
N
N
T
R
A
C
T
EXISTING GUTTERS AND
DOWNSPOUTS TO REMAIN
DEMOLISH EXISTING SCUPPERS, DOWNSPOUTS,AND
PERIMETER EDGING DOWN TO TOP CHORD AND BLOCKING
DEMOLISH METAL PANS AND ABS PIPE
REMOVE UNUSED MASTHEAD
CUT ANY WIRES BELOW TOP OF
TRUSS
EXISTING MASTHEAD
36" DEEP TRUSS@24" O/C
100'
END DEMOLITION
EXISTING
METAL ROOF
20'-2"
120'-2"
S7
S7
PH
S9
PH
S9
DEMOLISH SCUPPERS
AND DOWNSPOUTS (6)
AND
DROP PANS LOCATED IN THE
MIDDLE OF THE ROOF
TRUSS (E)
2X6@16" O.C.
EXACT
CONFIGURATION IS
UNKNOWN
DEMOLISH/REMOVE
PERIMETER EDGING
(2 X 4 & RIPPED 4 X 4)
FLASHING
EXACT
CONFIGURATION
IS UNKOWN
D e s c r i p t i o n
D a t e
A p p r
M a r k
DRAWING
OF
D E
S I G
N E
D
B
D
D
L E
P R
O J E
I S
S U
E
I N
F O
R M
A T
I O
N
C H
E C
K E
D
B
Y
D R
A W
N
B
P R
O V
SHEET
4 6
M D
M
M D
M
M O
D U
L A
R
B
U I L
D I N
G
R
O O
F R
EP
LA
C M
EN
T
R O
P
L A
C E
M E
M
O L
I T
I O
N
SHEET NOTES:
1. DISPOSE OF ALL DEMOLISHED MATERIALS OFF NATIONAL FOREST LAND AND IN
THE LAWFUL MANNER.
2. SEE PHOTOS ON SHEET S9 TO VIEW EXISTING CONDITION OF ROOF.
SCALE: NONE
SECTION
SCALE: NONE
EXISTING EAVE
SCALE: NONE
EXISTING SCUPPER
SCALE: NONE
PLAN - ROOF DEMOLITION
S7
S7
S1
EAST
NEW
RIPPER MEMBER - 2X CUT AT A
-2% SLOPE TO THE WEST
NEW
LATERAL SUPPORT
2 X BLOCKING (TYP)
NEW
METAL ROOF OVER NEW
PLYWOOD DIAPHRAGM
(ENTIRE ROOF)
EXISTING TOP PLATES
AND TRUSS BLOCKING
NEW FLASHING
EXTEND 8" BELOW TOP
PLATES
NEW
2 X 6 BLOCKING
WHERE SHOWN
EXISTING TRUSS TO REMAIN
EXISTING LUMBER TRUSS(ES)
USE EXISTING BLOCKING
NEW 2 X 6 BLOCKING@48" O.C.
BETWEEN TRUSSES
USE SIMPSON HU24TF JOIST HANGER EA.END
HEADER:4-10d NAILS
FLANGE: 4-10d NAILS
AT WALL
USE SIMPSON LU24 JOIST HANGER
ALIGN BLOCKING WITH EXISTING STUD
HEADER: 4-10d NAILS
JOIST: 2-10d NAILS.
REPLACE EXISTING
GUTTER AND DOWNSPOUTS
~8'-0" - ZONE 2ROOF SHEATHING ZONE 1~8'-0" ZONE 2
REMOVE EXISTING GUTTER
AND DOWNSPOUTS
S8
D e s c r i p t i o n
D a t e
A p p r
M a r k
DRAWING
OF
D E
S I G
N E
D
B
D
D
L E
P R
O J E
I S
S U
E
I N
F O
R M
A T
I O
N
C H
E C
K E
D
B
Y
D R
A W
N
B
P R
O V
SHEET
5 6
M D
M
M D
M
M O
D U
L A
R
B
U I L
D I N
G
R
O O
F R
EP
LA
C
EM
EN
T
R O
P
L A
C E
M E
N T
P L
A
D
S
E C
T I O
N
ROOF DIAPHRAGM NAILING SCHEDULE
ZONE NAIL SIZE BOUNDARY EDGE FIELD
10d 4"" 6" 12"
10d 6" 6" 6"
SHEET NOTES
1. ROOF
1.1. INSTALL 15# ASPHALT FELT OVER NEW PLYWOOD
1.2. FOLLOW MANUFACTURER'S INSTRUCTIONS FOR HORIZONTAL AND
VERTICAL OVERLAPS
2. GUTTERS AND DOWNSPOUTS
2.1. A SPECIFIC ARRANGEMENT IS NOT GIVEN
2.2. SUBMIT FOR APPROVAL AN ARRANGEMENT OF DOWNSPOUTS
MEETING THE REQUIREMENTs OF THE OREGON STATE PLUMBING
CODE. FOR 1 INCH PER HOUR STORM FLOW
2.3. MINIMUM FIVE INCH (BOTTOM WIDTH) GUTTERS.
2.4. STORMWATER WILL EXIT DOWNSPOUTS TO AN APPROVED
HARDENED SURFACE TO MINIMIZE EROSION.
DETAIL NOTES
1. BACKING FOR METAL ROOFING IS ALSO THE LATERAL FORCE
DIAPHRAGM.
2. SUBMIT FOR APPROVAL:
2.1. LAYOUT OF LATERAL SUPPORT
2.2. TYPE AND THICKNESS OF DIAPHRAGM
2.3. CONNECTIONS TO TRANSMIT LATERAL TO THE TRUSSES.
3. SEE G2 AND SPECIFICATION 07 41 13 FOR OTHER
REQUIREMENTS
SCALE: NONE
NEW ROOF PLAN
SCALE: NONE
ROOF SECTION
S2
3"
2 ROWS@6" SPACING=18"
3"
EXISTING TOP CHORD
2 X 6
SPLICE, 2 X 6
SPLICE LENGTH VARIES
AREA OF ROT
TO BE REMOVED
ADDITIONAL CLEANED OUT AREAS
10d NAILS
USED ON BOTH SIDES
OF TOP CHORD
TOP CHORD
VARIES
D e s c r i p t i o n
D a t e
A p p r
M a r k
DRAWING
OF
D E
S I G
N E
D
B
D
D
L E
P R
O J E
I S
S U
E
I N
F O
R M
A T
I O
N
C H
E C
K E
D
B
Y
D R
A W
N
B
P R
O V
SHEET
6 6
M D
M
M D
M
M O
D U
L A
R
B
U I L
D I N
G
R
O O
F R
EP
LA
C
EM
EN
T
R O
P
L A
C E
M E
U
P
A I R
S
0 1 Ft.1 Ft.
SCALE: 1-1/2" = 1'-0"
TOP CHORD REPAIR
(TYPICAL)
SHEET NOTES
1. REPAIR AREA(S) WILL BE MARKED BY THE C.O. AFTER ROOF DEMOLITION
IS COMPLETE AND SUFFICIENT FLOOR AREA HAS BEEN CLEARED BY THE
CONTRACT TO ALLOW THE GOVERNMENT'S MANLIFT AND/OR SCISSORS
LIFT TO REACH ALL THE ROOF AREA.
2. CUT OUT ROTTED AREA DOWN TO SOUND WOOD
3. CLEAN THE CUT AREA WITH A MILD CHLORINE SOLUTION (BLEACH).
4. USE THE SAME LUMBER GRADE FOR THE SPLICES AS THE TOP CHORD.
5. MAKE REPAIRS WHEN THE LEAST LOAD IS ONE THE TRUSS.
6. NAILING PATTERN IS FOR BOTH SIDES OF THE TOP CHORD.
SCALE: NONE
PH 1
FACING APPROX. WEST
SCALE: NONE
PH 2
FACING APPROX. NORTHWEST
S3
File details come from the government source that posted it. Updated .