This document contains answers to questions regarding a federal contract solicitation to construct a swine walkway. The solicitation requires the installation of a 60,000 BTU unit heater as shown on project drawings. Fresh air dampers are required per specification but motorized dampers are not specified. Return air ducts must include filters but no additional specifications are provided. Air and water balancing is not a requirement. The site visit will be on May 6, 2021 at 10:33 central time at the address provided, where attendees will sign in and be escorted to the project location while wearing plastic foot covers. Direct contact with swine should be avoided in the previous days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Solicitation 12805B21R0008-0003.pdf | ||
| Amendment 0002.pdf | ||
| Attachment 3 Clay Center Swine Walkway Drawings Rev 1.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 3 Clay Center Swine Walkway Drawings.pdf | ||
| Attachment 5 ARS-372 Contractors Request For Payment Transmittal.pdf | ||
| Attachment 1 Wage Determination NE20210080.pdf | ||
| Attachment 2 Swine Walkway Total Specification SOW.pdf | ||
| Solicitation 12805B21R0008.pdf | ||
| Attachment 4 ARS-371 Construction Progress and Payment Schedule.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1 - Amendment 0002
1. Are we to supply unit heaters. There is no spec.? Unit heaters are shown on the drawings, required per division I, and required to be wired per division 16. The price doesn’t appear to be much different among the Btu ratings, but a 60,000 Btu unit for the LB White gas line of heaters would be acceptable. If contractor wants to install another brand which would require a flue exhaust, that would be up to them.
2. Are we to have a motor damper on fresh air? See division 1580 and drawing detail. No
3. Is the return air just a duct in side with filter? That is what would be expected to be shown on submittals. Nothing additional was required.
4. Will we need certified air & water balance? That is not required in the specification.