Q n A 6_24_21.docx

DOCX document 16 KB Posted

Attached to
Fowlers Campground Tree Removal Federal contract opportunity
Solicitation number
127EAY21Q0061
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Fowlers Campground Tree Removal, newest first.
File Type Posted
Wage Determination.pdf PDF
Resource Protection Measures.docx DOCX document
Map.pdf PDF
Inventory of Trees.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Document 06/23/2021 Version 1

Fowlers Campground Tree Removal (127EAY21Q00061)

Q1: Is the timber to be hauled off as saw logs by the contractor or is the wood staying on the ground once felled.

A1:All timber (whether saw logs or non-merchantable) will be hauled off by contract. Specified landings will be determined before contract begins. Specified landings will be approximately 2-3 miles away from contract site.

Q2: What is to be done with the slash? Piled or chipped or lop and scatter?

A1: Remove all slash (greater than 1” diameter) that is generated from felling operations. Move slash and pile at specified locations (same as above – slash locations will be approximately 2-3 miles away) from contract site.

File details come from the government source that posted it. Updated .