127EAX21R0014 7.20.2021.pdf

PDF 5 MB Posted

Attached to
Santa Fe Road Maintenance Federal contract opportunity
Solicitation number
127EAX21R0014
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

View the file

Other files for this federal contract opportunity

Other files attached to Santa Fe Road Maintenance, newest first.
File Type Posted
Schedule of Items.pdf PDF
Specifications.pdf PDF
FY21 Road Maintenance Contract Drawings and Maps.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1034871

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

7EAX

DAVID WATSON 602-225-5350

107/20/2021

127EAX21R0014

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Statement of Work

Specifications

Schedule of Items

FY21 Road Maintenance Drawings and Maps

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 120 calendar days and complete it within ________________ ________________ calendar days after receiving

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ _______ _____ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

7EAX

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

127EAX21R0014

Delivery: 06/01/2021

Delivery Location Code: 8379

USDA FOREST SERVICE

SANTA FE INTERAGENCY FIRE CTR

11 FOREST LANE

SANTA FE NM 87508 US

Period of Performance: 08/16/2021 to 12/15/2021

0001 Road Maintenance

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Pay Item Schedule of

Supplies/Services Method of

Measurement Estimated Quantity Unit Unit Price Total Amount

15101 Mobilization LS 1 LS

30301 Roadway Reconditioning AQ 68.3 MI 30302 Ditch Reconditioning AQ 17.1 MI

30303 Cattle Guard Maintenance AQ 5 EA

15101-01 Mobilization LS 1 LS 30301-01 Roadway Reconditioning AQ 24.9 MI 30302-01 Ditch Reconditioning AQ 6.2 MI

30303-01 Cattle Guard Maintenance AQ 1 EA

15101-02 Mobilization LS 1 LS

30301-02 Roadway Reconditioning AQ 26.9 MI 30302-02 Ditch Reconditioning AQ 6.7 MI

30303-02 Cattle Guard Maintenance AQ 1 EA

15101-03 Mobilization LS 1 LS

30301-03 Roadway Reconditioning AQ 25.5 MI 30302-03 Ditch Reconditioning AQ 6.4 MI

30303-03 Cattle Guard Maintenance AQ 1 EA

15101-04 Mobilization LS 1 LS

30301-04 Roadway Reconditioning AQ 14.6 MI 30302-04 Ditch Reconditioning AQ 3.7 MI

30303-04 Cattle Guard Maintenance AQ 1 EA

15101-05 Mobilization LS 1 LS

30301-05 Roadway Reconditioning AQ 16.2 MI 30302-05 Ditch Reconditioning AQ 4.1 MI

30303-05 Cattle Guard Maintenance AQ 1 EA

***QUOTE MUST INCLUDE ALL APPLICABLE TAXES*** TOTAL

Option #2 - Cuba RD

Schedule of Items

Base Contract

Base Contract Total:

Option #1 - Coyote RD

Option #1 Total:

Option #5 Total:

Option #2 Total:

Option #3 - Espanola RD

Option #3 Total:

Option #4 - Jemez RD

Option #4 Total:

Option #5 - Pecos/Las Vegas RD

STATEMENT OF WORK

FY 2021

Road Maintenance Contract

SANTA FE NATIONAL FOREST

Table of Contents

Scope of Work

Period of Performance

Project Location

Description of Work

Roadway Reconditioning

Ditch Reconditioning

Cattleguard Maintenance

Specifications

SCOPE OF WORK

The Santa Fe National Forest shall have road reconditioning and maintenance accomplished during Fiscal Year 2021. The Contractor for this work shall furnish all materials, supplies, equipment, transportation, labor, quality control and supervision necessary to complete the following tasks as detailed in the Description of Work, Drawings, Project Locations, Specifications, and Schedule of Items:

1. Roadway Reconditioning,

2. Ditch Reconditioning, and

3. Cattleguard Maintenance.

This contract consists of a base contract with option items. The base contract includes the above listed tasks on 68.3 miles of National Forest System Roads (NFSRs). There are five (5) contract option items specific to each of the five (5) Districts on the Santa Fe NF. Contract options will be added, subject to availability of funds, through September 30, 2021. The following video may be viewed to enhance the Contractor’s knowledge of Forest Service roads, specifications, and expectations for this contract:

https://www.youtube.com/watch?v=nTEfXsDqdUg.

A notice of seven (7) days prior to work being started and a pre-work meeting are required. Contractor shall have a Traffic Control Plan submitted to the CO for approval a minimum of fourteen (14) days prior to commencing operations. A Traffic Control Plan shall be approved prior to beginning any work, see Specifications for more details. A contract schedule shall be provided at the pre-work meeting and updated monthly or as required by the CO.

Work is generally confined to the clearing limits of the road as defined in the Specifications and Drawings. If a need arises for any work outside of the clearing limits;

the Contractor shall gain approval from the CO prior to beginning work.

Mobilization shall be paid once for cost to mobilize equipment to the Santa Fe NF.

Costs incurred while performing the work or traveling between locations on the Santa Fe NF will not be paid. If a road has not been accepted by the CO prior to Contractor moving equipment to another road; the Contractor will incur any cost associated with returning equipment to road for additional items that may be required for acceptance.

Contractor is responsible for utility locates. Damages to any utilities shall be the responsibility of the Contractor. Locates are available by calling 811.

The Contractor shall provide daily miles accomplished in the following format:

https://www.youtube.com/watch?v=nTEfXsDqdUg

Date District NFSR BMP EMP Additional Details

*BMP/EMP – Beginning Mile Post / Ending Mile Post, based on vehicle odometer if not signed. A weekly email of accomplished miles is required unless conditions warrant more immediate communication. Quantity to be paid for is the quantity designated in the Schedule of Items and will be based on actual miles reconditioned and inspected in the field.

The additional details column should include intersection related to BMP, any issues that may have arisen, notes on culverts that were found to be plugged or had greater than 50% obstruction, etc.

PERIOD OF PERFORMANCE

The Contractor shall complete all work in the base contract within one-hundred twenty

(120) calendar days from receipt of the Notice-to-Proceed (NTP) from the Contracting Officer (CO). The Contractor shall complete awarded option items within ninety (90) days from receipt of the NTP for the option item from the CO. A prework meeting is required for each award.

The Contractor should receive CO approval of work schedule at least seven (7) days prior to starting work. Contractor shall notify CO seven (7) days in advance of beginning any items that require staking or field identification. Contractor shall notify CO seven (7) days in advance of request for final inspection.

PROJECT LOCATIONS

The road reconditioning and maintenance is located on the Santa Fe NF in New Mexico. Forest Service roads are predominately native or aggregate surfaced and can be in remote locations. Roads are listed in the attached Drawings and highlighted in the attached Maps. The work is located in the following counties: Rio Arriba, San Miguel, Sandoval, Santa Fe, Mora, and Los Alamos.

DESCRIPTION OF WORK

The maintenance and reconstruction shall maintain the road prism and drainage to allow a prudent driver to safely negotiate the road in a passenger car. Contractor shall utilize existing turnouts or roads as turnaround points to minimize resource damage with all vehicles and equipment to the greatest extent possible.

1. Roadway Reconditioning

Road maintenance shall include reshaping roadway to create a road template with appropriate out-slope, in-slope, or crown construction with compaction as specified. The enclosed video link under Specifications provides a visual description of the following contract requirements.

The crown and/or slope of the road shall be maintained according to the Drawings and Specifications. If a change from the existing road prism is needed, the COR will flag those locations in the field. Maintenance operations shall not widen the traveled way unless specifically instructed otherwise by the CO. All berms generated shall be removed from the shoulders and all suitable material shall be incorporated into the traveled way surface. Existing berms shall be removed unless otherwise agreed, incorporating suitable material into the traveled way. Turnouts shall also be included with the blading of the road surface. Berms caused by road maintenance operations shall be removed from the traveled way prior to the end of each day's work.

The blading shall proceed in an orderly fashion by successive passes with graders parallel to the road centerline, progressing from the lower side to the upper side of the roadbed and back across. In the process, shoulder material shall be cut and removed to prevent vegetation encroachment.

On native surface roads, all corrugations, depressions, and washouts shall be removed by scarifying or cutting below such defects. Fines accumulated in blading roads or from drainage ditches shall not be wasted over fill shoulders or in ditches.

On aggregate surface roads, all corrugations, depressions, and washouts shall be removed by scarifying or cutting below the defect on the aggregate surface. If the defect reaches into the roadbed, the Contractor shall preserve surfacing material prior to scarifying or cutting below the defect and then subsequently replace surfacing material after repair has been accomplished.

Rocks, woody debris, or other material larger than three (3) inches remaining on the traveled way after the final blading shall be disposed of by side-casting unless otherwise shown on the drawings. Side-casting into streams, lakes or water courses shall not be permitted.

The roadbed immediately before and after cattleguards and bridges shall be bladed in such a manner as to create a smooth transition. Material shall not be deposited inside cattleguards or onto bridges. Any material deposited on bridge decks, including any accumulated material, shall be removed from bridge decks.

Intersecting roads shall be bladed for fifty (50) feet to ensure proper transitioning of the two riding surfaces.

Cleaning culverts and related items such as catch basins, outlet ditches, trash racks, drop inlets, headwalls, aprons, and riprap shall be incidental to roadway reconditioning. Drainage structures and related items shall be cleared of all foreign material and all vegetative growth which interferes with the flow pattern.

Grass or other vegetative material that does not interfere with the flow shall be left in place. Culverts which have silted into a depth of one-quarter (1/4) of their opening height or more shall have their inlet and outlet cleaned as well as three

(3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert. If debris is lodged in the culvert to the extent it cannot be cleaned manually, the CO shall be notified of the location within 5 working days for a final determination of corrective measures to be taken.

Unless otherwise shown on the drawings, catch basins shall be cleared of material to the bottom of the invert of the culvert and at least eighteen (18) inches horizontally towards the backslope or the width of the basin, whichever is greater.

The backslope shall be cleaned of loose material ensuring the slope is not increased or undercut. Inlet channel transition from the ditch line to the catch basin shall be cleaned. Material removed, if suitable, shall be blended into existing native or aggregate road surfaces or shoulders. On aggregate surfaced roads, care must be taken to ensure unsuitable material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by side-casting unless otherwise shown on the drawings; side-casting into streams, lakes or water courses shall not be permitted.

2. Ditch Reconditioning

This work shall include the removal and disposal of all slough material and debris from drainage ditches, outlet ditches, and lead-off ditches to provide a hydrologically sound, unobstructed, and free-draining ditch. Ditch reconditioning locations will be staked by the COR. Ditches shall be cleaned to conform to previous line, grade, and cross section. Contractor shall ensure positive drainage is established. Vegetative growth that interferes with the flow pattern shall be removed; however, vegetation shall be left in place provided drainage is not obstructed. Cleaning is not required on ditches that provide drainage and are free of debris larger than four (4) inches in any direction. Suitable material may be worked into traveled way; unsuitable material shall not be blended into or bladed across the existing road surface or shoulder. Limbs and wood chunks in excess of four (4) inches in any direction shall be removed from ditches and placed outside clearing limits. On aggregate surfaced roads, care must be taken to ensure unsuitable material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by side-casting unless otherwise shown on the drawings. Side-casting into streams, lakes or water courses shall not be permitted.

3. Cattleguard Cleaning

Any cattleguard encountered with less than 12” of clearance from bottom of rails to material inside shall be cleaned out. The cleaned cattleguard shall be free of dirt and debris to a minimum depth of two (2) feet below the bottom of rails or to the base, depending on type of cattleguard. Where there are existing ditches, cleaning shall include removing material from the ditch to provide for drainage through the installation. Wildlife consideration shall include an escape route for small animals who may become entrapped. A dirt or rock (angular, greater than 4” diameter) ramp shall be placed in one corner of the cattle guard, not interfering with cattle guard function. Removed materials shall be disposed of outside the clearing limits and away from any streams, lakes, or water courses. If the deck is required to be removed to facilitate repair or cleaning and there is no bypass, delay for traffic shall not exceed two (2) hours contingent on at least two (2) business days advance notice to the CO for the planned work and all required traffic control including signs are in place. Roadbed and surfacing materials disturbed by the Contractor’s operations shall be conserved separately, replaced, and compacted to conform to the adjacent roadbed material, ensuring a smooth transition to the maintained cattleguard. Loose rails shall be welded or bolted back in place. Ruptured welds and localized cracks shall be rewelded. The Government may furnish replacement material for damaged or defective cattleguard components. Notify CO as soon as practicable if a cattleguard component is unable to be repaired.

SPECIFICATIONS

The specifications used is this contract are found in “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects” (FP-14), to be consistent with Forest Service and Federal Agency Policies, and the Forest Service Supplemental Specifications (FSSS) included within the contract. Where conflict or differences exist, the FSSS supersede the FP-14. FSSS may add to, delete from, or modify the FP-14 Specifications. FSSS are applicable to this project and are included in full text as an attachment. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. FP-14 is available from: http://flh.fhwa.dot.gov/resources/specs/fp-14.htm. FP-14 is found on this site under Home > Resources > Specifications.

Applicable sections include, but are not limited to, sections listed below and sections or subsections referenced therein.

Section 100 — GENERAL REQUIREMENTS (ALL) Section 150 — PROJECT REQUIREMENTS (ALL) Section 200 — EARTHWORK (ALL) Section 301 — UNTREATED AGGREGATE COURSES Section 303 — ROAD RECONDITIONING Section 600 — INCIDENTAL CONSTRUCTION (AS APPLICABLE) Section 700 — MATERIAL (AS APPLICABLE)

Other applicable specifications include the following:

MUTCD: : https://mutcd.fhwa.dot.gov/.

EM 7100-15: https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprd3810021.pdf .

The following video may be viewed to enhance the Contractor’s knowledge of Forest Service roads, specifications, and expectations:

https://www.youtube.com/watch?v=nTEfXsDqdUg.

http://flh.fhwa.dot.gov/resources/specs/fp-14.htm https://mutcd.fhwa.dot.gov/ https://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprd3810021.pdf https://www.youtube.com/watch?v=nTEfXsDqdUg

Jemez

Ranger District

Espanola

Ranger District

Coyote

Ranger District

Cuba

Ranger District

Espanola

Cuba

Santa Fe

FOREST LOCATION

VICINITY MAP

SHEET OF

United States Department of Agriculture

Forest Service

ROAD MAINTENANCE CONTRACT

FY 2021

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER

DISTRICT RANGER DATE

DATE

DIRECTOR OF ENGINEERING

DATE

FOREST SUPERVISOR

DATE

RO PROGRAM MANAGER

DATE

NEW MEXICO

LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, SANDOVAL, AND SANTA FE COUNTIES

(R03) SOUTHWESTERN REGION

SANTA FE NATIONAL FOREST

COYOTE, CUBA, ESPANOLA, JEMEZ, PECOS/LAS VEGAS RANGER DISTRICTS

INDEX OF SHEETS

SHEET SHEET TITLE DATE

AutoCAD SHX Text

AutoCAD SHX Text

COVERSHEET

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

AutoCAD SHX Text

CONTRACT ROAD LIST

AutoCAD SHX Text

AutoCAD SHX Text

CONTRACT BASE MAP

AutoCAD SHX Text

AutoCAD SHX Text

DISTRICT OPTION MAPS

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL ROAD DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL DRAINAGE FEATURE DETAILS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

CONTRACT

FY2021

SANTA FE NATIONAL

FOREST

GENERAL NOTES

01/15/2021

L.ARCHULETA

L.A.

P.G.

02 07

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

1. CONTRACTOR SHALL FURNISH ALL MATERIALS, SUPPLIES, CONTRACTOR SHALL FURNISH ALL MATERIALS, SUPPLIES, SIGNING, EQUIPMENT, TRANSPORTATION, LABOR, SUPERVISION, AND INCIDENTALS NECESSARY TO COMPLETE ALL CONTRACTED PROJECT WORK. 2. CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN ALL CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN ALL NECESSARY BARRICADES, SUITABLE AND SUFFICIENT WARNING SIGNS, DANGER SIGNALS AND FURNISH ALL NECESSARY TRAFFIC CONTROL FLAGGING. ALL SIGNS AND DEVICES REMAIN THE PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR. ALL TRAFFIC CONTROL SIGNS AND DEVICES SHALL CONFORM TO MUTCD. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN FOR THE PROTECTION OF THE WORK AND SAFETY OF THE PUBLIC. 3. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN 14 CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN 14 DAYS PRIOR TO CONSTRUCTION TO THE CO FOR REVIEW AND APPROVAL. 4. CONTRACTOR IS RESPONSIBLE FOR OBTAINING NECESSARY CONTRACTOR IS RESPONSIBLE FOR OBTAINING NECESSARY PERMITS FOR THE CONSTRUCTION ACTIVITIES, INCLUDING ANY ASSOCIATED FEES. 5. CONTRACTOR IS RESPONSIBLE FOR CONTACTING NEW MEXICO CONTRACTOR IS RESPONSIBLE FOR CONTACTING NEW MEXICO 811 FOR UTILITY LOCATES PRIOR TO ANY EXCAVATION WORK. 6. WHEN OPERATING ADJACENT TO RAILWAYS, TELEPHONE, POWER WHEN OPERATING ADJACENT TO RAILWAYS, TELEPHONE, POWER LINES, OR ANY OTHER TYPE OF UTIILITY, THE CONTRACTOR SHALL MAKE ALL NECESSARY ARRANGEMENTS TO PREVENT DAMAGE AND SHALL ASSUME ALL RESPONSIBILITY SHOULD DAMAGE OCCUR. 7. PUBLIC AND PRIVATE PROPERTY ADJACENT TO THE PROJECT PUBLIC AND PRIVATE PROPERTY ADJACENT TO THE PROJECT SHALL NOT BE DAMAGED. ANY DAMAGED OR DESTROYED PROPERTY SHALL BE PROMPTLY REPAIRED OR REPLACED AT CONTRACTOR'S EXPENSE. 8. CONTRACTOR'S EQUIPMENT SHALL BE MADE AVAILABLE FOR CONTRACTOR'S EQUIPMENT SHALL BE MADE AVAILABLE FOR INSPECTION AND DEEMED WEED FREE BY COR PRIOR TO TRANSPORT ON TO FOREST SERVICE LANDS. 9. THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14 U.S. CUSTOMARY UNITS) ARE INCLUDED IN THE BID PACKAGE BY REFERENCE AND SHALL BE ADHERED TO ALONG WITH THE FSSS AND ANY OTHER SPECIFICATIONS INCLUDED IN THIS CONTRACT. 10. CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY AND CONTRACTOR IS RESPONSIBLE FOR THEIR OWN SECURITY AND FOR THE SECURITY OF THEIR PROPERTY. 11. REMOVE ALL ROCK GREATER THAN 4" IN ANY DIRECTION FROM REMOVE ALL ROCK GREATER THAN 4" IN ANY DIRECTION FROM ROADWAY DITCHES. ROCK MAY BE USED AS RIPRAP IN CULVERT CATCHMENTS. 12. BERMS OF MATERIALS OR OTHER OBSTRUCTIONS CAUSED BY BERMS OF MATERIALS OR OTHER OBSTRUCTIONS CAUSED BY ROAD MAINTENANCE OPERATIONS SHALL BE REMOVED PRIOR TO THE END OF EACH DAY'S OPERATIONS AND ARE NOT TO REMAIN OVERNIGHT, WEEKENDS, OR HOLIDAYS. IF, DUE TO WEATHER CONDITIONS OR EQUIPMENT BREAKDOWNS, BERMS OR OBSTRUCTIONS CANNOT BE REMOVED, THEY SHALL BE SIGNED AS A HAZARD AND CO AND COR NOTIFIED. 13. CONTRACTOR'S OPERATION SHALL BE CONDUCTED SO AS TO CONTRACTOR'S OPERATION SHALL BE CONDUCTED SO AS TO PREVENT SILTATION OF STREAM BEDS, LAKES, STOCK TANKS OR RESERVOIRS. POLLUTANTS SUCH AS FUELS, LUBRICANTS, BITUMEN, AND ANY OTHER HARMFUL MATERIAL SHALL NOT BE DISCHARGED ON FOREST SERVICE LANDS. 14. CONTRACTOR SHALL NOT PLACE AGGREGATE IN THE FLOW LINE CONTRACTOR SHALL NOT PLACE AGGREGATE IN THE FLOW LINE OF ANY LOW WATER CROSSINGS. 15. MECHANIZED EQUIPMENT SHALL NOT BE OPERATED OUTSIDE OF MECHANIZED EQUIPMENT SHALL NOT BE OPERATED OUTSIDE OF THE EXISTNG ROAD PRISM WITHOUT PRIOR ARCHEOLOGICAL SURVEY AND CLEARANCE. 16. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT/PERSONNEL AS THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT/PERSONNEL AS REQUIRED BY THE FIRE PLAN(S). 17. CONTRACTOR'S EQUIPMENT PROVIDED FOR THE PERFORMANCE CONTRACTOR'S EQUIPMENT PROVIDED FOR THE PERFORMANCE OF THE WORK SHALL BE OF THE APPROPRIATE SIZE, TYPE, AND NUMBER, AND IN GOOD WORKING CONDITION. SUITABLE FOR THE WORK REQUIRED. 18. OPERATORS SHALL BE COMPETENT AND EXPERIENCED IN THE OPERATORS SHALL BE COMPETENT AND EXPERIENCED IN THE OPERATION OF THE EQUIPMENT. EQUIPMENT SHALL HAVE SAFETY SIGNING AND APPURTENANCES REQUIRED BY OSHA, SUCH AS ROLLOVER PROTECTION (ROPS), FIRE SUPPRESSION DEVICES, LIGHTS AND SLOW MOVING VEHICLE SIGNS. 19. THE EQUIPMENT USED MUST BE CAPABLE OF CUTTING, THE EQUIPMENT USED MUST BE CAPABLE OF CUTTING, CROWNING, AND SHAPING OPERATIONS NECESSARY TO SUCCESSFULLY PERFORM THE TASKS OF THIS CONTRACT. 20. IF AT ANY TIME DURING THE COURSE OF THIS CONTRACT, THE IF AT ANY TIME DURING THE COURSE OF THIS CONTRACT, THE EQUIPMENT IS DEEMED TO BE UNSATISFACTORY OR UNSAFE, THE CO MAY REQUIRE REMOVAL AND A SATISFACTORY REPLACEMENT AT NO EXPENSE TO THE GOVERNMENT. ANY MOVEMENT OR TRANSPORTATION OF EQUIPMENT TO OR FROM THE WORK AREAS TO REPAIR OR REPLACE EQUIPMENT, OR FOR THE CONTRACTOR'S CONVENIENCE SHALL BE AT THE CONTRACTOR'S EXPENSE.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

CONTRACT

FY2021

SANTA FE NATIONAL

FOREST

CONTRACT ROAD LIST

01/15/2021

L.ARCHULETA

L.A.

P.G.

03 07

FY 2021 ROAD MAINTENANCE CONTRACT ROAD LIST

& DISTRICT OPTION ROADS

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

Jemez

Espanola

Ranger District

Coyote

Ranger District

Cuba

Ranger District

Espanola

Cuba

Santa Fe

EMP NFSR 31/ NFSR 27 JCT.

BMP NFSR 31 / FOREST BDY.

EMP NFSR 99 / NFSR 144 JCT.

BMP NFSR 99 / NFSR 100 JCT.

EMP NFSR 376 / NM 126

BMP NFSR 376 END OF ASPHALT

EMP NFSR 604 / NFSR 604T JCT.

BMP NFSR 604 / NFSR 376 JCT.

EMP NFSR 27 / FOREST/GRANT BDY.

BMP NFSR 27 / NFSR 31 JCT.

EMP NFSR 103 / NM 126 JCT.

BMP NFSR 103 / NM 96 JCT.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

CONTRACT

FY2021

SANTA FE NATIONAL

FOREST

CONTRACT BASE MAP

01/15/2021

L.ARCHULETA

L.A.

P.G.

04 07

SANTA FE NATIONAL FOREST

FY 2021 ROAD MAINTENANCE CONTRACT ROAD LIST

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Coyote

Espanola

Ranger District

Jemez

Ranger District

Cuba

EMP NFSR 100/ NFSR 316 JCT.

BMP NFSR 100/ NM96 JCT.

Cuba

Ranger District

Coyote

Ranger District

Jemez

Ranger District

Cuba

BMP NFSR 69 / NFSR 103 JCT.

EMP NFSR 69 / NFSR 70 JCT.

BMP NFSR 70 / NM 126 JCT.

EMP NFSR 70 / NFSR 103 JCT.

BMP NFSR 95 / CR 16 JCT.

EMP NFSR 95 / TRAILHEAD

C

R

Las Vegas

Pecos / Las Vegas

Ranger District

BMP NFSR 263 @ END PRIVATE

EMP NFSR 263 / TRAILHEAD

BMP NFSR 156 @ NFSR 263

EMP NFSR 156 / JOHNSON VISTA RD.

BMP NFSR 18 @ FOREST BOUNDARY

EMP NFSR 18 / NFSR 156 JCT.

Coyote

Ranger District

Espanola

Ranger District

Cuba

Ranger District

Jemez

Ranger District

Espanola

BMP NFSR 144 @ FOREST BDY.

EMP NFSR 144 / NFSR 99 JCT.

BMP NFSR 144 @ NM 126 JCT.

EMP NFSR 144 / NFSR 315 JCT.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

CONTRACT

FY2021

SANTA FE NATIONAL

FOREST

DISTRICT OPTION MAPS

01/15/2021

L.ARCHULETA

L.A.

P.G.

05 07

Coyote Ranger District

Option 1 Roads

Cuba Ranger District

Option 2 Roads

Espanola / Jemez Ranger District

Option 3&4 Roads

Pecos / Las Vegas Ranger District

Option 5 Roads

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

CONTRACT

FY2021

SANTA FE NATIONAL

FOREST

TYPICAL ROAD DETAILS

01/15/2021

L.A.

L.ARCHULETA

P.G.

06 07

MAINTAIN EXISTING ROAD TEMPLATE.

EXISTING DITCH DEPTH SHALL NOT BE INCREASED UNLESS NECESSARY TO PROVIDE FOR ADEQUATE

DRAINAGE.

THE TRAVELED WAY INDICATED SHALL NOT BE WIDENED EXCEPT FOR CURVE WIDENED AREAS OR

TURNOUTS.

BERMS SHALL NOT BE CONSTRUCTED. RIP AND OR SCARIFY THE EXISTING ROADBED PER THE

RECONDITIONING SPECIFICATIONS TO PROVIDE A SMOOTH, UNIFORM SHAPED SURFACE. THE

ROADBED SHALL BE APPROVED BY THE COR PRIOR TO PLACEMENT OF ANY SURFACING MATERIAL, IF

APPLICABLE.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

ROADWAY

AutoCAD SHX Text

ROADWAY

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text

NATURAL

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

TEMPLATE

AutoCAD SHX Text

NATURAL

AutoCAD SHX Text

GROUND

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

TEMPLATE

AutoCAD SHX Text

MIN. 3%%% INSLOPE

AutoCAD SHX Text

CLEARING LIMITS WILL BE WHICHEVER IS GREATER

AutoCAD SHX Text

SHOULDER +6' OR HEAL/TOE OF SLOPE +3'

AutoCAD SHX Text

CLEARING LIMITS WILL BE WHICHEVER IS GREATER

AutoCAD SHX Text

SHOULDER +6' OR HEAL/TOE OF SLOPE +3'

AutoCAD SHX Text

4" MIN.

AutoCAD SHX Text

COMPACTED

AutoCAD SHX Text

DEPTH

AutoCAD SHX Text

MIN. 3%%% OUTSLOPE

AutoCAD SHX Text

TYPICAL CROWN CROSS-SECTION

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

MIN 2%%% SLOPE

AutoCAD SHX Text

MIN 2%%% SLOPE

AutoCAD SHX Text

TEMPLATE

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

AGGREGATE OR

NATIVE SURFACING

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

(R03)

SOUTHWESTERN REGION

ROAD

MAINTENANCE

PROJECTS

FY2021

SANTA FE NATIONAL

FOREST

TYPICAL DRAINAGE

FEATURE DETAILS

01/15/2021

L.A.

L.ARCHULETA

P.G.

07 07

AutoCAD SHX Text

PERSPECTIVE VIEW

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text

DOWN GRADE

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

ORIGINAL SLOPE LINE

AutoCAD SHX Text

ORIGINAL

AutoCAD SHX Text

GRADE LINE

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

20' MIN

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

1. THE MINIMUM CROSS GRADE FROM "B" TO "E"

AutoCAD SHX Text

IS 4%%% GREATER THAN THE ORIGINAL ROAD GRADE.

AutoCAD SHX Text

2. SKEW LINE B-E TO FIT LOW POINT IN DRAW, IF

AutoCAD SHX Text

LOCATED IN NATURAL DRAIN.

AutoCAD SHX Text F

AutoCAD SHX Text

(MIN)

AutoCAD SHX Text

AutoCAD SHX Text 10'

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text

STATION OR MILEPOST

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

PROFILE SUBGRADE

AutoCAD SHX Text 6"

AutoCAD SHX Text

OUTSLOPE 3-5%

AutoCAD SHX Text A

AutoCAD SHX Text 8'

AutoCAD SHX Text A

AutoCAD SHX Text

CUT

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

FILL

AutoCAD SHX Text

SLOPE

AutoCAD SHX Text

R-SUBGRADE

AutoCAD SHX Text

TREATMENT

AutoCAD SHX Text

PAY ITEM NO. %%U %%U AND %%U

AutoCAD SHX Text

S-SLOPE

AutoCAD SHX Text

PROTECTION

AutoCAD SHX Text

PAY ITEM NO. %%U

AutoCAD SHX Text

* DRAWINGS NOT TO SCALE

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SECTION A-A

AutoCAD SHX Text

PROFILE

AutoCAD SHX Text 6"

AutoCAD SHX Text

STANDARD DETAIL FOR DRAIN DIP

AutoCAD SHX Text X

AutoCAD SHX Text 50'

AutoCAD SHX Text 50'

AutoCAD SHX Text 50'

AutoCAD SHX Text 50'

AutoCAD SHX Text 50'

AutoCAD SHX Text

STATION OR MILEPOST

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text

PROFILE SUBGRADE

AutoCAD SHX Text

PROFILE

AutoCAD SHX Text

%%USTANDARD DETAIL FOR GRADE SAG

AutoCAD SHX Text

SEE DRAINAGE LISTING FOR ALL LOCATIONS

AutoCAD SHX Text

SEE DRAINAGE LISTING FOR ALL LOCATIONS

AutoCAD SHX Text

WHEN REQUIRED

AutoCAD SHX Text

WHEN REQUIRED

AutoCAD SHX Text

3. THE MINIMUM DIFFERENCE IN ELEVATION BETWEEN

AutoCAD SHX Text

SAG AND THE CREST OF THE DRAIN DIP IS 1.0 FEET.

AutoCAD SHX Text

%%UTYPICAL DRAINAGE FEATURE DETAILS

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.06 Use of Roads by Contractor

105 - Control of Material

105.02(c) Contractor-located sources

105.02 (a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

107 - Legal Relations and Responsibility to the Public

Delete Subsection 107.05

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

151 - Mobilization ..................................................................................................... Error! Bookmark not defined.

153 - Contractor Quality Control

153.02 Qualifications

153.07 Records and control charts

155 - Schedules for Construction Contracts

Delete Section 155. ................................................................................................. Error! Bookmark not defined.

156 - Public Traffic

Section 156. – PUBLIC TRAFFIC

157 - Soil Erosion and Sediment Control

157.04 General

201 - Clearing and Grubbing

Section 201. — CLEARING AND GRUBBING

201.06 Disposal

203 - Removal of Structures and Obstructions

203.04 (b) General

203.05 Disposing of Material

204 - Excavation and Embankment

Section 204. — EXCAVATION AND EMBANKMENT

209 - Structure Excavation and Backfill

209.10 Compacting

301 - Untreated Aggregate Courses

301.03 General

301.05 Compacting

303 - Road Reconditioning

303.07 Roadway Reconditioning

Preface Preface_wo_01_07_2021

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions

101.01_National_9_15_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_4_7_2015

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_9_5_2018

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_9_15_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_9_15_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_9_15_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_9_16_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_National_10_23_2016

Add the following to Subsection 105.02c:

105.02(c) Contractor-located sources.

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor.

Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area.

A Forest Service weed specialist will inspect proposed sources to determine weed-free status. Provide the Contracting Officer written notification of proposed material sources thirty (30) days prior to use. Written approval of the specific source will be provided to the contractor by the CO. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.

105.02_National_10_23_2016

Add the following to Subsection 105.02 (a):

105.02 (a) Government-provided sources.

Complete any pit or quarry development specified for a designated source, even when material is not obtained from the source.

105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.

If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation.