This federal contract opportunity solicitation seeks construction services for replacing water distribution lines, upgrading a well head, and replacing hydrants at the Lynx Lake Recreation Area. Key details include:

  • The project scope includes replacing all water distribution lines and upgrading the well head and hydrants throughout the Lynx Lake water system.

  • The construction value is estimated between $750,000 to $850,000. The NAICS code is 237110.

  • A pre-bid site visit will be held on June 9, 2021. Questions are due by June 14, 2021 and bids are due by June 30, 2021.

  • The soliciting agency is the USDA Forest Service Southwestern Region R3. A bid bond of 20% is required.

View the file

Other files for this federal contract opportunity

Other files attached to CONT030903 ENG Lynx Lake Water System, newest first.
File Type Posted
127EAX21R0011 amendment 3.pdf PDF
CONT030903 Lynx Lake Water System - Specifications.pdf PDF
PNF Industrial Fire Precaution Plan - 2021.pdf PDF
Lynx Lake Water Replacement Responses to Question 127EAX21R0011 7.7.2021.pdf PDF
127EAX21R0011 amendment 2.pdf PDF
127EAX21R0011 Amendment 1.pdf PDF
WD AZ20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 1 co

Water and Sewer Line and Related Structures Construction

A Site Visit will be held Wednesday, June 9, 2021 at 10:00 AM PT

Lynx Lake Campground located at 34°31’03.04”N 112°23’27.50”W.

To reach the site, travel east from Prescott, AZ on AZ-69 S approximately 4 miles, turn on right onto Walker Road, continue south on Walker Road for approximately 2.4 Miles then turn left into Lynx Lake Campground.

Questions are due Monday, June 14, 2021.

Bid proposals are due Wednesday, June 30, 2021 3:00 PM PT

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM 87102-3498

7EAX

DAVID L. WATSON

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

127EAX21R0011

Delivery: 01/24/2022

Delivery Location Code: 8191

PRESCOTT NATIONAL FOREST

344 SOUTH CORTEZ

PRESCOTT AZ 86303 US

Period of Performance: 07/28/2021 to 01/24/2022

0001 CONT 030900 Lynx Lake Water System - This project will include the replacement of all water distribution line, upgrades to the well head and hydrants throughout the water system at the Lynx

Lake Recreation Area.

Product/Service Code: Y1NE

Product/Service Description: CONSTRUCTION OF

WATER SUPPLY FACILITIES

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

11900 Mobilization/Demobilization LSQ LS 1 As-Built LSQ LS 1

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1A-2"-2" HDPE Water Line Rplacement - 2" & 2" AQ LF 2030 221100-1A-2"-3" HDPE Water Line Rplacement - 2" & 3" AQ LF 170 221100-1A-2" HDPE Water Line Rplacement - 2" AQ LF 1775 221100-1A-1.5" HDPE Water Line Rplacement - 1.5" AQ LF 610 221100-1A-1" HDPE Water Line Rplacement - 1" AQ LF 1270

221100-2A New Waterline Connection to Existing Line DQ EA 15

221100-3A-1" Curb Valve & Box Installation - 1" DQ EA 16 221100-3A-1.5" Curb Valve & Box Installation - 1.5" DQ EA 6 221100-3A-2" Curb Valve & Box Installation - 2" DQ EA 12 221100-4A Daylight Drain Replacement AQ EA 3

221103-2A Air Combination Valve Assembly & Box Installation - 1" DQ EA 1

221103-3A-0.5" Pressure Reducing Valve Assembly & Box Installation - 0.5" DQ EA 5

221103-3A-1" Pressure Reducing Valve Assembly & Box Installation - 0.5" DQ EA 2

221103-3A-1.5" Pressure Reducing Valve Assembly & Box Installation - 0.5" DQ EA 1

017320-1A Pitless Adaptor Installation, & Well Cap Replacement LSQ LS All

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1B-2"-3" HDPE Water Line Replacement - 2" & 3" in Common Trench AQ LF 1210

221100-1B-1" HDPE Water Line Replacement - 1" AQ LF 30

221100-2B New Waterline Connection to Existing Line DQ EA 1

221100-3B-1" Curb Valve & Box Installation - 1" DQ EA 2 221100-3B-2" Curb Valve & Box Installation - 2" DQ EA 1 221100-3B-3" Curb Valve & Box Installation - 3" DQ EA 3 221100-4B Daylight Drain Replacement AQ EA 1

221103-1B-1.5" Water Meter Assembly & Box Replacement - 1.5" DQ EA 1

Schedule of Items Lynx Lake Water System Replacement

Phase A - Lynx Campground

Phase B - Storage

Phase A Bid Price

Phase B Bid Price

Bid Price

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1C-2" HDPE Water Line Rplacement - 2" AQ LF 1145 221100-1C-1.5" HDPE Water Line Rplacement - 1.5" AQ LF 145 221100-1C-1" HDPE Water Line Rplacement - 1" AQ LF 320

221100-2C New Waterline Connection to Existing Line DQ EA 6

221100-3C-1" Curb Valve & Box Installation - 1" DQ EA 7 CC1100-3C-1.5 Curb Valve & Box Installation - 1.5" DQ EA 2 221100-3C-2" Curb Valve & Box Installation - 2" DQ EA 2 221100-4C Daylight Drain Replacement AQ EA 3

221103-1C-5/8" Water Meter Assembly & Box Replacement - 5/8" DQ EA 2

221103-2C Air Combination Valve Assembly & Box Installation - 1" DQ EA 1

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1D-2" HDPE Water Line Rplacement - 2" AQ LF 2560 221100-1D-1" HDPE Water Line Rplacement - 1" AQ LF 605

221100-2D New Waterline Connection to Existing Line DQ EA 4

221100-3D-1" Curb Valve & Box Installation - 1" DQ EA 9 221100-3D-2" Curb Valve & Box Installation - 2" DQ EA 7 221100-4D Daylight Drain Replacement AQ EA 2

221103-1D-5/8" Water Meter Assembly & Box Replacement - 5/8" DQ EA 2

221103-3D-0.5" Pressure Reducing Valve Assembly & Box Installation - 0.5" DQ EA 2

221105.-1D Hose Bibb and Backflow Prevention Assembly Replacement DQ EA 1

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1E-2" HDPE Water Line Rplacement - 2" AQ LF 1335 221100-1E-1" HDPE Water Line Rplacement - 1" AQ LF 100

221100-2E New Waterline Connection to Existing Line DQ EA 1

221100-3E-1" Curb Valve & Box Installation - 1" DQ EA 4 221100-3E-2" Curb Valve & Box Installation - 2" DQ EA 6 221100-4E Daylight Drain Replacement AQ EA 1

221105.-1E Hose Bibb and Backflow Prevention Assembly Replacement DQ EA 2

Phase C - North Shore Day Use Area

Phase D - Eagle Ridge/Periquin Campgrounds

Phase E - South Shore Day Use Area

Phase C Bid Price

Phase D Bid Price

Phase E Bid Price

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1F-2" HDPE Water Line Rplacement - 2" AQ LF 3450 221100-1F-1" HDPE Water Line Rplacement - 1" AQ LF 560

221100-2F New Waterline Connection to Existing Line DQ EA 7

221100-3F-1" Curb Valve & Box Installation - 1" DQ EA 12 221100-3F-2" Curb Valve & Box Installation - 2" DQ EA 8 221100-4F Daylight Drain Replacement AQ EA 3

221103-1F-5/8" Water Meter Assembly & Box Replacement - 5/8" AQ EA 1

221103-3F-0.5" Pressure Reducing Valve Assembly & Box Installation - 0.5" AQ EA 1

221105.-1F Hose Bibb and Backflow Prevention Assembly Replacement AQ EA 1

Base Pay Item Number Description Method of

Measurement Unit Quantity Cost Per Unit Total Cost

221100-1G-3" HDPE Water Line Rplacement - 3" AQ LF 5120 221100-1G-1" HDPE Water Line Rplacement - 1" AQ LF 60 221100-3G-1" Curb Valve & Box Installation - 1" DQ EA 2 221100-3G-3" Curb Valve & Box Installation - 3" DQ EA 4 221100-4G Daylight Drain Replacement AQ EA 2

221103-2G Air Combination Valve Assembly & Box Installation - 1" AQ EA 2

Phase G - Walker Road Distribution

Total Bid Price

Phase F - Hilltop Campground

Phase F Bid Price

Phase G Bid Price

STATEMENT OF WORK

PRESCOTT NATIONAL FOREST

CONT030903 Lynx Lake Water System - SOW

Prescott National Forest, Bradshaw Ranger District Page 1

Table of Contents

SECTION 1 – GENERAL

1.01 INTRODUCTION

1.02 BACKGROUND

1.03 LOCATION

1.04 GENERAL SITE CONDITIONS, FACILITIES AND TEMPORARY CONTROLS

1.05 USE OF PREMISES

1.06 CONSTRUCTION SCHEDULE

1.07 CONSTRUCTION FACILITIES

SECTION 2 - PROJECT ADMINISTRATION & COORDINATION

2.01 ADMINISTRATION

SECTION 3 – TYPE OF AWARD AND BASIS FOR AWARD

3.01 AWARD TYPE

3.02 BASIS FOR AWARD

Prescott National Forest, Bradshaw Ranger District Page 2

SECTION 1 – GENERAL

1.01 INTRODUCTION

This project will include the replacement of all water distribution line, upgrades to the well head and hydrants throughout the water system at the Lynx Lake Recreation Area.

1.02 BACKGROUND

The Lynx Lake water system was constructed in 1983. It is a public water system and provides water as one system to the entire Lynx Lake recreational area which includes four campgrounds (Lynx Lake, Eagle Ridge, Peregrine and Hilltop), two day use areas (Northshore and Southshore), the privately operate Marina/General Store and a privately occupied resident adjacent to the store at the Northshore. This system was improperly bedded and backfilled during construction causing multiple leaks in the system every year.

1.03 LOCATION

The Lynx Lake Recreation Area is located in Yavapai County, Southeast of Prescott AZ.

The entrance of Lynx Lake Campground is at 34°31’03.04” N 112°23’27.50” W and to To reach the site, travel east from Prescott on AZ-69 S for 4 miles before turning right onto Walker Road. Continue on Walker Road for 2.4 Miles then turn left into Lynx Lake Campground.

1.04 GENERAL SITE CONDITIONS, FACILITIES AND TEMPORARY CONTROLS

A. The elevation of the Recreation Area is approximately 5641 feet above sea level. The construction site is in a rural mountainous setting and experiences snowfall and cold temperatures, with snow on the ground intermittently from November through March.

B. In-depth soil surveys have not been performed; however, fractured granite and shale at the ground surface is evident throughout the area. Blasting of rocks will not be permitted without special permission.

C. In-depth water table surveys have not been performed. The Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.

D. Site wide water service interruption shall be limited to a maximum of seven (7) consecutive days and shall limit interruption on weekends and Federal holidays. Construction shall be staged such that water service is maintained to the extent possible. Individual recreation site area closures shall not exceed 14 days. Include closures and service interruptions in construction schedule for review and notify COR 14 days prior to start of any area closure or service interruption.

Prescott National Forest, Bradshaw Ranger District Page 3

1.05 USE OF PREMISES

A. General: Contractor shall have full use of premises for construction operations, including use of project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other contractors on portions of project.

B. Contractor shall conduct his operations to ensure the least inconvenience to the public and FS personnel. Work is limited to the hours of 7 a.m. – 8 p.m. to accommodate FS personnel living onsite and members of the public at adjacent recreation facilities.

C. Walker Road is maintained by Yavapai County. Coordinate with the County as necessary.

Provide traffic detour.

D. Notify Contracting Officer (CO) and Contracting Officer’s Representative (COR) at least 72 hours prior to start of work.

E. Confine storage of materials to areas as approved by the COR.

F. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

G. Preservation of Natural Features: Confines all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

1. Provide temporary barriers to protect existing trees and plants and root zones.

2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with CO and remove agreed-on roots and branches that interfere with construction.

3. Do not fasten ropes, cables, or guides to existing trees.

4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

H. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities.

Call Arizona 811 or 1-800-STAKEIT in advance of excavation for the marking of underground utilities. If damage occurs, repair utility at no additional expense to the Government.

2. Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.

I. Preservation of Natural Features: The Contractor shall stop work and contact the CO and the COR immediately if archeological sites or artifacts are encountered during any excavation.

Prescott National Forest, Bradshaw Ranger District Page 4

1.06 CONSTRUCTION SCHEDULE

A. Work shall begin no more than 10 day after the notice to proceed is issue by the Contracting Officer.

B. The Contractor shall give the COR 72 hours’ notice prior to beginning work.

C. Work shall be completed within 180 days of the project start date.

D. The Contractor shall provide a detailed construction schedule to the COR prior to the commencement of the project and will provide updated schedules to the COR within 48 hours of any revisions to the schedule.

1.07 CONSTRUCTION FACILITIES

A. Work zone barriers –Work zones shall be delineated and marked to adequately warn employees and visitors of operating equipment and hazardous conditions. The Contractor is responsible for providing barrier materials and maintaining barriers such as temporary barricades, barrier tape, curbs, etc., at work zones.

B. Work limits – ground disturbance and equipment shall be confined to the minimal area in each area of work. The Contractor is responsible for establishing the work limits and marking or otherwise communicating the limits to Contractor personnel.

C. Fire protection – refer to contract Fire Plan requirements that determine Contractor responsibility for measures and equipment to prevent fires, work restrictions during fire danger, and assistance to be rendered in case of fire.

D. Clean up – the Contractor shall remove all temporary facilities and restore prior conditions as part of project closeout. Any damage to existing improvements shall be repaired at the Contractor’s expense. Any disturbance to soil and vegetation outside of work limits caused by the Contractor shall be restored or mitigated according to direction from the COR.

E. Erosion Protection – The Contractor shall prepare and submit an Environmental

Protection and Storm Water Pollution Plan to the COR.

F. Traffic Control Plan – The Contractor shall submit to the COR, a traffic control plan that includes a signing plan. The Contractor shall also submit a traffic control plan to Yavapai County Engineering Department for all work that will be performed on Walker Road.

Prescott National Forest, Bradshaw Ranger District Page 5

G. Safe Drinking Water Act – Because this is a public water system and is subject to the Safe Drinking Water Act, the Contractor shall submit Plans and Specifications and pay any fees associated with plan review to ADEQ.

SECTION 2 - PROJECT ADMINISTRATION & COORDINATION

2.01 ADMINISTRATION

A. Pre-Bid Meeting - A pre-bid meeting will be held no less than two weeks prior to the bid proposal due date.

B. Kick-off Meeting. Upon receipt of a written Notice to Proceed from the Prescott Forest Service, contractor shall conduct a kick-off meeting with the Forest Service to review the scope of the project, develop a project schedule, and confirm deliverables.

SECTION 3 – TYPE OF AWARD AND BASIS FOR AWARD

3.01 AWARD TYPE

As a result of this solicitation, the Government anticipates awarding a Firm Fixed- Price Construction Contract

3.02 BASIS FOR AWARD

Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:

Factor a - Provide written documentation that specifically addresses your firm’s expertise and ability to excavate and to replace large scale water systems.

Factor b – Provide past performance of a minimum of 3 projects for which work that required factor a experience was included. Submit with references that can be contacted to verify past work successfully completed.

Factor c – Prices – Contracting Officer intends to award without discussions, provide your best price in your offer.

Failure to provide adequate information for Technically Capability may result in the offer being removed from the competitive range.

CONT030903 Lynx Lake Water System - Drawings

LYNX LAKE RECREATION AREA

WATER SYSTEM UPGRADES

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

SOUTHWESTERN REGION

R3

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

COVER SHEET

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

STOGSDILL

STOGSDILL

8/16/2018

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

T1

1 20

AutoCAD SHX Text

CONSTRUCTION PLANS

AutoCAD SHX Text

FOR

AutoCAD SHX Text

BRADSHAW RANGER DISTRICT PRESCOTT NATIONAL FOREST

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

PROJECT

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

PRESCOTT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A L T

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PRESCOTT

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

SCALE IN MILES

AutoCAD SHX Text

AutoCAD SHX Text 2.5

AutoCAD SHX Text

AutoCAD SHX Text

PRESCOTT

AutoCAD SHX Text Prescott National Forest

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

AutoCAD SHX Text p

AutoCAD SHX Text

CHINLE

AutoCAD SHX Text

TUBA CITY

AutoCAD SHX Text

HOLBROOK

AutoCAD SHX Text

SAFFORD

AutoCAD SHX Text

ROOSEVELT

AutoCAD SHX Text

PAYSON

AutoCAD SHX Text

SHOWLOW

AutoCAD SHX Text

CANYON

AutoCAD SHX Text

GRAND

AutoCAD SHX Text

KINGMAN

AutoCAD SHX Text

BLYTHE

AutoCAD SHX Text

PAGE

AutoCAD SHX Text

FLAGSTAFF

AutoCAD SHX Text

GLOBE

AutoCAD SHX Text

NOGALES

AutoCAD SHX Text

GRANDE

AutoCAD SHX Text

CASA

AutoCAD SHX Text

YUMA

AutoCAD SHX Text

MESA

AutoCAD SHX Text

PHOENIX

AutoCAD SHX Text

TUCSON

AutoCAD SHX Text

WALKER

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

VALLEY

AutoCAD SHX Text

WILLIAMSON

AutoCAD SHX Text

VALLEY RD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IRON SPRINGS RD

AutoCAD SHX Text

SENATOR

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

LYNX

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

HILLTOP

AutoCAD SHX Text

CAMPGROUND

AutoCAD SHX Text

SOUTHSHORE

AutoCAD SHX Text

DAY USE

AutoCAD SHX Text

STATE LOCATION MAP

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text DIRECTIONS TO PROJECT SITE: LYNX LAKE RECREATION AREA IS LOCATED JUST SOUTHEAST OF PRESCOTT, AZ. TRAVELING EAST FROM PRESCOTT, AZ ON AZ-69 S, CONTINUE FOR APPROXIMATELY 4 MILES. TURN RIGHT ONTO WALKER ROAD. CONTINUE ON WALKER ROAD FOR 2.4 MILES, THEN TURN LEFT INTO LYNX LAKE CAMPGROUND. YAVAPAI COUNTY LYNX LAKE CAMPGROUND ENTRANCE: 34°31'03.04"N 112°23'27.50"WLYNX LAKE CAMPGROUND ENTRANCE ELEVATION:5641 FT

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOREST ENGINEER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT MANAGER

AutoCAD SHX Text

DISTRICT RANGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

RECOMMENDED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

FOREST SUPERVISOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

I HAVE REVIEWED THE TECHNICAL ASPECTS OF THESE DRAWINGS:

AutoCAD SHX Text

INDEX TO SHEETS

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text

AutoCAD SHX Text

ESTIMATE OF QUANTITIES

AutoCAD SHX Text

AutoCAD SHX Text

ESTIMATE OF QUANTITIES

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL WORK NOTES

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN- EXISTING SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text

SITE PLAN- NEW SYSTEM

AutoCAD SHX Text

AutoCAD SHX Text

PHASE A-LYNX CAMPGROUND WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE B- STORAGE WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE C- NORTH SHORE WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE D- EAGLE RIDGE WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE E- SOUTH SHORE WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE F- HILLTOP WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

PHASE G- WALKER ROAD WORK PLAN

AutoCAD SHX Text

AutoCAD SHX Text

SEDIMENT & EROSION CONTROL DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

UTILITY TRENCH DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

VALVE DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

VALVE BOX DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

PRESSURE REDUCING VALVE AND METER DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

HYDRANT & HOSE BIBB DETAILS

AutoCAD SHX Text

AutoCAD SHX Text

WELL HEAD DETAILS

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

SOUTHWESTERN REGION

R3

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ESTIMATE OF QUANTITIES

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

STOGSDILL

STOGSDILL

8/16/2018

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

T2

2 20

AutoCAD SHX Text

BASE PAY ITEM NUMBER

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

METHOD OF MEASUREMENT

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text 11900

AutoCAD SHX Text

MOBILIZATION/DEMOBILIZATION

AutoCAD SHX Text

LSQ

AutoCAD SHX Text

LS

AutoCAD SHX Text

AutoCAD SHX Text

PHASE A- LYNX CAMPGROUND

AutoCAD SHX Text 221100-1A-2"-2"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2" & 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1A-2"-3"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2" & 3"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1A-2"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1A-1.5"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1.5"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1A-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2A

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3A-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3A-1.5"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1.5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3A-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4A

AutoCAD SHX Text

DAYLIGHT DRAIN REPLACEMENT

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-2A

AutoCAD SHX Text

AIR COMBINATION VALVE ASSEMBLY & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-3A-.5"

AutoCAD SHX Text

PRESSURE REDUCING VALVE ASSEMBLY & BOX INSTALLATION- .5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-3A-1"

AutoCAD SHX Text

PRESSURE REDUCING VALVE ASSEMBLY & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-3A-1.5"

AutoCAD SHX Text

PRESSURE REDUCING VALVE ASSEMBLY & BOX INSTALLATION- 1.5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 017320-1A

AutoCAD SHX Text WELL HOUSE DEMOLITION & REMOVAL, PITLESS ADAPTOR INSTALLATION, & WELL CAP REPLACEMENT

AutoCAD SHX Text

LSQ

AutoCAD SHX Text

LS

AutoCAD SHX Text

ALL

AutoCAD SHX Text

PHASE B- STORAGE

AutoCAD SHX Text 221100-1B-2"-3"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2" & 3" IN COMMON TRENCH

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1B-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2B

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3B-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3B-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3B-3"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 3"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4B

AutoCAD SHX Text

DAYLIGHT DRAIN REPLACEMENT

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-1B-1.5"

AutoCAD SHX Text

WATER METER ASSEMBLY & BOX REPLACEMENT- 1.5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text

BASE PAY ITEM NUMBER

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

METHOD OF MEASUREMENT

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text

PHASE C- NORTH SHORE DAY USE AREA

AutoCAD SHX Text 221100-1C-2"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1C-1.5"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1.5"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1C-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2C

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3C-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3C-1.5"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1.5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3C-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4C

AutoCAD SHX Text

DAYLIGHT DRAIN REPLACEMENT

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-1C- "58"

AutoCAD SHX Text

WATER METER ASSEMBLY & BOX INSTALLATION- " 58"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-2C

AutoCAD SHX Text

AIR COMBINATION VALVE ASSEMBLY & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text

PHASE D- EAGLE RIDGE CAMPGROUND

AutoCAD SHX Text 221100-1D-2"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1D-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2D

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3D-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3D-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4D

AutoCAD SHX Text

DAYLIGHT DRAIN REPLACEMENT

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-1D- "58"

AutoCAD SHX Text

WATER METER ASSEMBLY & BOX INSTALLATION- " 58"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-3D-.5"

AutoCAD SHX Text

PRESSURE REDUCING VALVE ASSEMBLY & BOX INSTALLATION-.5"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221105-1D

AutoCAD SHX Text

HOSE BIBB AND BACKFLOW PREVENTION ASSEMBLY REPLACEMENT

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

U

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

SOUTHWESTERN REGION

R3

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ESTIMATE OF QUANTITIES

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

STOGSDILL

STOGSDILL

8/16/2018

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

T2

3 20

AutoCAD SHX Text

BASE PAY ITEM NUMBER

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

METHOD OF MEASUREMENT

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

TOTAL

AutoCAD SHX Text

PHASE E- SOUTH SHORE DAY USE AREA

AutoCAD SHX Text 221100-1E-2"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1E-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2E

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3E-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3E-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4E

AutoCAD SHX Text

DAYLIGHT DRAIN REPLACEMENT

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221105-1E

AutoCAD SHX Text

NEW HOSE BIBB AND BACKFLOW PREVENTION ASSEMBLY INSTALLATION

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text

PHASE F- HILLTOP CAMPGROUND

AutoCAD SHX Text 221100-1F-2"

AutoCAD SHX Text

HDPE WATER LINE INSTALLATION- 2"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1F-1"

AutoCAD SHX Text

HDPE WATER LINE REPLACEMENT- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-2F

AutoCAD SHX Text

NEW WATERLINE CONNECTION TO EXISTING LINE

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3F-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3F-2"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 2"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4F

AutoCAD SHX Text

DAYLIGHT DRAIN INSTALLATION

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-1F- "58"

AutoCAD SHX Text

WATER METER ASSEMBLY & BOX INSTALLATION- " 58"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-3F-.5"

AutoCAD SHX Text

PRESSURE REDUCING VALVE ASSEMBLY & BOX INSTALLATION- .5"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221105-1F

AutoCAD SHX Text

NEW HOSE BIBB AND BACKFLOW PREVENTION ASSEMBLY INSTALLATION

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text

PHASE G- WALKER ROAD DISTRIBUTION

AutoCAD SHX Text 221100-1G-3"

AutoCAD SHX Text

HDPE WATER LINE INSTALLATION- 3"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-1G-1"

AutoCAD SHX Text

HDPE WATER LINE INSTALLATION- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

LF

AutoCAD SHX Text

AutoCAD SHX Text 221100-3G-1"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 1"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-3G-3"

AutoCAD SHX Text

CURB VALVE & BOX INSTALLATION- 3"

AutoCAD SHX Text

DQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221100-4G

AutoCAD SHX Text

DAYLIGHT DRAIN INSTALLATION

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text 221103-2G

AutoCAD SHX Text

AIR COMBINATION VALVE ASSEMBLY & BOX INSTALLATION- 1"

AutoCAD SHX Text

AQ

AutoCAD SHX Text

EA

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

U

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

SOUTHWESTERN REGION

R3

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

GENERAL WORK NOTES

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

STOGSDILL

STOGSDILL

3/24/2017

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

T2

4 20

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text

GENERAL CIVIL NOTES

AutoCAD SHX Text

1. ALL WORK SHALL BE IN ACCORDANCE WITH IPC, AWWA, NSF 14, ALL WORK SHALL BE IN ACCORDANCE WITH IPC, AWWA, NSF 14, NSF 61, AND ALL PERTINENT LOCAL REGULATIONS. 2. ALL TRENCHING SHALL CONFORM TO FEDERAL AND STATE OSHA ALL TRENCHING SHALL CONFORM TO FEDERAL AND STATE OSHA SAFETY REQUIREMENTS. 3. BACKFILL TRENCHES IN ROADS AND DRIVEWAYS WITHIN 4 BACKFILL TRENCHES IN ROADS AND DRIVEWAYS WITHIN 4 HOURS, AND ALL OTHER TRENCHES WITHIN 24 HOURS. 4. MAINTAIN ORANGE SAFETY FENCING AROUND OPEN EXCAVATIONS MAINTAIN ORANGE SAFETY FENCING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT ACTIVELY IN PROGRESS AND DURING NON-WORK HOURS. 5. WATER SYSTEMS, INCLUDING INDIVIDUAL PHASES, SHALL BE WATER SYSTEMS, INCLUDING INDIVIDUAL PHASES, SHALL BE FULLY TESTED AND FUNCTIONAL BEFORE SERVICE IS REESTABLISHED. 6. WORK SHALL BE PHASED TO LIMIT SITE WIDE SERVICE WORK SHALL BE PHASED TO LIMIT SITE WIDE SERVICE INTERRUPTION TO A MAXIMUM OF 7 CONSECUTIVE DAYS DURING LYNX CAMPGROUND AND STORAGE CONSTRUCTION. CONSTRUCTION IN OTHER AREAS SHALL BE STAGED SUCH THAT SERVICE IS AVAILABLE ELSEWHERE IN THE RECREATION AREA. INDIVIDUAL CAMPGROUND AND DAY USE AREA SERVICE INTERRUPTIONS SHALL BE LIMITED TO 14 DAYS. EXCEPTIONS TO THESE LIMITS SHALL BE APPROVED BY THE CO. AREA CLOSURES SHALL BE APPROVED BY THE CO. 7. CONDUCT ACTIVITIES SO THAT INTERFERENCE WITH THE PUBLIC CONDUCT ACTIVITIES SO THAT INTERFERENCE WITH THE PUBLIC AND/ OR GOVERNMENT PERSONNEL SHALL BE KEPT TO A MINIMUM. SCHEDULE ACTIVITIES REQUIRING SERVICE INTERRUPTION OR AREA CLOSURE WITH THE CO AT LEAST 14 DAYS IN ADVANCE. INCLUDE CLOSURES AND INTERRUPTIONS IN CONSTRUCTION SCHEDULE SUBMITTAL WITH TECHNICAL PROPOSAL. 8. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN INCLUDING A SIGN PLAN. A TEMPORARY TRAFFIC BYPASS SHALL BE PROVIDED IN THE EVENT OF ANY CLOSURE OF WALKER ROAD. MAXIMUM CONTINUOUS CLOSURE OF WALKER ROAD SHALL NOT EXCEED 3 DAYS UNLESS APPROVED BY THE CO. 9. CONTRACTOR SHALL CONTACT ARIZONA 811 OR 1-800-STAKEIT CONTRACTOR SHALL CONTACT ARIZONA 811 OR 1-800-STAKEIT FOR THE MARKING OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION. 10. DO NOT SCALE DRAWINGS. ALL MEASUREMENTS ARE IN DO NOT SCALE DRAWINGS. ALL MEASUREMENTS ARE IN IMPERIAL UNITS UNLESS OTHERWISE NOTED. 11. EXISTING CONSTRUCTION INDICATED IS BASED ON LIMITED FIELD EXISTING CONSTRUCTION INDICATED IS BASED ON LIMITED FIELD INVESTIGATIONS AND GOVERNMENT-SUPPLIED INFORMATION AVAILABLE AT TIME OF DESIGN. VERIFY ALL EXISTING CONDITIONS, INCLUDING THE ELEVATIONS OF EXISTING UTILITIES AND OTHER UNDERGROUND OBSTRUCTIONS BEFORE PURCHASING MATERIALS. NOTIFY THE CO IF ANY DISCREPANCIES ARE DISCOVERED. 12. WHEN A DETAIL IS IDENTIFIED AS "TYPICAL", APPLY DETAIL FOR WHEN A DETAIL IS IDENTIFIED AS "TYPICAL", APPLY DETAIL FOR CONSTRUCTION OF EVERY LIKE CONDITION, EVEN IF REFERENCE TO THE DETAIL IS NOT REPEATED IN EVERY INSTANCE. IN CASES OF CONFLICT BETWEEN A SPECIFICALLY REFERENCED DETAIL AND A TYPICAL DETAIL, THE SPECIFICALLY REFERENCED DETAIL SHALL GOVERN. 13. PROTECT EXISTING WORK WHICH IS TO REMAIN IN PLACE, BE PROTECT EXISTING WORK WHICH IS TO REMAIN IN PLACE, BE REUSED, OR REMAIN THE PROPERTY OF THE GOVERNMENT. 14. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY TRAFFIC CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION, IN ACCORDANCE WITH APPROVED, CONTRACTOR-PREPARED TRAFFIC CONTROL PLAN. 15. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION. CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA. IN NO CASE SHALL CONSTRUCTION OPERATIONS EXTEND BEYOND LIMITS OF CONSTRUCTION INDICATED WITHOUT PRIOR APPROVAL BY THE CO. 16. CONDUCT ALL OPERATIONS IN ACCORDANCE WITH APPROVED, CONDUCT ALL OPERATIONS IN ACCORDANCE WITH APPROVED, CONTRACTOR-PREPARED ENVIRONMENTAL PROTECTION AND STORM WATER POLLUTION PLANS. 17. EXISTING WATERLINE TO BE REPLACED IN ITS CURRENT EXISTING WATERLINE TO BE REPLACED IN ITS CURRENT LOCATION SHALL BE REMOVED AND DISPOSED OF OFFSITE. EXISTING WATERLINE WHERE THE NEW WATERLINE WILL BE RELOCATED SHALL BE ABANDONED IN PLACE IN ACCORDANCE WITH ADEQ STANDARD. 18. MARKER POSTS SHALL BE INSTALLED EVERY 100 FT ALONG MARKER POSTS SHALL BE INSTALLED EVERY 100 FT ALONG THE NEW WATERLINES, AT ALL VALVES LOCATED IN UNIMPROVED OR UNPAVED AREAS, JUNCTIONS, AND AT LOCATIONS OF BLIND FLANGES INSTALLED FOR FUTURE CONNECTION. POSTS SHALL BE SET IN A SAFE AND REASONABLY CONSPICUOUS LOCATION. MARKER POST SHALL BE 42" PORTABLE TRAFFIC DELINEATOR POST WITH TWO REFLECTOR STRIPS. THEY SHALL BE FURNISHED NEW AND UNUSED AND BURIED 24" DEEP, TO LEAVE 18" EXPOSED AS A MARKER POST. 2" HIGH LETTERING SHALL BE STENCILED ON THE POST WITH BLACK ENAMEL PAINT INDICATING VALVE OR BLIND FLANGE AND THE OFFSET DISTANCE. 19. CONTRACTOR SHALL POTHOLE ALL TIE-IN, PIPE CROSSINGS, CONTRACTOR SHALL POTHOLE ALL TIE-IN, PIPE CROSSINGS, AND POTENTIAL CONFLICT LOCATIONS BEFORE PIPE INSTALLATION. 20. ALL HDPE FITTINGS SHALL BE BUTT FUSION TYPE. ALL ALL HDPE FITTINGS SHALL BE BUTT FUSION TYPE. ALL TRANSITIONS SHALL BE HDPE BUTT FUSION TO STEEL NPT THREAD. 21. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING REDLINE THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING REDLINE "AS-BUILT" DRAWINGS DURING CONSTRUCTION. THE REDLINE DRAWINGS SHALL NOTE THE POSITION OF THE NEW WATERLINE WITH RESPECT TO EXISTING STRUCTURES; THE DEPTH OF THE NEW WATERLINE; LOCATIONS OF ALL NEW VALVES, BLOW-OFFS, METERS, FIRE HYDRANTS, AND OTHER WATER LINE APPURTENANCES; LOCATION OF ALL UTILITIES ENCOUNTERED DURING THE INSTALLATION OF THE NEW WATER LINE; LOCATIONS OF ABANDONED WATER LINES; LOCATIONS OF ANY CONTAMINATED SOILS; AND ALL OTHER STRUCTURES ENCOUNTERED DURING CONSTRUCTION. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL SUBMIT THE REDLINE DRAWINGS TO THE CO. 22. FROST DEPTH IS 18". MINIMUM PIPE BURY DEPTH SHALL BE FROST DEPTH IS 18". MINIMUM PIPE BURY DEPTH SHALL BE 24". 23. ALL WATERLINE SHALL SLOPE 2% TO DRAIN. AIR RELEASE ALL WATERLINE SHALL SLOPE 2% TO DRAIN. AIR RELEASE VALVES AND DAYLIGHT DRAINS SHALL BE INSTALLED AT HIGH AND LOW POINTS INCIDENTAL TO WATERLINE CONSTRUCTION.

AutoCAD SHX Text

PROJECT DESCRIPTION

THIS PROJECT ADDRESSES DEFICIENCIES IN THE EXISTING WATER SYSTEM AT LYNX LAKE. SUPPLY AND DISTRIBUTION WATERLINE WILL BE REPLACED ALONG WITH ALL ISOLATION, AIR RELEASE, AND PRESSURE REDUCING VALVES. WATER METERS AND SYSTEM DRAINS WILL BE REPLACED. IN SOME CASES IDENTIFIED IN THE PLANS, HOSE BIBBS WILL BE REPLACED OR ADDED. OTHERWISE, EXISTING HYDRANTS, HOSE BIBBS AND SERVICE CONNECTIONS WILL BE TIED INTO. WELL HEAD ACCESSORIES WILL BE ADDED AND THE EXISTING WELL HOUSE WILL BE DEMOLISHED. NO WORK WILL OCCUR ON THE STORAGE TANK, PUMP, OR TREATMENT SYSTEM. IT IS ANTICIPATED THAT EXISTING DISTRIBUTION PIPING WILL BE PVC.

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

SOUTH WESTERN REGION

R3

SITE PLAN- EXISTING SYSTEM

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

C1

5 20

AutoCAD SHX Text M3

AutoCAD SHX Text

DAM

AutoCAD SHX Text

WALKER ROAD

AutoCAD SHX Text M1

AutoCAD SHX Text M2

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 0'

AutoCAD SHX Text 100'

AutoCAD SHX Text 200'

AutoCAD SHX Text 300'

AutoCAD SHX Text 400'

AutoCAD SHX Text 500'

AutoCAD SHX Text

AR

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Forest

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text Project No:

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text 8/17/2018

AutoCAD SHX Text SYMBOL DESCRIPTION DESCRIPTION DRAIN, D CAMPGROUND HYDRANT, H PRESSURE REDUCING VALVE, P FLUSH TOILET, FT DRINKING FOUNTAIN, DF HOSE BIB, HB CHECK VALVE SHUT-OFF VALVE- NORMALLY OPEN SHUT-OFF VALVE- NORMALLY CLOSED GATE VALVE AIR COMBINATION VALVE WATER METER, M

AutoCAD SHX Text

AR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

HB5

AutoCAD SHX Text H18

AutoCAD SHX Text H17

AutoCAD SHX Text D12

AutoCAD SHX Text D11

AutoCAD SHX Text H16

AutoCAD SHX Text D9

AutoCAD SHX Text H15

AutoCAD SHX Text D10

AutoCAD SHX Text H14

AutoCAD SHX Text H13

AutoCAD SHX Text

LOOP A

AutoCAD SHX Text

LOOP B

AutoCAD SHX Text

LOOP C

AutoCAD SHX Text

HILLTOP CAMPGROUND

AutoCAD SHX Text

HB8

AutoCAD SHX Text H21

AutoCAD SHX Text H20

AutoCAD SHX Text H19

AutoCAD SHX Text

HB7

AutoCAD SHX Text D7

AutoCAD SHX Text

OSPREY

AutoCAD SHX Text

PEREGRINE

AutoCAD SHX Text

EAGLE RIDGE CAMPGROUND

AutoCAD SHX Text

SOUTH SHORE BOATING SITE

AutoCAD SHX Text

LYNX CAMPGROUND

AutoCAD SHX Text

NORTH SHORE VISTA POINT

AutoCAD SHX Text

LOOP A

AutoCAD SHX Text

LOOP B

AutoCAD SHX Text

LOOP D

AutoCAD SHX Text

LOOP C

AutoCAD SHX Text

LOOP E

AutoCAD SHX Text

LOOP F

AutoCAD SHX Text

LOOP G

AutoCAD SHX Text

LOOP H

AutoCAD SHX Text D8

AutoCAD SHX Text H11

AutoCAD SHX Text

DF3

AutoCAD SHX Text H10

AutoCAD SHX Text D5

AutoCAD SHX Text D6

AutoCAD SHX Text

EF

AutoCAD SHX Text P1

AutoCAD SHX Text H1

AutoCAD SHX Text H3

AutoCAD SHX Text H2

AutoCAD SHX Text P2

AutoCAD SHX Text H4

AutoCAD SHX Text D1

AutoCAD SHX Text

FT1

AutoCAD SHX Text H5

AutoCAD SHX Text

HB1

AutoCAD SHX Text H6

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text

HB2

AutoCAD SHX Text H7

AutoCAD SHX Text H8

AutoCAD SHX Text P5

AutoCAD SHX Text

HB3

AutoCAD SHX Text P5

AutoCAD SHX Text M3

AutoCAD SHX Text

DF2

AutoCAD SHX Text H9

AutoCAD SHX Text P6

AutoCAD SHX Text

DF1

AutoCAD SHX Text D4

AutoCAD SHX Text D3

AutoCAD SHX Text

HB4

AutoCAD SHX Text

FT2

AutoCAD SHX Text

FT3

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

WATER STORAGE TANK

AutoCAD SHX Text

WELL HOUSE

AutoCAD SHX Text

CONTROL HOUSE

AutoCAD SHX Text

MARINA STORE AND RESIDENCE

AutoCAD SHX Text

TO WALKER

AutoCAD SHX Text

TO PRESCOTT HWY. 69

AutoCAD SHX Text

LYNX LAKE

AutoCAD SHX Text

*SEE HISTORICAL SITE PLAN FOR APPROXIMATE LOCATIONS OF BURIED ELECTRICAL LINES.

M2

SOUTH WESTERN REGION

R3

SITE PLAN- NEW SYSTEM

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

C1

6 20

AutoCAD SHX Text M2

AutoCAD SHX Text

DAM

AutoCAD SHX Text M1

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 100'

AutoCAD SHX Text 200'

AutoCAD SHX Text 300'

AutoCAD SHX Text 400'

AutoCAD SHX Text 500'

AutoCAD SHX Text

AR

AutoCAD SHX Text M3

AutoCAD SHX Text M4

AutoCAD SHX Text M5

AutoCAD SHX Text M6

AutoCAD SHX Text

AR

AutoCAD SHX Text

AR

AutoCAD SHX Text

AR

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Forest

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text Project No:

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text 8/17/2018

AutoCAD SHX Text SYMBOL DESCRIPTION DESCRIPTION DRAIN, D CAMPGROUND HYDRANT, H PRESSURE REDUCING VALVE, P FLUSH TOILET, FT DRINKING FOUNTAIN, DF HOSE BIBB, HB CHECK VALVE CURB VALVE- NORMALLY OPEN CURB VALVE- NORMALLY CLOSED AIR RELEASE VALVE WATER METER, M

AutoCAD SHX Text

AR

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

HB5

AutoCAD SHX Text H18

AutoCAD SHX Text H17

AutoCAD SHX Text D12

AutoCAD SHX Text D11

AutoCAD SHX Text H16

AutoCAD SHX Text D9

AutoCAD SHX Text H15

AutoCAD SHX Text D13

AutoCAD SHX Text H14

AutoCAD SHX Text H13

AutoCAD SHX Text

LOOP A

AutoCAD SHX Text

LOOP B

AutoCAD SHX Text

LOOP C

AutoCAD SHX Text

PHASE F HILLTOP CAMPGROUND

AutoCAD SHX Text

HB8

AutoCAD SHX Text H21

AutoCAD SHX Text H20

AutoCAD SHX Text H19

AutoCAD SHX Text

HB7

AutoCAD SHX Text D9

AutoCAD SHX Text

OSPREY

AutoCAD SHX Text

PEREGRINE

AutoCAD SHX Text

PHASE D EAGLE RIDGE CAMPGROUND

AutoCAD SHX Text

PHASE A LYNX CAMPGROUND

AutoCAD SHX Text

PHASE C NORTH SHORE VISTA POINT

AutoCAD SHX Text

LOOP A

AutoCAD SHX Text

LOOP B

AutoCAD SHX Text

LOOP D

AutoCAD SHX Text

LOOP C

AutoCAD SHX Text

LOOP E

AutoCAD SHX Text

LOOP F

AutoCAD SHX Text

LOOP G

AutoCAD SHX Text

LOOP H

AutoCAD SHX Text D10

AutoCAD SHX Text

HB9

AutoCAD SHX Text

DF3

AutoCAD SHX Text

HB10

AutoCAD SHX Text D4

AutoCAD SHX Text

EF

AutoCAD SHX Text P1

AutoCAD SHX Text H1

AutoCAD SHX Text H3

AutoCAD SHX Text H2

AutoCAD SHX Text P8

AutoCAD SHX Text H4

AutoCAD SHX Text D1

AutoCAD SHX Text

FT1

AutoCAD SHX Text H5

AutoCAD SHX Text

HB1

AutoCAD SHX Text H6

AutoCAD SHX Text P3

AutoCAD SHX Text P4

AutoCAD SHX Text

HB2

AutoCAD SHX Text H7

AutoCAD SHX Text H8

AutoCAD SHX Text P5

AutoCAD SHX Text

HB3

AutoCAD SHX Text M2

AutoCAD SHX Text

DF2

AutoCAD SHX Text H9

AutoCAD SHX Text P6

AutoCAD SHX Text

DF1

AutoCAD SHX Text D7

AutoCAD SHX Text

HB4

AutoCAD SHX Text

FT2

AutoCAD SHX Text

FT3

AutoCAD SHX Text

PHASE E SOUTH SHORE BOATING SITE

AutoCAD SHX Text

LYNX LAKE

AutoCAD SHX Text

FENCE

AutoCAD SHX Text

WATER STORAGE TANK

AutoCAD SHX Text

WELL HOUSE

AutoCAD SHX Text

CONTROL HOUSE

AutoCAD SHX Text

MARINA STORE AND RESIDENCE

AutoCAD SHX Text

TO WALKER

AutoCAD SHX Text

TO PRESCOTT HWY. 69

AutoCAD SHX Text

PHASE B STORAGE

AutoCAD SHX Text

PHASE G ROAD SIDE DISTRIBUTION

AutoCAD SHX Text

WALKER ROAD

AutoCAD SHX Text M1

AutoCAD SHX Text M3

AutoCAD SHX Text M4

AutoCAD SHX Text M5

AutoCAD SHX Text M6

AutoCAD SHX Text P2

AutoCAD SHX Text P7

AutoCAD SHX Text M1

AutoCAD SHX Text P9

AutoCAD SHX Text P10

AutoCAD SHX Text P11

AutoCAD SHX Text D2

AutoCAD SHX Text D3

AutoCAD SHX Text D5

AutoCAD SHX Text D6

AutoCAD SHX Text D8

AutoCAD SHX Text D14

AutoCAD SHX Text D15

AutoCAD SHX Text

AR2

AutoCAD SHX Text

AR1

AutoCAD SHX Text

AR3

AR4

SOUTH WESTERN REGION

R3

PHASE A- LYNX CAMPGROUND WORK PLAN

LYNX LAKE RECREATION AREA WATER SYSTEM UPGRADES

PRESCOTT NATIONAL FOREST

BRADSHAW RANGER DISTRICT

C2

7 20

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 2"

AutoCAD SHX Text 1.5"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1"

AutoCAD SHX Text 1.5"

AutoCAD SHX Text

AR

AutoCAD SHX Text 2"

AutoCAD SHX Text

AutoCAD SHX Text Checked:

AutoCAD SHX Text Design:

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text Forest

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn:

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text Sub Sheet:

AutoCAD SHX Text Sheet

AutoCAD SHX Text

OF

AutoCAD SHX Text Project No:

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text

STOGSDILL

AutoCAD SHX Text 8/17/2018

AutoCAD SHX Text

LOOP D

AutoCAD SHX Text

LOOP A

AutoCAD SHX Text

LOOP B

AutoCAD SHX Text

LOOP C

AutoCAD SHX Text

LOOP E

AutoCAD SHX Text

LOOP F

AutoCAD SHX Text

LOOP H

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .