A.1_Drawings.pdf
PDF 2 MB Posted
- Attached to
- Two Island River Culvert and Road Work Federal contract opportunity
- Solicitation number
- 1263A918R0009
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1263A918R0009.pdf | ||
| A.2_Wage_rate.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) http://www.novapdf.com
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) http://www.novapdf.com
Begin Lake County 7 New Size New Length
(span x rise) (ft.)
0.04 21" x 15" 30
0.176 18" 24
0.31 21" x 15" 24
0.34 21" x 15" 24
0.57 21" x 15" 24
0.72 24" 28
0.89 21" x 15" 26
1.05 21" x 15" 26
1.28 21" x 15" 28
1.29 21" x 15" 26
1.39 21" x 15" 24
1.545 24" 32
1.66 21" x 15" 26
1.8 21" x 15" 30
1.99 24" 26
2.27 24" x 18" 30
2.38 28" x 20" 26
2.49 21" 28
2.556 28" x 20" 28
2.83 17" x 13" 26
3.07 30" 28
3.27 71" x 42" 34
4.12 28" x 20" 44
4.19 17" x 13" 26
4.438 21" x 15" 28
4.464 21" x 15" 28
5.178 21" x 15" 28
5.187 21" x 15" 34
Culvert Schedule
MP from Lake County
7 TASK
Ditch Reconditioning
(Clean Ditch) Ditch Excavation
Const/Recon Ditch Embankment
Borrow 3" minus Select
Granular (LV) Additional Crushed
(LV) Replace Culvert Remove Rock Riprap COMMENTS reference 0.000 Lake County 7
0.040 Install new CMP across FR 1210 30 21"x15"x30' Install new CMP across FR 1210 - Caution!! POWER!!
0.050 Clean ditch 150' left, 500' rt 650
.1-.17 Construct 300' ditch RT 300 create 2:1 backslope
0.176 Remove existing/Install new culvert 18"x24'
.2-.3 Const 100' rt/Clean 400' ditch right 400 100
0.310 Remove existing/Install new culvert 30 21"x15"x24'
0.340 Install new CMP 30 21"x15"x24'
.30-.43
0.460 Tower Road 20 Place aggregate on side entrance
0.570 Install new CMP 200 30 21"x15"x24' There is an old plastic 8" pipe here now - Ditch 100' Each way from cmp
0.590 Disposal site for debris Dispose of materials and shape both left and right to close old roads
0.720 Remove existing/Install new culvert 24"x28'
0.74-.79 Const 625' ditch rt/ clean 625' left 625 625 First 125' on right remove marterial to daylight, remainder construct ditch with 2:1 backslope
0.840 Clean ditch left 150
0.890 Remove existing/Install new culvert 40 21"x15"x26' Lower existing ditch block so it doesn't shoot water onto road. Additional agg for cover
0.9-1.1 Clean 500' ditch left 500 500 100 Add an additional 6" (500 cy) of 3" select granular below 6" crushed to raise road
1.050 Remove existing/Install new culvert 21"x15"x26'
1.1-1.2 Clean 500' ditch left/100' right 600
1.250 Construct 300' ditch RT 150 300 150 Construct ditch right. Place 12" total crushed down hill
1.280 Install new CMP 40 21"x15"x28' Skewed
1.290 Remove existing/Install new culvert 20 21"x15"x26' Existing=17"x13"x26'
1.340 Clean 150' right 150
1.390 Remove existing/Install new culvert 800 30 21"x15"x24' Clean ditch both sides 200' each way from cmp
1.45-1.65 Clean ditch right 950'/Constr 150' ditch right 950 150 10
1.545 Remove existing/Install new culvert 40 24"x32' 2 Skew pipe, riprap outlet
Reference 1.570 Power Box left
1.660 Remove existing/Install new culvert 21"x15"x26'
1.69-1.77 Clean ditch 1000' both sides 2000
1.760 Remove rock in west bound lane 1
reference 1.800 FR 342 Two Island River Road 200 21"x15"x30' reference 1.850 Two Island River Culvert
1.900 Clean ditch both sides 220
1.990 Remove existing/Install new culvert 24"x26' Bury new pipe 8" below stream bottom.
2.070 Remove rock in west bound lane 1
2.21-2.27 Remove Rock 5
2.270 Remove existing/Install new culvert 30 18"x24"x30'
2.38-2.42 Clean ditch both sides 700 30 28"x20"x26' reference 2.450 FR 341
2.490 Remove existing/Install new culvert 21"x28' Depress pipe 6" below stream bottom.
2.510 Clean 200' Rt 200
2.556 Remove existing/Install new culvert 28"x20"x28' Provide additioanl material for 2:1 slopes over ends.
2.590 Construct 120' ditch Rt/Flatten backslope 200' left and clean 320 Power line exists along north side of road.
2.670 Clean ditch both sides 500' 600
2.728 Remove rocks from north ditchline 2
2.725-2.8 Construct ditch right 400
2.830 Additional gravel over CMP 70 17"x13"x26' Additional agg to provide 12"
2.900 Contsruct 55' ditch right 55
2.916 Clean ditch both sides 250
2.930 Construct 80' right 80
Reference 2.950 FR 1855 - Power Box Left Power box on left at 1855 intersection but appears power jumps to south side heading east.
2.964 Clean ditch both sides 500
2.985 Remove rock west bound lane 1
3.070 Remove existing/Install new culvert 60 30"x28' Depress min 6" below stream bottom. Additional crushed for 12" total lift over culvert. Taper each way.
3.100 Clean ditch both sides 200'/ Construct 375' Rigth/ C 400 575
3.270 Remove existing and install new AOP 60 71"x42"x34' 6 Depress at least 15" below stream bottom reference 3.750 Cross River Bridge
3.860 Clean 150' Right 150
4.060 Clean 150' Right 150
reference 4.110 FR 346 (Richey Lake Rd) 200 Spread 200 cy on FR346
4.120 Remove existing/Install new culvert 20"x28"x44'
4.190 Remove existing/Install new culvert 17"x13"x26'
4.26-4.336 1000 Raise grade on sag of slope approx. 5' and taper each way
4.320 Clean ditch 250'both sides 500
4.366 Raise grade west of hill to raise sight distance 400 Raise grade on sag of slope east of hill crest approx. 2' over 300'and taper each way
4.438 Remove existing/Install new culvert 21"x15"x28' Depress 6" below existing cmp.
4.464 Install new CMP 21"x15"x28' Depress 6" below wetland bottom.
Reference 4.668 Side Entrance Left
4.710 Remove dead snag and stump right and ditch thru 200
4.782 Remove dead snag and stump right and ditch thru 50
4.96-4.99 Remove Rocks 3
5.130 Remove Rocks 2
5.178 Remove existing/Install new culvert 21"x15"x28'
Reference 5.187 FR 343 (Temperance River Road) 300 250 21"x15"x34' Spread crushed on FR 343, clean ditch around intersection and each side of culvert
5.380 3-6" Lift of gravel and ditch clean left 400
5.570 perched pipe could use V wier if valuable
5.610 Ditch clean right 500
Reference 6.050 Heartbreak bridge
6.520 Clean ditch 150' rt 150
6.570 Clean 125" both sides 250
6.600 Clean 200' rt 200
Reference 6.970 FR 344 7.98-8.24 6" lift
9.920 Ditch clean 350' each side 700
600 Road (FR 166) Worklist
0 100 miles
EASTERN REGION
US Department of Agriculture Forest Service
Approved: Forest Engineer
PROJECT
LOCATION
Region Nine
NICOLET
Ironwood
WHITE MOUNTAIN
GREEN MOUNTAIN
WAYNE
MONONGAHELA
ALLEGHENY
MANISTEE
HURON
HIAWATHA
OTTAWA
CHEQUAMEGON
SUPERIOR
CHIPPEWA
HOOSIER
SHAWNEE
MARK TWAIN
FINGER LAKES
MILWAUKEE
Washington D.C.
Laconia
Rutland
L
O
N
G
I
S
L
A
N
D
Dover
Annapolis
Baltimore
St. Louis
Escanaba
Warren
Elkins
Bedford
Harrisburg
Rolla
Cadillac
Rhinelander
Park Falls
Duluth
Cass Lake
Charleston
Cleveland
Pittsburgh
Harrisburg
Philadelphia
Trenton
Hartford
Providence
Boston
Portland
Augusta
Concord
Montpelier
Albany
Buffalo
Detroit
Lansing
Toledo
Columbus
Cincinnati
Indianapolis
Springfield
Chicago
Minneapolis
St. Paul
Madison
Des Moines
Kansas City
Jefferson City
L A
K E
O N
T A
R
IO
L
A
K
E
R
I
E
L
A
K
E
H
U
R
O
N
L A
K E S
U P
E
R
I
O
R
N
A
G
I
H
C
I
M
E
K
A L
N
A
G
I
H
C
I
M
N E
W
J E
R S
E Y
N
A
E
C
O
C
I
T
N
A
L
T
A
VIRGINIA
HAMPSHIRE
NEW
M
A
R
Y
L
A
N
D
D E
L A
W A
R E
RICONNECTICUT
MASSACHUSETTS
VERMONT
MAINE
NEW YORK
PENNSYLVANIA
WEST
OHIO
INDIANA
ILLINOIS
WISCONSIN
MINNESOTA
IOWA
MISSOURI
Date
Date
Superior National Forest - Tofte Ranger District
COOK COUNTY
T59N, R05W, S07
Two Island River Crossing FR 166 [mp. 1.90]
Approved: District Ranger
Reviewed: Forest Supervisor Date
SHEET SHEET TITLE
1 TITLE
2 ROAD PLAN & PROFILE
3 STREAM PLAN & PROFILE
4 CULVERT VIEWS
5 ROAD CROSS SECTIONS (1)
6 ROAD CROSS SECTIONS (2)
7 ROAD CROSS SECTIONS (3)
F I N
I S
H E
D
E
L E
V
E l e v a t i o n
10+00
10+50
11+00
11+50
12+00
12+50
13+00
13+50
14+00
14+50
14+97.35
-0.60%
-1 .9
E X
I S
T I N
G
E
L E
V
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
1"=40'
Patrick Hampston
Road Plan & Profile
2 7
Civil Engineer
Vertical Exageration =5
REMOVE EXISTING 47"X71"X42' CULVERT
INSTALL
14'-5" SPAN X 3'-3" RISE X 45' LONG
OPEN BOTTOM BOX CULVERT
ON CIP CONCRETE FOOTINGS
EXISTING ROAD CL
REMOVE EXISTING 47"X71"X42' CULVERT.
DISPOSE OF OFF FS PROPERTY.
INSTALL 14'-5" SPAN X 3'-3" RISE X 45' LONG
OPEN BOTTOM BOX CULVERT ON CIP
CONCRETE FOOTINGS
PLACE 4" TOPSOIL AND SOD ON
DISTURBED ROAD SLOPES
AFTER BACKFILL. SEED, FERTILIZE,
AND MULCH REMAINING DISTURBED
AREAS.
FINISHED ROAD CL
TOF=1550.87'
BOF=1545.87'
BM 10" POPLAR
ELEV=1553.91'
STREAMBED SIMULATION MATERIAL 705.07
Call
GOPHER
STATE ONE
1-800-252-1166
UNDERGROUND ELECTRIC
(APPROXIMATE LOCATION)
F
R
FR 166
l e v a t i o n
30+00
30+50
31+00
31+50
31+92.58
-1 .2
F I N
I S
H E
D
E
L E
V
E X
E
L E
V
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
1"=20'
Patrick Hampston
Stream Plan & Profile
3 7
Civil Engineer
Vertical Exageration =5
EXISTING
STREAMBED CL
RECONSTRUCT STREAMBED
FROM EXISTING ELEV AT STA 30+65
AT 1.27% SLOPE THROUGH CULVERT
TO EXISTING ELEV AT STA 31+43.
RECONSTRUCTION CONSISTS OF
FILLING SCOUR POOLS AT CULVERT
ENDS, PLACING STREAMBED MATERIAL
THROUGH CULVERT, AND TIEING INTO
EXISTING STREAMBED.
ROAD SECTION
PROPOSED
BOX CULVERT
PROPOSED STREAMBED CL
PLACE CLASS 4 SLOPE PROTECTION
RIPRAP (7.5 CY EACH CORNER)
OVER TYPE IV-B GEOTEXTILE
BEGIN STREAM
RECONSTRUCTION
AT STA 30+65
END STREAMBED
RECONSTRUCTION
AT STA 31+43
INSTALL SILT CURTAIN
DOWNSTREAM
PACK 6" LAYER OF CLAYEY
MATERIAL AROUND INLET TO
PREVENT PIPING ALONG
CULVERT EDGES
DRAINAGE AREA: 2.72 SQ. MI.
100YR FLOW: 165 CFS
BANKFULL WIDTH ~ 10'
BM 10" POPLAR
ELEV=1553.91'
Existing Road Elev: 1554.42'Culvert shall support min. 1'-4" and max 4'-0" cover
Geotechnical Evaluation Report available upon request.
Planned HL-93 aluminum (Contech) or structural steel (Supercor) open bottom box culvert set on contractor designed cast in place concrete footings.
100 yr flood = 1553.15'
Normal WS=1550.42'
Approx stream bottom = 1550.12'
Constructed bottom inside pipe shall be well graded. Shape to replicate existing stream above/below structure.
Too much large rock causes subsurface flow while too much fines erodes. 18-22 large boulders (3'-4' diam) shall be incorporated to match existing with some partially buried depth and some buried depth.
Stream banks shall be constructed inside structure using 12-36" size material with all voids filled and packed with smaller materials. Banks shall be approximately 2' wide and shall taper into natural banks on each end of pipe.
Finished Road Elev: 1556.09'
C
L
2% CROWN
Notes: Installation will follow FP03 specifications.
No work permitted in stream between Sept. 15th and June 15th
Prior to construction install siltation float curtain downstream to trap and settle siltation during construction. Upon project completion the curtain shall be carefully removed to limit accumulated silt from being deposited in stream.
Dewatering and earth coffer dam shall be used. Minimize stream sedimentation by separating disturbed soil and any stockpiles from live water with silt fencing per Best Management Practices for Erosion and Sediment Control (FHWA). All silt fence shall be removed after grasses have been established. If flows are high, contractor may be required to install pumps or diversions.
Downstream flows shall be maintained at all times. Only clean, filtered water may be discharged downstream.
Compact backfill by mechanical means as required by the manufacturer of the structure. Final construction methodology must be approved by the engineer.
Contractor responsible for proper road closure signage complying with Manual on Uniform Traffic Control Devices. Detour signs shall be installed with Engineer approval.
Field verify all elevations. Final horizontal location to be determined and approved in the field.
Existing culverts shall become the property of the contractor and removed from FS property.
Excess excavation shall be used to cover culvert corners or flatten roadway slopes. If materials remains it shall be disposed of in a Forest Service gravel pit at the direction of the CO.
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
NTS
Patrick Hampston
Culvert Views
4 7
Civil Engineer
6" CRUSHED AGG. SURFACING, GRADING P
FINAL ELEV. 1556.09'
EX. ELEV. 1554.42'
CROSS-SECTION OF PROPOSED CULVERT
Not to Scale
14'-5" SPAN (MIN.) X 3'-3" RISE (MIN.) X 45' LONG ALUMINUM OR STEEL BOX CULVERT
SET ON CONTRACTOR DESIGNED CIP CONCRETE FOOTINGS (BY LICENSED MN PE)
12" (MIN.) BED OF 1" MINUS WASHED STONE UNDER
CULVERT WRAPPED IN TYPE II GEOTEXTILE
1.27% SLOPE
BACKFILL MATERIAL PER MANUFACTURER SPECS
ESTIMATED QUANTIES:
ROAD EMBANKMENT: 265 CY
CRUSHED AGG. SURFACING: 120 CY
STREAMBED SIMULATION ROCK: 125 CY
CLASS IV RIPRAP: 30 CY
SOD: 100 SY
TOPSOIL: 12CY
APPROX. TOP OF BANKS
APPROX. STREAM CL
1'
2'
STREAMBED
SIMULATION
ROCK 705.07
BED CLASS 10
NOT TO SCALE
18.00'
STREAM CL ELEV=1550.12'
STREAM CL ELEV=1549.55'
BANK ELEV=1550.55'
BANK ELEV=1551.12'
STREAM CL ELEV=1549.87'
BANK ELEV=1550.87'
PLACE 4" TOPSOIL AND SOD ON
DISTURBED ROAD SLOPES
AFTER BACKFILL. SEED, FERTILIZE,
AND MULCH REMAINING DISTURBED
AREAS.
TOF ELEV=1550.87'
BOF ELEV=1545.87'
BOTTOM OF EXCAVATION
ELEV=1544.87'
TOF ELEV=1550.87'
BOF ELEV=1545.87'
14'-5"
3'-3"
INLET END SHOWN
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
1"=20'
Patrick Hampston
Road Cross Sections (1)
5 7
Civil Engineer
EXISTING CL ELEV. FINISHED CL ELEV.
FINISHED ROAD
SECTION
EXISTING ROAD
SECTION
6" CRUSHED AGG. SURFACING,
GRADING P
18' TYP.
Vertical Exageration =5
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
1"=20'
Patrick Hampston
Road Cross Sections (2)
6 7
Civil Engineer
EXISTING CL ELEV. FINISHED CL ELEV.
Designer
Plotter Scale
Date
CAD Archive No.
Checked
Drawn
Drawing Sheet No.
Project No.
Project Name
Drawing Title
Sheet of
REGION NINE
Two Island River Crossing Superior National Forest
Tofte Ranger District
Patrick Hampston
John Olson
5/8/16
1"=20'
Patrick Hampston
Road Cross Sections (3)
7 7
Civil Engineer
EXISTING CL ELEV. FINISHED CL ELEV.
| Cover Page .pdf |
| Typ Cross Section.pdf |
| Typ Ditch.pdf |
| Drawings.pdf |
| FR 170 Typ.Culvert |
| FR 170 Typ.Riprap |
| 873 2ISL TOPO_working.pdf |
| Culvert Schedule.pdf |
| Culverts |
| 166 worklist.pdf |
| Work List |
File details come from the government source that posted it.