Questions and Answers.pdf
PDF 65 KB Posted
- Attached to
- Trailer Demolition Federal contract opportunity
- Solicitation number
- 12639524Q0250
About this file
This document contains Questions and Answers related to Solicitation 12639524Q0250 for the USDA/APHIS Trailer Demolition project. The key details are:
The U.S. Department of Agriculture, Animal and Plant Health Inspection Service, has a trailer at the National Centers for Animal Health (NCAH) Campus in Ames, Iowa that needs to be demolished and removed. The solicitation is for the demolition and removal of the existing trailer structure, including the concrete pad, excavating water and sanitary sewer lines, capping any active lines, removing and disposing of abandoned lines, and repairing the grounds.
The questions and answers address aspects of the project such as availability of site visit attendance sheets, presence of active utilities, and whether asbestos or lead-based paint testing and remediation is required (it is not). The contractor is responsible for providing a temporary toilet facility. No additional details about pricing, set-asides, or award dates are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work (SOW).pdf | ||
| Attachment 2 - Trailer Demolition Drawings.pdf | ||
| Attachment 3 - General Decision Number IA20240074 07-19-2024.pdf | ||
| 12639524Q0250.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation 12639524Q0250
USDA/APHIS Trailer Demolition
Questions Received by August 16th, 2024, at 5:00 PM CT
Question 1: Are the Site Visit attendance sheets from both Site Visits available to view?
Answer 1: No, site visit attendance sheets will not be available to view.
Question 2: Is there any active utilities such as water, gas, or electrical connected to the trailer?
Answer 2: No, active utilities are not connected to the trailer.
Question 3: Is there any asbestos or lead based paint in the trailer?
Answer 3: No, there is not asbestos or lead based paint in the trailer.
Question 4: Is there onsite restrooms the contractor can use?
Answer 4: Refer to Statement of Work (SOW) section 8. Temporary Facilities C. which states, “Toilet Facilities: A temporary toilet facility must be provided by the Contractor. Service of the toilet facility must be the responsibility of the Contractor.”
Question 5: I'm just trying to get some clarification for whether or not asbestos testing and remediation would be required for the trailer demolition.
Answer 5: No, asbestos testing and remediation is not required.