Q and A from South Campus PRV replacement site visit_5_4_2023.docx
DOCX document 16 KB Posted
- Attached to
- Replace pressure relief valve, Ames Federal contract opportunity
- Solicitation number
- 12639523Q0136
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign In Sheet_5_4_2023.pdf | ||
| Atch 2_Federal construction wage rates_Story County.pdf | ||
| Atch 1_Drawings_South Campus PRV replacement.pdf | ||
| 12639523Q0136.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from South Campus PRV replacement site visit: 5/4/2023 Solicitation: 12639523Q0136
Question #1: Does USDA want a ductile iron valve or carbon steel? The documents say both.
Answer #1: The new 12” PRV shall be ductile iron per the CLA-VAL spec provided in the SOW under section 1.4.1 “Pressure Reducing Control Valves”. The new 12” butterfly valves can be carbon steel.
Question #2: Is there any flexibility on the 4-hour water outage?
Answer #2: If the awarded contractor can isolate the 12” PRV from the bypass around the valve and use the bypass to provide water to the south campus during the work to replace the PRV, then the water outage should not be an issue. The 4-hour outage window is for a sustained outage. We cannot have a sustained outage for more than 4 hours.
Question #3: Does the USDA know the location of the city of Ames water supply shut off before the vault where the 12” PRV is located?
Answer #3: No. Awarded contractor will need to contact the city of Ames and work with them to shut off the water supply to south campus. USDA staff will only operate valves on USDA property.