Questions and answers.docx
DOCX document 16 KB Posted
- Attached to
- Demo and Replace Flooring, Phoenix Rearing Facility Federal contract opportunity
- Solicitation number
- 12639521R0022
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12639521R0022-0002.pdf | ||
| 12639521R0022-0001.pdf | ||
| Floor pictures 2.pdf | ||
| Floor pictures 3.pdf | ||
| Floor pictures 1.pdf | ||
| Questions and answers.docx | DOCX document | |
| DOL wage rates.pdf | ||
| 12639521R0022.pdf | ||
| Floor plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A for floor repair Phoenix rearing facility Solicitation 12639521R0022
1. What are work hour and days for this project?
Weekdays from 5:30 AM to 2:30 PM. The same for weekends if requested. Work hours beyond times may be approved if requested in advance.
2. The SOW states to install cove base, does this refer to 4” rubber cove base? Also, what is the linear footage of to be installed?
Cove base will be Grey 6” rubber cove base. Rough estimate is between 6,500 – 7,000 feet of cove base.
3. On the areas receiving epoxy, is there a minimum specification for the new system to be installed? How many coat systems is wanted (standard is 3)?
No specification; three coats.
4. Is non-skid aggregate wanted in new epoxy floor/new polished floor?
No aggregate, a gloss finish is preferred.
5. Is there a minimum specification for the areas receiving the polished floor?
No specification.
6. In the areas that don’t have VCT what flooring is currently in place?
Epoxy.
7. Can all the work areas be completed simultaneously or will phasing be necessary?
Work will be phased.
8. Will there be an area to place a dumpster?
Yes
9. Will there be an area to store materials and equipment?
Yes
10. Will there be any equipment or furniture to be moved? If so, who is responsible for moving it?
Contractor to provide labor. Nothing will be moved in the mechanical room. Shelves will remain in place in the diet warehouse, middle warehouse, and tool room. Walk in cooler in diet warehouse will remain in place.
11. VCT is existing and needs to be removed, then floor polish and epoxy covering installed?
No epoxy on removed VCT areas, just prep and polish floor.
12. Is there storage for removed items?
Warehouse or other areas in the building will be used.
13. What about bathrooms, any floors with ceramic coverings?
Restrooms aren’t included in this project.
14. Am I required to provide my own power?
Yes
15. There’s yellow striping around some of the equipment in the shop area. Is that to be restriped?
Yes