12639521R0022-0001.pdf

PDF 409 KB Posted

Attached to
Demo and Replace Flooring, Phoenix Rearing Facility Federal contract opportunity
Solicitation number
12639521R0022
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services

View the file

Other files for this federal contract opportunity

Other files attached to Demo and Replace Flooring, Phoenix Rearing Facility, newest first.
File Type Posted
12639521R0022-0002.pdf PDF
Questions and answers.docx DOCX document
Floor pictures 2.pdf PDF
Floor pictures 3.pdf PDF
Floor pictures 1.pdf PDF
Questions and answers.docx DOCX document
DOL wage rates.pdf PDF
12639521R0022.pdf PDF
Floor plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12639521R0022 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

APHIS-MN-126395

06/30/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

USDA APHIS

250 MARQUETTE AVE

SUITE 410

MINNEAPOLIS MN 55401

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/01/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Tax ID Number: Not Available

DUNS Number: Not Available

This amendment is written to incorporate into the solicitation a more specific scope of work. Replace page 4 with the attached replacement page. The due date for receipt of proposals is now July 8 at noon Central Time.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JAMES G. ROLOFF

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

06/30/2021

Solicitation 12639521R0022--Demo, Replace Flooring, Phoenix Rearing Facility Amendment 0001 6/30/21

STATEMENT OF WORK

1.0 Location: Phoenix Rearing Facility, 3645 E Chipman Rd, Phoenix, Arizona

2.0 Description: Please refer to the floor plans (attachment 2) which depict the individual work areas outlined in red. Work includes:

2.1 North and South hallways and connecting corridor: replace epoxy coating and install new cove base.

2.2 Areas 3, 4, and 5: demo VCT, polish bare concrete and wax, install new cove base.

2.3 Area 6A—break room and office: demo VCT, polish concrete and wax, install new cove base. Pupae weight room: replace epoxy coating, install new cove base.

2.4 Area 6B—repair floor, polish concrete and wax, install new cove base.

2.5 Diet warehouse and middle warehouse: replace epoxy coating, install new cove base.

2.6 Diet warehouse office: demo VCT, polish concrete and wax, install new cove base.

2.7 Maintenance shop: replace epoxy coating, install new cove base.

2.8 Mechanical, boiler, and shipping rooms: replace epoxy coating, install new cove base.

2.9 Shipping room office: demo VCT, polish concrete and wax, install new cove base.

3.0 Scope of Work to Remove Existing Coating

3.1 30 grit demo grind to remove existing coating

3.2 Patch all cracks, joints, and spalls with epoxy cabosil mixture

3.3 Detail grind as needed

3.4 Apply KR – 520 primer coat (KR = Key Resin, or equal)

3.5 Apply KR – 520 body coat

3.6 Apply KR – 625 top coat

* Approximately 30 mil system

4.0 Scope of Work to Polish Concrete

4.1 30 grit grind to expose salt and pepper aggregate

4.2 Patch all holes, divots, and cracks with cementitious mortar

4.3 Fill joints with flexible epoxy

4.4 80 grit grind to remove excess patch and residue

4.5 100 transitional pass

4.6 Apply Diamatic penetrating sealer system

4.7 200 grit resin pass to hone concrete

4.8 400 grit polish pass

4.9 Apply Diamatic guard

4.10 High speed burnish for shine

CLAUSES

Clauses in Full Text

52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)

(a) Definitions. As used in this clause--

Amendment 0001.pdf
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)
52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016)
2021-06-30T08:01:14-0500
JAMES ROLOFF

File details come from the government source that posted it. Updated .