Building 402 transformer replacement - Drawings.pdf

PDF 1 MB Posted

Attached to
402 Transformer Replacement/refeed Federal contract opportunity
Solicitation number
12619720b0003
Issued by
Department of Agriculture Animal and Plant Health Inspection Service Veterinary Services

View the file

Other files for this federal contract opportunity

Other files attached to 402 Transformer Replacement/refeed, newest first.
File Type Posted
A00008.pdf PDF
A00008.docx DOCX document
q and a.docx DOCX document
A00007.pdf PDF
E10-RFI-Map.pdf PDF
E10-RFI.pdf PDF
Electrical One-Line Diagram from 2015 project.pdf PDF
Duct Bank Details.pdf PDF
A00006.pdf PDF
A00005.pdf PDF
A00004.pdf PDF
A00003.pdf PDF
A00002.pdf PDF
A00001.pdf PDF
Building 402 transformer replacement - Site Photos.pdf PDF
wages.pdf PDF
SOW-2020 Building 402 Utility Reroute.docx DOCX document
12619720b0003.docx DOCX document
SF 1442 (1).pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOB NO. REV.

DRAWING NO.

SCALE

DRAWN

CHECKED

APPROVED

DATE

CADD FILE

PLOT SCALE

THIS DRAWING IS THE PROPERTY OF BROWN ENGINEERING

COMPANY. IT WAS PREPARED FOR USE ON THE DESIGNATED

PROJECT. IT SHALL NOT BE USED IN WHOLE OR IN PART

ON ANY OTHER PROJECT OR IN ANY WAY THAT MAY BE

INJURIOUS TO BROWN ENGINEERING COMPANY.

DES MOINES, IOWA

ELECTRICAL RISER

DIAGRAM

2013121 0

E10

AS INDCIATED

BMM

WDC

WDC

08-01-14

2013121

USDA BLDG 400

UTILITY

REROUTE

1 ELECTRICAL RISER DIAGRAM

NO SCALE

REV DATE CHANGE DWN

C 2015 BROWN ENGINEERING COMPANY

CHK APP

BMM07-13-151 WDC WDCAS-RECORD

Brandon.Keith Callout Remove existing 13th Street feed from 402 transformer and reroute to switchgear through MH-402

Brandon.Keith Callout install new Main feed to Switchgear through MH-402

Brandon.Keith Line

Brandon.Keith Callout Reroute feed to new 402 transformer through MH-402 from switchgear

E6

MANHOLE INSTALLATION DETAIL

NO SCALE

MINIMUM 6" IDOT CLASS A

CRUSHED STONE COMPACTED

TO 95% MODIFIED PROCTOR

WITH 2% WATER CONTENT.

6"

6"

PRECAST OR CAST-IN-PLACE

CONCRETE SLAB WITH #4 BARS

@ 6" CENTERS EACH WAY

18"x18"x4"

SUMP PIT

6' -0

" M

IN

IM

U

M

6"

3'-0"

2-HIGH DUCT BANK

(2x2, 4x2 OR 8x2)

PULLING IRONS, ONE

ON EACH WALL

BUSHING (TYP)

1-HIGH DUCT BANK

(2x1, 4x1 OR 8x1)

NEENAH R-1740

MAHOLE FRAME &

SOLID LID IMPRINTED

WITH "ELECTRICAL"

" M

IN

IM

U M

PRECAST OR CAST-IN-PLACE CONCRETE

TOP WITH CENTERED 36" ROUND OPENING.

#4 BARS @ 6" CENTERS EACH WAY. #4 BARS

AROUND TOP AND BOTTOM OF OPENING

(ALL 4 SIDES)

COMPACTED EARTH

FILL. MACHINE TAMP

IN MAXIMUM 6" LIFTS

7'-8"

NOTES:

1. CONCRETE STRENGTH: 4000

PSI @ 28 DAYS

2. REINFORCING: HS-20 BRIDGE

LOADING

6'-0"

8 PER

MANHOLE

JOB NO. REV.

DRAWING NO.

SCALE

DRAWN

CHECKED

APPROVED

DATE

CADD FILE

PLOT SCALE

THIS DRAWING IS THE PROPERTY OF BROWN ENGINEERING

COMPANY. IT WAS PREPARED FOR USE ON THE DESIGNATED

PROJECT. IT SHALL NOT BE USED IN WHOLE OR IN PART

ON ANY OTHER PROJECT OR IN ANY WAY THAT MAY BE

INJURIOUS TO BROWN ENGINEERING COMPANY.

DES MOINES, IOWA DETAILS

2013121 0

E6

AS INDCIATED

BMM

WDC

WDC

08-01-14

2013121

USDA BLDG 400

UTILITY

REROUTE

E6

CONCRETE ENCASED CONDUIT SECTION DETAILS FOR 15kV FEEDER

NO SCALE

E6

MANHOLE MH-402 CONDUIT PENETRATION DETAIL

NO SCALE

REV DATE CHANGE DWN

C 2015 BROWN ENGINEERING COMPANY

CHK APP

BMM07-13-151 WDC WDCAS-RECORD

Brandon.Keith

Building 402

Brandon.Keith Line

Brandon.Keith Oval

Brandon.Keith Line

Brandon.Keith Line

Brandon.Keith Callout

MH-402

Brandon.Keith Callout Existing Switchgear

Brandon.Keith

13th Street Feeder

Switchgear

Brandon.Keith Callout 402 transformer

Brandon.Keith Callout Building 402

Brandon.Keith Callout MH-402 Location

Brandon.Keith

13th Street Feed

Buildings B1 and B2 are gone. Connect 402 feed to this switch

Line

TRANSFORMER PAD DETAIL

NO SCALE

Brandon.Keith Callout 2" cast iron pipe with self closing gate valve.

Brandon.Keith Oval

Brandon.Keith

Contractor shall be responsible for containment basin size based on the size of the new 500 kVA transformer and liquid contained within.

Electrical Riser Diagram from Bldg 400 reroute
Manhole details
Overall Site Plan
Satellite of 13th St. feed to 402-Locations
Switchgear Electrical One Line
Transformer Details

File details come from the government source that posted it. Updated .