Final_Specifications.pdf
PDF 552 KB Posted
- Attached to
- Building 402 Structural Improvements Federal contract opportunity
- Solicitation number
- 12619719B0004
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0003SF30.pdf | ||
| Pre-Bid_Site_Visit_Questions__2_from_8-23-2019.doc | DOC document | |
| A0002SF30.pdf | ||
| A0001SF30.pdf | ||
| 12619719B0004.docx | DOCX document | |
| SOW_Structural_Improvements_Bldg._402_and_Bldg._20_7-31-2019.docx | DOCX document | |
| SACONST-01.pdf | ||
| General_Decision_Number.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
STRUCTURAL IMPROVEMENTS
(VARIOUS LOCATIONS)
USDA NATIONAL ANIMAL DISEASE CENTER
AMES, IOWA
Contract Task Number AG-32SC-D-17-0282 Contract Number AG-32SD-C-15-0045
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
May 11, 2018
TABLE OF CONTENTS Page 1
USDA, NATIONAL CENTERS FOR ANIMAL HEALTH
TITLE: STRUCTURAL IMPROVEMENTS (VARIOUS LOCATIONS)
USDA, NATIONAL CENTERS FOR ANIMAL HEALTH
AMES, IOWA
CONTRACT NO. AG-32SC-D-17-0282
TABLE OF CONTENTS
Section Number Paragraph Title
DIVISION 01 GENERAL REQUIREMENTS
01 00 01 Warranty of Construction 01 00 21 Contractor Quality Control 01 01 00 General Requirements 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 50 00 Project Closeout 01 57 50 Temporary Environmental Controls
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition and Deconstruction
DIVISION 03 CONCRETE
03 30 53 Miscellaneous Cast-In-Place Concrete
DIVISION 05 METALS
05 12 00 Structural Steel 05 50 13 Miscellaneous Metal Fabrications 05 50 14 Structural Aluminum Fabrications 05 51 33 Metal Ladders 05 52 00 Metal Railings
-- End of Table of Contents --
STRUCTURAL IMPROVEMENTS CONTRACT NO. AG-32SC-D-17-0282
SECTION 01 00 01 Page 1
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government. In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturers’, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer’s Representative, the Contractor shall require any such warranties to be executed in writing to the Government.
SECTION 01 00 01 Page 2
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.
-- End of Section --
SECTION 01 00 21 Page 1
SECTION 01 00 21
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 GENERAL
This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements. The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance procedures and requirements detailed on the plans and specifications.
1.1.1 Certificate of Compliance
Upon completion of the contract work and prior to final acceptance, the Contractor shall submit to the Contracting Officer’s Representative a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations. The certificates of compliance shall be signed and dated by both the manufacturer’s representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one year warranty period as defined in SECTION 01 00 01, WARRANTY OF CONSTRUCTION.
1.2 INSPECTION
The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS,
MATERIALS, FIXTURES, AND EQUIPMENT
1.3.1 Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed.
The top copy of data comprising each item listed on the transmittal form shall be identified as having received the quality control inspector's approval by being so
SECTION 01 00 21 Page 2 stamped, signed and dated. Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer’s Representative will not relieve the Contractor of the responsibility for any errors which may exist and the Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the work for jobsite use until all work has been accepted by the Contracting Officer’s Representative. The Contractor shall provide four (4) sets of all shop drawings.
1.3.2 All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.
1.4 DAILY RECORDS
The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format.
These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered; problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer’s Representative on a daily basis, legible copies of all inspection records for his permanent retention. The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.
1.5 RECURRING DEFICIENCIES
If recurring deficiencies in an item or items being inspected by the Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer’s Representative.
1.6 CONFLICTS
In the event of a difference of opinion between the Contractor and the Contracting Officer’s Representative, the Contracting Officer’s Representative shall govern.
SECTION 01 01 00 Page 1
Section 01 01 00
GENERAL REQUIREMENTS
1.1 WORK RESTRICTIONS AND CONDITIONS
A. Site Security Access
1. Access to the construction site is controlled by a security fence and visitor/contractor check-in/check-out system. All contractor/subcontractor employees shall sign-in and out at the entrance gate and wear a contractor/visitor identification badge at all times while on the site. The ID badges will be turned in at the end of the work day. A current government-issued identification with a picture ID is required for entry.
2. The Contractor shall use only the service roads and access routes approved by the Contracting Officer.
3. Work shall be confined to Buildings and Rooms described in the scope of work.
Unless accompanied by a NCAH/USDA employee, the Contractor, subcontractors, and their employees shall not enter buildings or facilities not specifically part of this project. Reasons included, but are not limited to, disease control and health requirements.
4. Additional security requirements may be imposed when the Federal Government raises the Homeland Security Alert Level. Additional directions will be provided if the situation occurs.
5. Failure to comply with access requirements shall be adequate grounds for removal of the Contractor/subcontractor employees from the site and barring further site access to individuals.
6. No “tailgating” of USDA employees through secure entrances is allowed.
7. No animals/pets are allowed to be brought on the site regardless of whether left in a vehicle in the parking lot or not.
B. Work Hours: Regular work hours for the site are 7:00am to 6:00pm, Monday through Friday, excluding Federal holidays.
C. Work Outside Regular Work Hours: To facilitate completion of service work that would not require an additional full day of activities, extension of time before and after normal working hours will be considered upon a 2-week advance written request from the Contractor.
1.2 QUALITY CONTROL REQUIREMENTS
A. COR shall inspect the completed work for approval with the contractor prior to considering the work to be complete.
1.3 TEMPORARY FACILITIES
A. Utilities: The existing USDA utilities at the site may be used by the Contractor for completion of the contract work at no cost to the Contractor. The Contractor shall be responsible for making and removing any utility connections.
SECTION 01 01 00 Page 2
B. Telephones: The Contractor shall equip all his foremen and work leaders with cell phones as necessary to coordinate the work effort. The Government will not provide any phone service to the project.
C. Toilet Facilities: The Contractor is allowed to use Public Toilet Facilities within the nearest public toilet facility where contracted work is actively performed inside that building envelope. Where work is indicated outside the building envelope, the Contractor shall provide temporary facilities..
D. Smoking is only allowed in the outdoor smoking building located at the northwest corner of Building 20.
1.4 PROJECT SCHEDULING AND PHASING
Prepare for approval a Project Schedule, as specified herein. Prior to preparing the work schedule and sequencing, the contractor shall meet and coordinate all phasing with the USDA’s Contracting Officer’s Representative (and USDA staff) to coordinate operational limits, time limits and restrictions. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool.
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. SHOP DRAWINGS
The Contractor shall furnish the Contracting Officer’s Representative six copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer’s Representative approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work comes in contact with or interferes with that of another subcontractor.
1.1 The Contracting Officer’s Representative approval, however, shall not relieve the
Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer’s Representative; the Drawings and Specifications shall always be final.
2. SAMPLES
Within and not later than thirty (30) days from the date of the General Contract, the General Contractor shall have secured and submitted to the Contracting Officer’s Representative for his consideration, two samples minimum (or as noted on the plans) of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer’s Representative will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer’s Representative. All approvals will be given by the Contracting Officer’s Representative to the General Contractor in writing.
2.1 It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for Contractor's negligence in late ordering of materials.
3. PRODUCT DATA
Submit six copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer’s descriptive literature, catalog data, and other data to illustrate portion of work.
SECTION 01 33 00 Page 2
4. GOVERNMENT ACTIONS POSSIBLE
Provide all submittals with the enclosed “Material Approval Submittal” for tracking and records.
Submittals will be returned to the Contractor with one of the following notations:
a. Submittals marked “approved” or “approved as submitted” authorize
Contractor to proceed with work covered.
b. Submittals marked “approved as noted” or “approval except as noted;
resubmission not required” authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.
c. Submittals marked “revise and resubmit” or “disapproved” indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
6. SUBMITTAL REGISTER
Contractor shall submit items as listed in individual specification sections.
MATERIAL APPROVAL SUBMITTAL
TO: USDA/ARS CO
CC: A&E, COR
FROM: (Contractor) PROJECT TITLE: CONTRACT NUMBER:
(To be completed by the Contractor) Government Use Only
SUBMITTAL
NUMBER:
PREVIOUS SUBMITTAL NUMBER
(only if items listed were submitted previously):
A&E Recommendation
COR/EPM
Recommendation
Contracting Officer Approval/Disapproval
Line No.
Specification Sect.
Para No., Draw No.
Description of Material
(Include type, model, mfg)
APP
DISAP
See
Comments on Reverse
Comments on Reverse
Comments on Reverse
If an item is disapproved, a resubmittal is due within ________ calendar days of the Contracting Officer’s signature below.
Contractor (Ktr) A&E COR/EPM Contracting Officer TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE
SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:
DATE: DATE: DATE: DATE:
By completing this form, the above signed contractor certifies that the material complies with all specifications of the subject contract.
DATE RECEIVED FROM KTR: DATE RECEIVED FROM A&E: DATE RECEIVED FROM COR:
Material Approval Submittal Cover Sheet (11/2016)
CONTRACT #: SUBMITTAL #:
COMMENTS
Instructions: Enter the initials of the individual making the comment, the Line Number of the item for which the comment is being made, and the comment.
Material Approval Submittal Cover Sheet (11/2016) (Reverse)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.2.1 GDeconstruction Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
Receipts
03 30 53 SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Accelerating Admixture
2.2.3.3Water-Reducing or Retarding
Admixture
2.2.9Curing Materials
3.2Conveying and Placing Concrete
2.2.7Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.1Curing Compound
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
03 30 53 3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
2.2.1CPG
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.1Curing Compound
05 12 00 SD-02 Shop Drawings
1.4.1 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
05 12 00 1.3AISC Fabrication Plant Quality
Certification
1.3AISC Erector Quality Certification
1.4.2.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 50 13 SD-02 Shop Drawings
2.3 GFloor Gratings
2.4 GHatches
SD-03 Product Data
2.1.2Gratings
3.9Guards
2.4 GHatches
05 50 14 SD-02 Shop Drawings
1.3.1 GDetail Drawings
SD-07 Certificates
1.3.2Welding Qualifications
2.1.2.1Welding of Aluminum
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
05 52 00 SD-02 Shop Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.1.2 GProtective Coating
2.2.2 GSteel Railings and Handrails
2.1Concrete Inserts
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization, (e.g. ASTM B564 Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL
HYGIENISTS (ACGIH)
1330 Kemper Meadow Drive Cincinnati, OH 45240 Ph: 513-742-2020 or 513-742-6163 Fax: 513-742-3355 E-mail: mail@acgih.org Internet: http://www.acgih.org
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
1800 East Oakton Street Des Plaines, IL 60018-2187 Ph: 847-699-2929 Fax: 847-768-3434 E-mail: customerservice@asse.org Internet: http://www.asse.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 610-832-9585 http://www.acgih.org/ http://www.asse.org/
SECTION 01 42 00 Page 2
Fax: 610-832-9555 E-mail: service@astm.org Internet: http://www.astm.org
MASTER PAINTERS INSTITUTE (MPI)
2800 Engleton Avenue Burnaby, BC CANADA V5C 6G7 Ph: 604-298-7578 Fax: 604-298-7571 E-mail: info@paintinfo.com,jody@mpi.net,bgl@mpi.net Internet: http://www.paintinfo.com/mpi
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
1300 North 17th Street, Suite 1752 Rosslyn, VA 22209 Ph: 703-841-3200 Fax: 703-841-5900 Internet: http://www.nema.org/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 or 800-344-3555 Fax: 617-770-0700 E-mail: webmaster@nfpa.org Internet: http://www.nfpa.org
UNDERWRITERS LABORATORIES (UL)
2600 N.W. Lake Road Camas, WA 98607-8542 Ph: 877-854-3577 Fax: 360-817-6278 E-mail: CEC.us@us.ul.com Internet: http://www.ul.com/ UL Directories available through IHS at http://www.ihs.com
U.S. ARMY CORPS OF ENGINEERS (USACE)
Order CRD-C DOCUMENTS from:
U.S. Army Engineer Waterways Experiment Station ATTN: Technical Report Distribution Section, Services Branch, TIC 3909 Halls Ferry Road Vicksburg, MS 39180-6199 E-mail: MTC-INFO@erdc.usace.army.mil Internet: http://gsl.erdc.usace.army.mil/SL/MTC/handbook/handbook.htm Order Other Documents from:
http://www.astm.org/ http://www.paintinfo.com/mpi http://www.nema.org/ http://www.nfpa.org/ http://www.ul.com/ http://www.ihs.com/ http://gsl.erdc.usace.army.mil/SL/MTC/handbook/handbook.htm
SECTION 01 42 00 Page 3
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.usace.army.mil/publications or http://www.hnd.usace.army.mil/techinfo/engpubs.htm
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration 1800 F Street, NW Washington, DC 20405 Ph: 202-501-0800 Internet: www.GSA.gov Obtain documents from:
Acquisition Streamlining and Standardization Information System (ASSIST) Department of Defense Single Stock Point (DODSSP) Document Automation and Production Service (DAPS) Building 4/D 700 Robbins Avenue Philadelphia, PA 19111-5094 Ph: 215-697-6396 - for account/password issues Internet: http://assist.daps.dla.mil/online/start/; account registration required
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 Fax: 301-837-0483 E-mail: contactcenter@gpo.gov Internet: http://www.archives.gov Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 732 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov http://www.usace.army.mil/publications http://www.hnd.usace.army.mil/techinfo/engpubs.htm http://www.gsa.gov/ http://assist.daps.dla.mil/online/start http://www.archives.gov/ http://www.gpoaccess.gov/
SECTION 01 42 00 Page 4
AMERICAN CONCRETE INSTITUTE (ACI)
38800 Country Club Dr.
Farmington Hills, MI 48331-3439 concrete.org phone: 248-848-3800
MANUFACTURERS STANDARDIZATION SOCIETY (MSS)
127 Park St. NE Vienna, VA 22180-4602 msshq.org Phone: 703-281-6613
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
Two Park Avenue New York, NY 10016-5990 asme.org Phone: 800-843-2763
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used
SECTION 01 50 00 Page 1
SECTION 01 50 00
PROJECT CLOSEOUT
PART 1 GENERAL
1.1 AS-BUILT DRAWINGS
At the completion of the project, the Contracting Officer’s Representative will furnish the Contractor, free of charge, one set of Auto Cad drawings on which the Contractor will indicate all variations in locations, construction, equipment, etc. from that shown on the original Drawings. The Contractor shall furnish redline (marked up plans) drawings indicating where variations from the original designs exists. Provide three
(3) color hard copies and one (1) digital copy to the Contracting Officer’s Representative.
1.2 SUBSTANTIAL COMPLETION AND COMPLETION OF PUNCH LIST
CORRECTIONS
Set date and notify Contracting Officer’s Representative as to time construction will be ready for preliminary punch list and, upon completion of that list, set time and date for inspection of punch list corrections. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Contracting Officer’s Representative on the basis of an inspection, determines that the Work or designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so that the Owner or separate contractors can occupy or utilize the Work or designated portion thereof for the use for which it is intended, he will prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall complete the items listed therein or attached thereto. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.
1.3 FINAL INSPECTION
The Contractor shall notify the Contracting Officer’s Representative and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer’s Representative and Contractor at a mutually agreed upon time. If the project is complete, in the opinion of the Contracting Officer’s Representative, the Contracting Officer’s Representative shall issue a certificate as set forth hereinafter. Minor unfinished items of work may be excluded from the certificate. The Contracting Officer’s Representative and
SECTION 01 50 00 Page 2
Contractor shall mutually agree on a date for the completion of these items of work.
Should the Contractor fail to complete the work within the agreed time, the Owner shall have the option of having the unfinished work completed.
1.4 RELEASE OF LIENS AND CERTIFICATION ALL BILLS ARE PAID
The Contractor, before final acceptance is given by the Contracting Officer’s
Representative, shall furnish for himself and all sub-contractors, in triplicate, duly certified by a notary, a full release of liens, damages, and a guarantee that all materials and labor are paid in accordance with the Contractual Documents.
1.5 GUARANTEE
The Contractor, before final acceptance by the Contracting Officer’s Representative, shall furnish the Owner, in triplicate, a written notarized guarantee. All Contractors shall guarantee their work for a period of one year from the date of Substantial Completion as stated by the Contracting Officer’s Representative. Neither the final Certificate for Payment, nor any provision in the Contract Documents shall relieve the contractors of their responsibility for negligence or defective materials or workmanship within the extent and period covered by law; and upon written notice he shall remedy any defects due thereto, and pay all expenses for any damages to other work resulting therefrom. Emergency defective workmanship and defective materials within the year's guarantee shall be corrected within a few days after receipt of a written order from the Contracting Officer’s Representative. Any items that are not considered of an emergency nature by the Contracting Officer’s Representative may be corrected prior to the expiration of the Guarantee period.
1.5.1 The wording for the Guarantee shall be as follows:
"We hereby guarantee all work performed by us on the above captioned project to be free from defective materials and workmanship for a period of one year, or for such longer period of time as may be called for in the Contractual Documents for such portions of the work."
1.6 OTHER FINAL DOCUMENTS
Deliver to the Owner, through the Contracting Officer’s Representative, all required bonds, warranties, individual guarantees, etc. that are required by the various following sections of these specifications.
1.7 ACCEPTANCE
Upon satisfactory submittal of the above documents the Contracting Officer’s
Representative shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and exempted from final acceptance. A sum sufficient to cover the cost of completing
SECTION 01 50 00 Page 3 these unfinished items of work will be withheld by the Owner from the final payment.
All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer’s Representative certificate. Upon certification by the Contracting Officer’s Representative that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.
SECTION 01 57 50 Page 1
SECTION 01 57 50
TEMPORARY ENVIRONMENTAL CONTROLS
1.1 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced.
The publications are referred to in the text by the basic designation only.
ENVIRONMENTAL PROTECTION AGENCY (EPA)
40 CFR 112 Regulations on Oil Pollution Prevention
40 CFR 261 Regulations Identifying Hazardous Waste
40 CFR 262 Regulations for Hazardous Waste Generators
40 CFR 263 Regulations for Hazardous Waste Transporters
40 CFR 264 Regulations for Owners and Operators of Permitted
Hazardous Waste Facilities
40 CFR 403 General Pretreatment Standards
PL 96 510 Comprehensive Environmental Response Compensation and Liability Act of 1980
DEPARTMENT OF TRANSPORTATION (DOT)
49 CFR 171 Standards for Transportation of Hazardous Materials
49 CFR 172 Hazardous Materials Tables and Regulations
49 CFR 178 Regulations for Shipping Container Specifications
1.2 DEFINITIONS
1.2.1 Sediment
Soil and other debris that has eroded and has been transported by runoff water or wind.
1.2.2 Solid Waste
SECTION 01 57 50 Page 2
Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled, "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.2.3 Rubbish
Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
1.2.4 Debris
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.
1.2.5 Chemical Waste
This includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
1.2.6 Sanitary Wastes
1.2.6.1 Sewage
Waste characterized as domestic sanitary sewage.
1.2.6.2 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2.7 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
1.2.8 Oily Waste
Petroleum products and bituminous materials.
1.2.9 Landscape Features
Trees, plants, shrubs and ground covers.
1.2.10 Hazardous Substances
As defined in EPA PL 96-510.
SECTION 01 57 50 Page 3
1.2.11 Hazardous Materials
As defined in DOT Regulation 49 CFR 171 and listed in 49 CFR 172.
1.3 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances and noise pollution.
PART 2 EXECUTION
2.1 NATURAL RESOURCES
Contractor is responsible for obtaining all required SWPPP permitting and maintaining site to all required SWPPP standards, and performing any and all required SWPPP inspections to meet local and government SWPPP standards and codes.
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
2.1.1 Landscape Features
Do not remove, cut, deface, injure, or destroy existing landscape features without the Contracting Officer’s Representative's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages, unless authorized by the Contracting Officer’s Representative. Where such use of attach ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.
2.1.1.1 Protection
Protect existing landscape features which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. By approved excavation, remove trees with 30 percent or more of their root systems destroyed.
2.1.1.2 Replacement
SECTION 01 57 50 Page 4
Remove existing landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged features. Obtain the Contracting Officer’s Representative's approval before replacement.
2.1.2 Water Resources
2.1.2.1 Oily and Hazardous Substances
Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Take precautions to ensure that no oil or other hazardous material is released to the water, land, sanitary sewer system, or storm sewer system. Environmental requirements for the prevention of oil spills are contained in 40 CFR 112. For oil and hazardous substance spills which may be large enough to violate Federal, State or Local Regulations, the Contracting Officer’s Representative shall be verbally notified immediately. Clean up any spills of oil or hazardous substances which result from the Contractor's operations. If the Contractor can not clean up any spill in a timely manner, the Government will perform the cleanup at the Contractor's expense.
2.1.3 Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.
2.2 HISTORICAL AND ARCHEOLOGICAL RESOURCES
Carefully preserve and report immediately to the Contracting Officer’s Representative items having possible historical or archeological interest which are discovered in the course of work. Protect monuments, markers, and works of art.
2.3 EROSION AND SEDIMENT CONTROL
2.3.1 Burnoff
Burnoff of the ground cover is prohibited.
2.3.2 Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified.
Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.
2.3.3 Temporary Protection of Erodible Soils
SECTION 01 57 50 Page 5
Provide the following methods to prevent erosion and control sedimentation.
2.3.3.1 Mechanical Retardation and Control of Runoff
Mechanically retard and control the rate of runoff from the construction site. Provide diversion ditches, benches, and berms to retard and divert runoff to protected drainage courses.
2.3.3.2 Seeding
Provide seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to establish or re-establish a suitable stand of grass.
2.4 SOLID AND SANITARY WASTES
Pick up solid wastes, and place in containers which are regularly emptied. Prevent contamination of the site and other areas when handling and disposing wastes. On completion, leave the areas clean. Control and dispose of wastes.
2.4.1 Disposal of Solid Wastes
Dispose of solid wastes in accordance with the requirements specified.
2.4.1.1 Removal From Government Property
Remove solid wastes from Government property.
2.4.2 Garbage Disposal
Place garbage in approved containers, and move to a pickup point or disposal area, where directed.
2.4.3 Sewage, Odor, and Pest Control
Dispose of sewage through connection to a municipal or district sanitary sewage system, where such a system is not available, use chemical toilets. Empty wastes into a municipal, district, or station sanitary sewage system. Provide pest control and elimination of odors. No substances shall be disposed of which will interfere with treatment plant operations in accordance with 40 CFR 403.
2.5 HAZARDOUS WASTES
2.5.1 General
Handle generated hazardous wastes in accordance with 40 CFR 262. Store hazardous waste in approved containers in accordance with 49 CFR 178. Label to
SECTION 01 57 50 Page 6 identify the type of waste and the date the container was filled. Remove the containers from the project site, and store and dispose of hazardous waste in accordance with 40 CFR 263 and 264. For hazardous wastes spills, verbally notify the Contracting Officer’s Representative immediately.
2.5.2 Petroleum Products
Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation. Dispose of lubricants and excess oils.
2.6 DUST
Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars.
2.7 ABRASIVE BLASTING
Provide tarpaulin drop cloths and windscreens to enclose abrasive blasting operations to confine and collect dust, abrasive agent, paint chips, and other debris.
Dispose of abrasive blasting debris.
2.8 NOISE
Make the maximum use of low-noise emission products, as certified by the EPA.
Blasting or use of explosives will not be permitted without written permission from the Contracting Officer’s Representative, and then only during the designated times.
2.9 FOOD
Preparation, cooking and dispensing of food products will not be permitted.
2.10 TEMPORARY CONSTRUCTION
Remove temporary construction facilities including haul roads, work areas, structures, foundations of temporary structures, and stockpiles of excess or waste materials.
Grade temporary roads, parking areas, and temporarily used areas to conform with surrounding contours.
SECTION 02 41 00 Page 1
SECTION 02 41 00
DEMOLITION AND DECONSTRUCTION
The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition
Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and Deconstruction Plan and submit proposed demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be Removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with EM 385-1-
1. Plan shall be approved by Contracting Officer's Representative prior to work beginning.
SECTION 02 41 00 Page 2
1.2.2 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer's Representative. The work of this section is to be performed in a manner that maximizes the value derived from the salvage and recycling of materials.
Remove rubbish and debris; do not allow accumulations inside or outside the building.
The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer's Representative. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer's Representative. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded.
Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer's Representative prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas.
Remove dust, dirt, and debris from work areas daily. Any damage to existing facilities, utilities, construction or finishes to remain due to construction activity shall be reconstructed by the Contractor to match existing construction and finish.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
SECTION 02 41 00 Page 3
1.3.3 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations.
1.3.4 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer's Representative. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 AVAILABILITY OF WORK AREAS
Per the requirements indicated in the design drawings. Any work required outside the noted limits indicated on the design drawings is to be coordinated with the Contracting Officer's Representative one week prior to commencing.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G Deconstruction Plan; G Existing Conditions
SD-07 Certificates
Notification; G
SD-11 Closeout Submittals
Receipts
SECTION 02 41 00 Page 4
Note: The Contractor shall provide a transmittal sheet for each submittal.
Transmittal sheet to be provided by the Government prior to the pre-construction meeting.
1.6 QUALITY ASSURANCE
Submit timely notification of demolition, deconstruction and renovation projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the Contracting Officer's Representative in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.6.1 Dust and Debris Control
Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and sweep the work area weekly and as often as necessary to control the spread of dust and debris. Provide all dust control barriers required to prevent the spread of dust and provide hard walled dust barrier.
Provide sealed and latching personnel doors where required for access.
1.7 PROTECTION
1.7.1 Protection of Personnel
Before, during and after the demolition and deconstruction work continuously evaluate the condition of the structure being demolished and deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.