RFI1.docx
DOCX document 13 KB Posted
- Attached to
- Replace Glazing System at Plant Science Research Unit (PSRU) Federal contract opportunity
- Solicitation number
- 12505B22R0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI1.docx | DOCX document | |
| 12505B22R0004_Amd0001.pdf | ||
| 12505B22R0004.pdf | ||
| ARS-372.pdf | ||
| Davis-Bacon Act WD MN20220125.pdf | ||
| ARS-371.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requests for Information Solicitation 12505B21R0001
| Question 1: |
| Is there a more detail drawing available base on existing one page drawing Key note # 1 to replace all roof glazing panels, |
those panels sizes will be hard to find by using takeoff software, east and west panels will be all different sizes and trapezoid shape as well because it’s a pitch roof, besides that there are some electrical and AC duct penetration through the glass that we need more information and required more attention refer to key note #10.
| Answer 1: |
| Contractor shall determine the quantity of glazing panels needed from building dimensions shown on Sheet 1 and the layout of panels shown on Sheet 1. Each panel is 48" wide. |
Regarding penetrations of the greenhouse glazing system:
See Keyed Note #10 for additional information on mechanical / electrical penetrations associated for ECU’s. Contractor shall retain/maintain existing glazing panel(s) where mechanical ductwork, water piping and electrical conduit associated with each ECU penetrates the greenhouse glazing. Contractor shall determine the transition needed from the existing glazing panel to new glazing system to provide water / weather tight installations. Photographs are included in the SOW of these typical penetrations.
See Keyed Note #11 for additional information on roof penetration of piping. Contractor shall remove and replace existing metal closure plate(s) with new and shall provide flashing and associated installations to provide a water / weather tight installations. Contractor shall determine the closure plate and flashing needed to provide the water / weather tight installation. Photographs are included in the SOW of the roof piping penetration.
END