Question: While the specifications state supply, delivery and installation of two new plant growth chambers, it does not specifically state who is responsible for hook-up to the required utilities such as electrical service, cooling water supply, etc. Can this be clarified?

Answer: The supplier would make the required connections/hook-ups. One would be a left hand controller and the other would be a right hand controller.