This solicitation requests proposals for prefabricated bathroom and shower buildings. The Forest Service seeks to award a firm fixed price contract for the delivery, installation, and warranty of precast concrete restroom buildings with men's and women's ADA compliant compartments. Proposals are due by December 2, 2019 and the contract will be set aside for small businesses with less than $10 million in annual revenue. The buildings must meet specifications for plumbing, electrical, and structural design and be delivered to sites within Land Between The Lakes National Recreation Area. The selected contractor must provide a 10-year warranty on concrete components and a one-year warranty on other building elements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Hillman Ferry Campground - Toilet 'A3'.pdf | ||
| Shower Building Specs.docx | DOCX document | |
| Energy Lake Bath house Final dwgs.pdf | ||
| WD.pdf | ||
| 12487020Q0001.pdf | ||
| Solicitation posting.docx | DOCX document | |
| Hillman Ferry Campground - Toilet 'A3'.pdf | ||
| WD.pdf | ||
| Energy Lake Bath house Final dwgs.pdf | ||
| Shower Building Specs.docx | DOCX document | |
| Restroom Specs.docx | DOCX document | |
| Solicitation posting.docx | DOCX document | |
| WD.pdf | ||
| Hillman Ferry Campground - Toilet 'A3'.pdf | ||
| Solicitation posting.docx | DOCX document | |
| Shower Building Specs.docx | DOCX document | |
| Restroom Specs.docx | DOCX document | |
| 12487020Q0001.pdf | ||
| Energy Lake Bath house Final dwgs.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESTROOM BUILDING
1.1 SCOPE OF WORK
The scope of work consists of prefabrication, on-site delivery, off loading and placement of a precast concrete restroom building at a prepared site.
The Contractor shall furnish a pre-assembled precast concrete restroom building. The restroom building shall have one men’s ADA restroom compartment and one women’s ADA restroom compartment. The men’s restroom shall have one ADA toilet, one urinal, and one sink with mirror. The women’s restroom compartment shall have one ADA toilet, one toilet, and one sink with mirror. The building shall have one utility compartment.
The Contractor is responsible for delivery and placing the building on prepared site in accordance with the manufacturer’s recommendations. The Contractor shall provide all necessary openings as specified by the Government in conformance with manufacturer’s structural requirements.
1.2 LOCATION
The project is located within Land Between The Lakes National Recreation Area, 100 Van Morgan Dr, Golden Pond, KY 42211. Site locations and delivery dates are to be determined.
1.3 MANUFACTURER CRITERIA
| A. | ACI-318-02, “Building Code Requirements for Reinforced Concrete”. Concrete Reinforcing Institute, “Manual of Standard Practice”. | |
| B. | ANSI/ASCE-7-02 “Building Code Requirement for Minimum Design Loads in Buildings and Other Structures”. | |
| C. | IBC 2019 | |
| D. | Concrete Reinforcing Institute, “Manual of Standard Practice”. | |
| E. | Fabricator must be plant certified by The Precast/Prestressed Concrete Institute (PCI) and the National Precast Concrete Association (NPCA) or ISO 9001. | |
| G. | Building fabricator must have a minimum of 10 years experience manufacturing and setting transportable precast concrete buildings. | |
| I. | Building shall come with a 10-year warranty. |
1.4 DESIGN CRITERIA
A. Accessibility - Prefabricated flush toilet buildings shall conform to the requirements of the “Uniform Federal Accessibility Standards” (UFAS) and the “Americans with Disabilities Act Accessibility Guidelines” (ADAAG). Buildings shall have full 60-inch turning diameter in each interior and entry area.
B. Plumbing shall be designed in accordance with the International Plumbing Code.
C. Electrical system shall be designed in accordance with the International Electric Code.
Design Loads A. Floor Load: 400psf B. Wind Load: 150 mph C. Snow Load: 350 psf D. Earthquake: Building shall be design to meet IBC 2006 earthquake requirements as stated for the location of the project.
Building Criteria A. Building shall have a women’s and men’s restroom compartment, and utility compartment.
· Women’s Restroom: one ADA toilet, one toilet, and one ADA sink with mirror.
· Men’s Restroom: one ADA toilet, one urinal, and one ADA sink with mirror.
B. The building shall fit within a 26’ x 12’ footprint.
C. The roof shall have an overhang along all sides of the building.
D. Signs indicating Men and Women shall be inset and anchored in the concrete wall near the door. Signs are to have raised pictograms, letters, and Braille to meet ADA.
E. Provide a kick resistant metal louver with integral insect screen. Vent shall be installed in exterior wall of each restroom compartment. Louvers shall have inverted blades to limit vision. Exterior louvers shall be painted to match door color. Vent louvers shall be adjustable.
F. Window frames shall match the door color and shall have a glazing.
G. Paint/Finishes
· Exterior building walls shall be split face block with two tone paint to match existing buildings on site. Contractor shall provide paint color sheets prior to manufacturing the building. Exterior of building shall be coated with one coat of a clear silicone acrylic sealer and anti-graffiti coating.
· All exterior surfaces of the roof panels will be cast to simulate a metal ribbed roof. The underside of the overhang will have a smooth finish. Contractor shall provide paint color sheets prior to manufacturing the building.
· Interior building wall surfaces shall have a smooth concrete finish
· Interior floor and exterior slabs shall be floated and troweled. A light broom finish shall be applied to help create a non-slip surface H. Doors
· Doors and frames shall be fiberglass. Contractor shall provide color options prior to manufacturing. All doors shall have door stops and adjustable door sweeps at the bottom of all doors.
· The doors shall have pull handles. Pull handles shall meet ADA standards. A pull handle shall be placed on the outside of the door, and push plate shall be placed on the inside of the door. The pull handle and push plate shall be stainless steel.
· Deadbolt/Locks shall be Schlage Medium Duty Commercial Grade F Series Full Size Interchangeable Core (7 pin). Locked and unlocked by key from outside and blank on inside.
I. Restroom Compartment/Plumbing
· Plumbing fixtures shall be stainless steel and shall meet ADA requirements.
· Toilets, urinals and sinks shall be vitreous china and shall meet ADA requirements.
· The toilets, urinal, and sinks shall each have an individual water shut off valves to be able to shut off water to the localized area.
· Hose bib shall be available in chase area.
· Exterior frost proof hose bib with box shall be located on the exterior of building.
· Stall and stall doors shall be solid high-density polyethylene. Contractor shall provide available colors.
· Grab bars shall comply with Americans with Disabilities Act (ADA).
· Provide two toilet paper dispenser in each toilet stall. Dispenser will be capable of holding three standard rolls of toilet paper.
· Mirror with integral shelf shall be placed with sink and meeting ADA requirements.
· A double coat hook shall be placed in each toilet stall.
· Paper towel dispenser in each restroom compartment near sink.
· Provide a 4 gallon water heater in chase area.
· Provide a main shut-off valve and drain in the chase area.
J. Electrical
· Provide a 200 amp breaker panel in chase area to meet electrical code requirements.
· Provide a minimum 2500 watt wall heater with temperature controls mounted in each restroom compartment.
· Exterior and interior lighting shall be vandal resistant and LED lights.
· Provide GFI outlets in each restroom compartment and chase area.
1.5 SUBMITTALS
| A. | Engineering calculations that are designed and sealed by a professional engineer, licensed to practice in the state where the project is located, shall be submitted for approval. | |
| B. | Product literature shall be provided for all plumbing and miscellaneous installed fixtures demonstrating compliance with these specifications. | |
| C. | Submit manufacturer’s drawings indicating dimensions of the building layout, specifications, color samples, plumbing and electrical, and roof details prior to bidding. | |
| D. | Contractor shall provide utility blockout location 60 days before delivery. |
INSTALLATION
Site Preparation The Forest Service shall prepare the site prior to building delivery. The Contractor shall provide the Forest Service a detailed plan indicating utility connections and blockout locations.
Access to site The Forest Service shall provide access to the site for installation. It is the responsibility of the Contractor to determine if the access to the site is a sufficient for truck delivery and crane placement for installation. Contractor shall give the Government recommendations for site access needed for installation.
Delivery The Contractor shall deliver and install the building to the site undamaged according to manufacture’s recommendations to prevent damage. The Forest Service is responsible for utility connections at the prepared site.
Warranty Contractor must provide a warranty against defects in material or workmanship for a minimum period of ten (10) years on all concrete components. Contractor shall provide a minimum of a one year item on non-concrete components of the building.