This document is an amendment to Solicitation 12445524Q0118 for the Warren Surge Protector Upgrade at the USDA Forest Service's National Research Station in Irvine, Pennsylvania. The amendment provides additional details related to the meter installation for the project. Specifically, it states that the meter must be relocated outside the building, as required by the local electric company. The amendment adds two attachments - the FirstEnergy Guide for Service and meter installation instructions. All other terms and conditions of the solicitation remain unchanged. The original solicitation was issued as a Request for Quote (RFQ) and is set-aside for small businesses. A site visit is scheduled for August 20-21, 2024. Interested contractors must be active in SAM.gov on the date the quote is received to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to Warren Surge Protector Upgrade - Irvine, PA, newest first.
File Type Posted
Att. 1 Statement of Work 240730.docx DOCX document
Att. 6 Customer-Guide-for-Electric-Service-PA 240904.pdf PDF
Att. 7 Meter installation 240904.pdf PDF
Amendment 0001 240819.pdf PDF
Att. 1 Statement of Work 240730.docx DOCX document
Att. 3 Panelboard Image 240730.pdf PDF
Att. 4 Irvine Forestry Sciences Lab Building Layout 240730.pdf PDF
Att. 5 Wage Determination Warren County 240712.pdf PDF
Att. 2 Electrical Inspection Image 240730.pdf PDF
12445524Q0118 240814.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12445524Q0118 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309-2449

STE 876S

1720 PEACHTREE ST NW

USDA-FS CSA EAST 13

08/14/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/14/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ERIN M. GARCIA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Warren Surge Protector Upgrade.

Amendment 0002 Answers a vendor question from the site visit - Question: Does the meter needs to be relocated outside or can stay on the inside? Answer: The meter needs to be relocated to the outside; COR reached out to Electric Company. They stated conduit has to be cut in the ground outside the building and the wires must enter the meter box outside the building. They cannot come up inside and then go outside to a meter box.

Amendment 0002 adds Att. 6 Customer-Guide-for-Electric-Service-PA 240904 the FirstEnergy

Guide for Service of Section 7 and Att. 7 Meter installation 240904 for meter install.

All other terms and conditions remain the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .