This document is a Statement of Work (SOW) for the Green Mountain National Forest Ripton Barracks South Building Select Interior Demolition and Asbestos Abatement project.
The SOW describes the scope of work, which includes the demolition and disposal of the interior of the Ripton Barracks South Building, including the removal of living quarters, walls, bathrooms, kitchen, doors, heating units, outlets, lighting, ceilings, insulation, and the exterior chimney. It also includes asbestos abatement work to be performed by a certified contractor. The project has an optional bid item to remove and dispose of an attached concrete vault toilet building. The work is to be completed in accordance with federal, state, and local regulations. The project site is located in Ripton, Vermont, approximately 0.8 miles south of the intersection of Vermont Route 125 and Goshen Road. The contractor is responsible for providing all labor, materials, equipment, and supervision necessary to complete the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att_01_Schedule_of_Items_(240417).docx | DOCX document | |
| Ex_A_Hazardous_Waste_Inspection_Report_(191016).pdf | ||
| Sol_12445524Q0055.pdf | ||
| Att_04_Wage_Rates_Windsor_(240105).pdf | ||
| Att_03_Wage_Rates_Addison_(240322).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Green Mountain National Forest
Ripton Barracks South Building Select Interior Demolition and
Asbestos Abatement
STATEMENT OF WORK
1. PROJECT DESCRIPTION
This project is to accomplish the select demolition of the interior of the Ripton Barracks South Building located on the Middlebury Ranger District of the Green Mountain National Forest. The project includes, but is not limited to, the removal and disposal of interior living quarters, interior walls, bathrooms, kitchen, doors, heating units, outlets, lighting, ceilings, insulation, exterior chimney, and asbestos abatement.
Project also includes removing broken windows and installing temporary sheathing to secure the building.
See the General Notes below and Project Plans for additional details.
The project also includes an Optional Bid Item to remove and dispose of the attached concrete single vault toilet building on the exterior of the blacksmith shop. This work includes but is not limited to pumping the holding tank, removing the toilet building (door, framing, siding, roof, insulation, etc), removing the concrete holding tank and pad, and installing new wall framing and siding to match the existing blacksmith shop.
2. LOCATION AND ACCESS
The Ripton Barracks is located 13 Silver Towers Road, Ripton, VT approximately 0.8 miles south from the intersection of Vermont Route 125 and Goshen Road. See Project Map.
The Vault Toilet attached to the blacksmith building is located approximately, 2.9 miles west from the intersection of Vermont Route 100 and Vermont Route 73 in Rochester, VT. Project site is at Latitude:
43.84940, Longitude: -72.85823. See Project Map.
3. SCOPE OF WORK
The contractor shall furnish all labor, materials, equipment, supervision, sampling, notifications, permit fees, and transportation necessary to perform asbestos abatement, clean up and disposal of hazardous materials, demolish and dispose of interior structures in accordance with federal, state and local laws, regulations and ordinances.
PROJECT SPECIFICATIONS
SELECT BUILDING DEMOLITION DETAILS
1. The Contractor shall demolish the building after the asbestos abatement has been accomplished. The
Contractor shall accomplish the demolition, removal, and disposal of select areas within the Ripton Barracks South Building to include, but is not limited to, interior walls, doors, sheetrock, protruding fasteners, insulation, ceilings (framing, ceiling tiles/hangers, etc.), wood framing/trim, kitchen/bathroom plumbing and fixtures, plumbing vent through the roof, sink, refrigerator, counters/cabinets, water heater, heating units and lines, lighting, interior wall outlets, electrical wiring, flooring, and exterior chimney. Electrical wiring from removed lights and outlets shall be removed back to the electrical panel and disconnected.
2. All penetrations though exterior walls and roof shall be patched with building materials to match existing, painted with 2 coats of exterior paint to match existing, and sealed to be watertight. Cut and cap all lines in the concrete floor below grade and fill hole with epoxy grout. All materials shall be approved by the Contracting Officer Representative (COR) prior to installation.
3. Rubbish and debris shall be removed from Government property daily, unless otherwise directed, to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the COR. Debris shall be removed and transported in a manner that prevents spillage on streets or adjacent areas. All loads shall be covered and any additional local regulations regarding hauling and disposal shall apply. All waste material shall become the property of the contractor and shall be removed and disposed of from U.S. Government land at an approved landfill.
4. The Contractor shall remove the glass from 8 exterior windows located on the east and south side of the building. Install T1-11 siding material in place of the glass and secure as required. Paint T1-11 siding with 2 coats of exterior paint to match existing exterior.
5. Electrical service is available on the site. The Contractor may efficiently use this electrical service for work related to this contract at no charge. Contractor shall provide electric generators or other temporary means where electric service is not readily available.
6. Contractor shall be responsible to provide temporary sanitation utilities. Location to be approved by
COR.
7. The Contractor shall provide a project schedule 10 days prior to starting the work. No work shall commence prior to the project schedule being approved by the COR.
8. Areas outside the limits of proposed work disturbed by the contractor’s operations shall be restored by the contractor to their original condition at the contractor’s expense.
ASBESTOS ABATEMENT DETAILS
1. The Contractor shall accomplish the abatement of the asbestos documented on the Hazardous Waste
Inspection Report included in this contract.
2. The Contractor shall apply, obtain, and pay for all related permits and fees required for the abatement of the asbestos.
3. The Contractor shall make all required notifications required for the abatement of the asbestos.
4. The Contractor shall ensure a certified asbestos contractor accomplishes the abatement and provides all required monitoring, testing, and reports.
5. All asbestos abatement work shall be in accordance with the State of Vermont Regulations for Asbestos Control.
OPTIONAL BID ITEM PROJECT DETAILS
1. The Vault Toilet to be removed and disposed of is attached to the exterior of the blacksmith building and is comprised of wood framing, siding, shingles, fiberglass insulation, a toilet, a concrete holding tank and concrete pad.
2. The contractor shall be responsible for pumping the vault prior to removal. The price shall be considered incidental to all other bid items.
3. All soil moving equipment shall be thoroughly cleaned to make it free of soil, non-native invasive species or other debris that could contain or hold seeds prior to being delivered to the project site.
Equipment shall be considered free of non-native or invasive species and other such debris when a visual inspection by the C.O.R, completed prior to the equipment being moved to the site, does not disclose such material present.
4. Areas outside the limits of proposed work disturbed by the contractor’s operations shall be restored by the contractor to their original condition at the contractor’s expense.
5. All waste material other than fill material shall become the property of the contractor and shall be disposed of off U.S. Government (National Forest) land. Any fill material removed shall be stockpiled for later use.
6. Contractor shall backfill hole of removed vault with sand or similar material approved by the C.O.R. to within 6” of the adjacent grade. Compact backfill in 12” lifts. Place 6” topsoil to match the adjacent grade around the removed vault. Place seed and straw over topsoil. Seed to be approved by the C.O.R.
Vault Toilet
United States Department of Agriculture Forest Service
2/2 7/2
4 1 3:
K
AT
HE
RI
NE
DE
FA
YE
TT
E C:
\U
SE
RS
\K
AT
HE
RI
NE
DE
FA
YE
TT
E\
BO
X\
EN
GI
NE
ER
IN
G\
EN
GI
NE
ER
IN
GO
PE
RA
TI
ON
S\
P
RO
JE
CT
S\
GM
NF
\F
R7 3 &
F R2
B
RI
DG
E W
EA
R
SU
RF
AC
E
RE
SE
T\
CO
VE
R.
DW
G;
STATE OF VERMONT
ADDISON & WINDSOR COUNTY
R-09 EASTERN REGION
GREEN MOUNTAIN NATIONAL FOREST
ROCHESTER RANGER DISTRICT
RIPTON BARRACKS SOUTH
BUILDING SELECT INTERIOR
DEMOLITION AND ASBESTOS
ABATEMENT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-1 COVER SHEET 3/20/2024
C-1 DEMOLITION DETAILS 3/20/2024
C-2 BUILDING LOCATION MAPS 3/20/2024
PROJECT LOCATION MAP
NOT TO SCALE
SHEET 1 OF 3
G oshen R oad
Old Tow n Road
M ai de n
La ne
Ripton Barracks
KatherineDefayette Line
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
3/1 3/2
4 0 7:
K
AT
HE
RI
NE
DE
FA
YE
TT
E C:
\U
SE
RS
\K
AT
HE
RI
NE
DE
FA
YE
TT
E\
BO
X\
EN
GI
NE
ER
IN
G\
EN
GI
NE
ER
IN
GO
PE
RA
TI
ON
S\
P
RO
JE
CT
S\
GM
NF
\F
R7 3 &
F R2
B
RI
DG
E
DE
FE
RR
ED
M
TC
\A
CA
D\
NO
TE
S.
DW
G;
R-09
EASTERN REGION
RIPTON BARRACKS
SOUTH BUILDING
SELECT INTERIOR
DEMOLITION AND
ASBESTOS
ABATEMENT
GREEN MOUNTAIN
NATIONAL FOREST
ROCHESTER RANGER DISTRICT
07/26/2022
K. DEFAYETTE
K. DEFAYETTE
D. DONAHUE
C-01
REMOVE THE GLASS
FROM 8 EXTERIOR
WINDOWS. SECURE T1-11
SIDING MATERIAL IN
PLACE OF GLASS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
KatherineDefayette Text Box
SHEET 2 OF 3
KatherineDefayette Text Box C-1
KatherineDefayette Text Box
DEMOLITION DETAILS
KatherineDefayette Rectangle
KatherineDefayette Rectangle
KatherineDefayette Line
KatherineDefayette Line
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
United States Department of Agriculture Forest Service
3/1 3/2
4 0 7:
K
AT
HE
RI
NE
DE
FA
YE
TT
E C:
\U
SE
RS
\K
AT
HE
RI
NE
DE
FA
YE
TT
E\
BO
X\
EN
GI
NE
ER
IN
G\
EN
GI
NE
ER
IN
GO
PE
RA
TI
ON
S\
P
RO
JE
CT
S\
GM
NF
\F
R7 3 &
F R2
B
RI
DG
E
DE
FE
RR
ED
M
TC
\A
CA
D\
NO
TE
S.
DW
G;
R-09
EASTERN REGION
RIPTON BARRACKS
SOUTH BUILDING
SELECT INTERIOR
DEMOTLITION AND
ASBESTOS
ABATEMENT
GREEN MOUNTAIN
NATIONAL FOREST
ROCHESTER RANGER DISTRICT
07/26/2022
K. DEFAYETTE
K. DEFAYETTE
D. DONAHUE
C-01
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
KatherineDefayette Text Box C-2
KatherineDefayette Text Box
SHEET 3 OF 3
KatherineDefayette Text Box
BUILDING LOCATION MAPS
| Ripton Demo_Project Loc Map.pdf |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| FR264 map&worklist.pdf |
| Sheets and Views |
| PLOT |
| GMNF_FR264_DETAILS A.pdf |
| Sheets and Views |
| PLOT |
| FR73 map&worklist.pdf |
| Sheets and Views |
| PLOT |
| Details FR73.pdf |
| Sheets and Views |
| PLOT |
| GMNF_FR73 & 264 SIGN.pdf |
| Sheets and Views |
| PLOT |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| GMNF_FR73 & 264 Bridge Improvements_Sign Detail.pdf |
| Sheets and Views |
| C-04 |
| OLE1 |
| Notes-NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| Notes-NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| C-1 Notes.pdf |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| FR264 map&worklist.pdf |
| Sheets and Views |
| PLOT |
| GMNF_FR264_DETAILS A.pdf |
| Sheets and Views |
| PLOT |
| FR73 map&worklist.pdf |
| Sheets and Views |
| PLOT |
| Details FR73.pdf |
| Sheets and Views |
| PLOT |
| GMNF_FR73 & 264 SIGN.pdf |
| Sheets and Views |
| PLOT |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| FR73 &264 NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| GMNF_FR73 & 264 Bridge Improvements_Sign Detail.pdf |
| Sheets and Views |
| C-04 |
| OLE1 |
| Notes-NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| Notes-NOTES.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| C-2 Project Location Maps .pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| C-3 264 Details.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| 73.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| C-5 signs.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
| C-1 Notes.pdf |
| Sheets and Views |
| NOTES |
| OLE1 |
File details come from the government source that posted it. Updated .