Att_02_Scope_of_Work_(240417)_0001.pdf
PDF 1 MB Posted
- Attached to
- SUF Lacroix access control system Federal contract opportunity
- Solicitation number
- 12445524Q0050
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the Superior National Forest LaCroix Access Control System project. The project scope includes the design, supply, and installation of an access control system and a security camera system at the LaCroix Ranger District office and garages.
The key requirements include removing the existing access control and camera systems, installing new systems with components from pre-approved manufacturers such as Honeywell and Allegion, providing access key cards/fobs, and training government personnel on system operation and maintenance. The project has a 90-calendar day delivery period after contract award. The contractor is responsible for ensuring compliance with applicable codes and standards, obtaining necessary permits, coordinating site access, and adhering to safety and quality control requirements. Submittals, project meetings, and progress payments are also detailed in the SOW.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ex_A_Floor_Plan_(240416)_0001.pdf | ||
| Sol_12445524Q0050_Amd_0001.pdf | ||
| Pre_Quote_Attendees_List_(240416)_0001.pdf | ||
| Att_01_Schedule_of_Items_(240408).docx | DOCX document | |
| Att_03_Wage_Rates_(240322).pdf | ||
| Att_02_Scope_of_Work_(240403).pdf | ||
| Sol_12445524Q0050.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPERIOR NATIONAL FOREST
LaCroix Access Control System
PROJECT STATEMENT OF WORK (SOW)
LaCroix Ranger District
Table of Contents
1.0 PROJECT OVERVIEW
1.1 Scope
1.2 Funding Limitations
1.3 Location
1.4 Background
1.5 Definition of “Days” within the Statement of Work (SOW)
1.6 Project Schedule
1.7 Contact Information
1.8 Requirements for the Project Files, Project Management, and Communications
2.0 GENERAL REQUIREMENTS
2.1 Scope of Work Summary
2.2 Applicable Codes
2.3 Progress Payments
2.4 Project Meetings
2.5 Contractor’s Project Schedule
2.6 Submittals
3.0 DETAIL REQUIREMENTS BY WORK ITEM
3.1 Products
3.2 Work Item Descriptions
3.3 Submittals
4.0 SPECIFIC PROJECT REQUIREMENTS
4.1 Safety
4.2 Superintendence by the Contractor
4.3 Closure of Site
5.0 ADDITIONAL REQUIREMENTS
5.1 Site Access
5.2 Work Hour Restrictions
5.3 Quality Control
5.4 Hazard Control
5.5 Construction Impacts
5.6 Patching, Cutting, and Repair to Damaged Areas
5.7 House Keeping
5.8 Project Closeout
5.9 Final Inspection
7.0 ATTACHMENTS
1.0 PROJECT OVERVIEW
1.1 Scope
In accordance with the terms and conditions of the Contract, the Contractor shall perform the work of this Statement of Work (SOW) for the USDA-Forest Service (FS) as described below.
The Contractor shall perform design, supply, and installation services in accordance with the requirements within the contract.
The Contractor shall perform all services necessary to produce a complete and usable project in accordance with the project goals and design intent stated herein.
1.2 Funding Limitations
The Contractor is responsible for providing all design and installation services required for the final total lump-sum firm-fixed amount as bid by the Contractor.
1.3 Location
This project is located at:
LaCroix Ranger District
320 North Highway 53 Cook, MN 55723
1.4 Background
The LaCroix Ranger District Office has an outdated access control and camera security systems. The current systems are obsolete, malfunction periodically, and need to be upgraded to provide enhanced building security and user access.
1.5 Definition of “Days” within the Statement of Work (SOW)
Unless stated elsewhere number of days equals number of calendar days.
1.6 Project Schedule
The Project shall have a single installation phase unless approved by the CO. The Contractor shall submit a project schedule to the government for consideration and approval prior to receiving a notice to proceed. The project delivery date is 90 calendar days after the award of the contract. It is expected that the Contractor shall have all phases of work complete within this time frame.
1.7 Contact Information
Contracting Officer (CO): PPS Contracting Officer Assigned
Project Manager (PM) and CO’s Representative (COR):
James Anderson, West Zone Facilities Civil Engineering Technician Phone: 218-365-2044 Email: james.b.anderson@usda.gov Address: 1393 Highway 169, Ely, MN 55731
1.8 Requirements for the Project Files, Project Management, and Communications
All process documents submitted shall be PDF format via email.
mailto:james.b.anderson@usda.gov
2.0 GENERAL REQUIREMENTS
2.1 Scope of Work Summary
The project includes the design, supply, and installation of an access control system at the LaCroix Ranger District office and garages. Worked involved will consist of removal and disposal of the existing access control system components, and installing the new system, including new control panels, connecting key card readers in new and current locations, providing system software programming upgrades, and replacing, repairing, and installing door hardware such as, but not limited to, door strikes, door frame components, and door latches, where necessary, and providing a supply of access key cards/fobs.
The project also includes the design, supply, and installation of a camera security system in the LaCroix Ranger District office building. Work will consist of removal of the existing system components and installation of the new system.
Additionally, after upgrades are complete, the contractor shall provide training and demonstrate to FS personnel how the access control system and security camera system function and are programmed and maintained.
2.2 Applicable Codes
All work in this contract shall be done in accordance with the following in their most current edition:
1. National Fire Protection Association (NFPA)
2. OSHA – Occupational Safety and Health Act
3. IBC 2018 – International Building Codes 2018 Edition
4. NEC 2017 – National Electric Code 2017 Edition
5. ABAAS – Architectural Barriers Act Accessibility Standard
6. ADA – Americans with Disabilities Act
7. Forest Service Outdoor Recreation Accessibility Guide (FSORAG)
8. All local safety and fire regulations.
9. All manufacturer installation instructions.
10. All other codes and standards referenced in the specifications.
Contractor is responsible for acquiring any applicable building permits if required due to Local, State, or Federal codes.
The contractor shall be responsible for the conditions and proper relation of their work to the site conditions and will familiarize themselves with all details of the work and working conditions. The contractor shall verify all quantities in the field and generate their own quantities for work provided. Any and all incidental items not specifically listed in this contract are to be included in the bid to provide the Government with a finished operating end product.
2.3 Progress Payments
All Contractor payment shall be based on the base contract and FAR clauses. These payments for completed work shall be based on COR observation & approval, and the Schedule of Items. The CO shall specify the required submission documents to accompany any request for payment.
2.3.1 Schedule of Items
The total cost of all items shall equal the contract sum. The Schedule of Items will form the basis for progress payments.
2.4 Project Meetings
2.4.1 Pre-Bid Meeting
A pre-bid meeting for this contract is required. The CO shall setup a pre-bid meeting with interested bidders to take place during the solicitation phase. The pre-bid meeting shall consist of a Site Visit to the project site so that the Scope of Work can be clarified in its entirety and to address any concerns interested bidders may have.
2.4.2 Pre-Construction Meeting
The CO shall setup a pre-construction meeting with contractor after award. The Contractor shall be responsible for certain administrative functions having to do with all correspondence and meetings to be determined later (submittals, schedules, observations, and administrative duties) as determined by the CO. Payrolls and other construction administration documentation shall be required to be prepared by the Contractor.
2.5 Contractor’s Project Schedule
The Contractor shall provide a Project schedule for the design and installation phases of the entire contract period within 3 weeks after award. This schedule shall be updated at intervals required by the CO. The CO shall approve and augment the Contractor’s schedule to accommodate Government needs and processes for this contract.
2.6 Submittals
2.6.1 Submittal Register
Submittals for this contract shall be assembled into a submittal register or checklist by the contractor. This checklist shall be used to track manufacturer data, warranties, shop drawings, etc., for all products.
Manufacturer’s recommended installation procedures and Manufacturer’s Industry Standard shall be the basis of how products and materials are installed in addition to building and accessibility codes. It is strongly encouraged that the Contractor provide the manufacturer’s recommended installation instruction or manual for each submittal and process. If the proper installation criteria are not provided, then the CO/COR will rely on the manufacturer’s web-based material or manufacturer provided documentation as the source of installation validation. No product, material, or system shall be installed without approved documentation by the CO. They shall hold the Contractor to these installation standards in construction if there is not a procedural standard for this work.
2.6.2 Submittals Distribution and Format
A. Submittals:
1. All submittals shall be e-mailed to the COR. Other formats may be approved by the COR.
2.6.3 Submittal Procedures
Each submittal shall be numbered in the order of the submittal register. The Contractor shall stamp and sign the transmittal cover sheet and initial each page of the submittal for quality control assurance. The COR shall have 10 days to review and return submittals to the Contractor. The Contractor can request a faster turnaround on specific submittals in writing if warranted.
The CO/COR oversight is for quality assurance only and compliance with contract requirements. The Contractor is fully responsible and liable for construction applications, technical considerations, and use of products for the intended application.
2.6.4 Substitution
Substitutions are acceptable if approved by designer (email or signature) and appropriate documentation is given to the CO/COR to review. This process requires contacting the COR, specifying the changes, and allowing him to request the proper information he will need to evaluate the change. Submitting documentation directly to COR without prior discussions may cause additional delays in acceptance. A minimum of 2 weeks is required for any substitution, but more time may be needed depending on CO requirements.
3.0 DETAIL REQUIREMENTS BY WORK ITEM
3.1 Products
The access control system installed shall be a product of the following pre-approved manufacturers.
• Honeywell
• Allegion
Any other products intended for use shall be pre-approved and authorized by CO/COR prior to bidding and work commencing.
The system shall have the ability for Forest Service personnel to program credentials to individual entry readers, schedule lock and unlocking times, and the option to set access to “open” for delivery purposes.
The security camera system shall be made of components that are American made.
Cameras shall be a minimum of 5 MP with infrared capabilities to record at night. DVR shall be capable of holding 2 TB of data and have capacity for 8 channels. Outdoor cameras shall be weatherproof and rated for temperatures down to -40F.
3.2 Work Item Descriptions
Item #1 - LaCroix Ranger District Office Access Control System Upgrade and Installation
There is a total of 3 entrances that require an updated access control system. 2 exterior doors and 1 interior door have an existing access control system that need updating.
The current access control system for the three entrances consists of a XR550 with three door controllers, and Honeywell mini mullion omniprox card readers with electronic door strikes. Work involved for these 3 entrances is as listed below.
• Remove existing key card readers.
• Replace and install new card readers.
• Upgrade electronic lock hardware.
Seventy five (75) access key cards/fobs shall be supplied for users.
Item #2 - LaCroix Ranger District Garages Access Control Installation
The fire cache garage will need access control installed at 1 entrance and the workshop garage will need access control installed at 2 entrances for a total of 3 entrances. Neither garage has an access control system installed and will require new installation. Work involved for these 3 doors is as listed below.
• Install new access control system.
Item #3 - LaCroix Ranger District Office Security Camera System Upgrade and Installation
There is a total of two exterior entrances that require new installations of a wired (5 MP minimum) camera at each location. The 2 exterior cameras shall be weatherproof and capable of withstanding temperatures down to -40F. Exterior cameras shall also be capable of infrared video for night recording. Additionally, a single 360 degree, wired, fisheye (5 MP minimum) camera shall be installed in the lobby area of the LaCroix office.
Camera shall be capable of infrared video for night recording and installed to capture the entire lobby area including entrance door and reception desk. Work involved for the security system is as listed below.
• Remove existing security camera system.
• Install new security camera system.
After installation, the Contractor shall demonstrate the access control system and security camera system and train Government personnel involved in operating, troubleshooting, servicing, and preventive maintaining of the system.
3.3 Submittals
See Section 2.6 for submittal procedures.
Shop Drawings: Provide Product Data. Provide floor plan indicating locations of all devices. Provide system wiring diagram showing each device and wiring connection required.
Product Data: Provide electrical characteristics and connection requirements.
Project Record Documents: Record actual locations of all devices and cable/conduit routing.
Operation & Maintenance Manual:
1. Include full instructions on servicing and maintenance requirements.
2. Include operating instructions including start up, seasonal servicing, etc.
3. Include owner's manuals for each item of equipment.
4. Include all equipment wiring diagrams.
5. Include a copy of the existing system wiring diagram and the interconnection of the new system devices to the existing system.
6. Include full parts lists and exploded schematic diagrams.
7. Include full warranty information.
8. Include all available manufacturer installation and O&M manuals.
9. Include full names, addresses, phone numbers, suppliers, service companies, contract numbers and other points of contact/information relative to the job.
10. Include approved shop drawings and other as-build information.
4.0 SPECIFIC PROJECT REQUIREMENTS
4.1 Safety
The Contractor shall comply with all Federal and State safety requirements for the type of work to be performed. Refer to the Occupation Safety and Health Standards (OSHA) for details of these and other safety requirements.
4.2 Superintendence by the Contractor
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work and have on the project site a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. Superintendent must be designated in writing to CO/COR. Notify the CO/COR at least 10 workdays in advance of any subsequent change of personnel in this position. Replacement personnel shall have the same level or better experience as the person being replaced.
4.3 Closure of Site
The contractor shall be responsible for closing the immediate vicinity of the project area during work actives that may be dangerous for members of the general public.
5.0 ADDITIONAL REQUIREMENTS
5.1 Site Access
The Contractor shall coordinate access needs and construction efforts with the COR such that there is minimal impact to the work of Forest Service personnel. It is the Contractor’s responsibility to perform the work in a manner that does not interfere with Government operations.
5.2 Work Hour Restrictions
All work and deliveries shall be limited to the weekday hours of 8:00 am to 4:30 pm unless otherwise approved by the COR. No work shall occur on Federal holidays or weekends without prior approval.
5.3 Quality Control
The quality of all work shall be the responsibility of the Contractor. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
Failure to provide adequate quality control will result in retention and other contract actions.
5.4 Hazard Control
Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.
5.4.1 Smoking
Smoking inside Forest Service buildings is prohibited. Cigarette butts shall not be discarded on the ground.
5.4.2 Welding
Cutting by torch, welding or metal grinding shall be performed only when adequate fire protection is provided. Prior to performing any welding, cutting, grinding or other activities generating spark or fire hazards, the project superintendent and work supervisor shall meet with the COR representative and discuss and agree to a fire protection plan.
5.5 Construction Impacts
The Contractor shall take all precautions necessary to minimize and restore all construction impacts. All existing work and conditions impacted or modified by the contractor shall be replaced with like kind at the contractor’s expense.
5.6 Patching, Cutting, and Repair to Damaged Areas
All cutting, patching and repairs on systems shall be coordinated with COR at the weekly construction meeting in advance of the work. The Contractor is responsible to fix, and repair affected areas on un-approved work to the original condition or better.
5.7 House Keeping
Keep project neat, orderly, and in a safe condition at all times. At the end of the work week a more through cleanup and policing shall be performed. All debris shall be removed and properly disposed. Any materials that are removed as part of the construction operations, and that are not reused or salvaged as Government property, shall become the property of the Contractor, and shall be removed from the site.
5.8 Project Closeout
Before submitting a request for final inspection, submit the following:
Payment
The quantities shall be paid for as lump sum quantities or by other methods of measure as listed in the Schedule of Items. Such payment shall be considered full compensation for constructing the complete project in accordance with the plans and specifications. The availability of progress payments shall be determined by the CO. The invoice must be inputted into the IPP System.
Additional documents required to be prior to final invoice processing are:
Certified Payroll
Contract Release Form
Final payment will not be processed until all required documents have been received by the CO.
5.9 Final Inspection
Cleaning: Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Thoroughly clean building interior affected by the work. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
Process Description: Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. The COR, commissioning agent, and Contractor will proceed with the inspection within 10 days of receipt of request. The COR will prepare a list of deficiencies ("Punch List") to be corrected before final acceptance.
The Contractor shall complete the work described on the list punch list within 14 calendar days. If the Contractor fails to complete the work within this time frame, the COR may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
7.0 ATTACHMENTS
Exterior Office Doors for Access Control and Camera System
Interior Office Door for Access Control System
Garage Entrances for Access Control System
Lobby Area for Fisheye Camera and Current Honeywell Fob Reader
| 1.0 PROJECT OVERVIEW |
| 1.1 Scope |
| 1.2 Funding Limitations |
| 1.3 Location |
| 1.4 Background |
| 1.5 Definition of “Days” within the Statement of Work (SOW) |
| 1.6 Project Schedule |
| 1.7 Contact Information |
| 1.8 Requirements for the Project Files, Project Management, and Communications |
| 2.0 GENERAL REQUIREMENTS |
| 2.1 Scope of Work Summary |
| 2.2 Applicable Codes |
| 2.3 Progress Payments |
| 2.3.1 Schedule of Items |
| 2.4 Project Meetings |
| 2.4.1 Pre-Bid Meeting |
| 2.4.2 Pre-Construction Meeting |
| 2.5 Contractor’s Project Schedule |
| 2.6 Submittals |
| 2.6.1 Submittal Register |
| 2.6.2 Submittals Distribution and Format |
| 2.6.3 Submittal Procedures |
| 2.6.4 Substitution |
| 3.0 DETAIL REQUIREMENTS BY WORK ITEM |
| 3.1 Products |
| 3.2 Work Item Descriptions |
| Item #1 - LaCroix Ranger District Office Access Control System Upgrade and Installation |
| Item #2 - LaCroix Ranger District Garages Access Control Installation |
| Item #3 - LaCroix Ranger District Office Security Camera System Upgrade and Installation |
3.3 Submittals
| 4.0 SPECIFIC PROJECT REQUIREMENTS |
| 4.1 Safety |
| 4.2 Superintendence by the Contractor |
| 4.3 Closure of Site |
| 5.0 ADDITIONAL REQUIREMENTS |
| 5.1 Site Access |
| 5.2 Work Hour Restrictions |
| 5.3 Quality Control |
| 5.4 Hazard Control |
| 5.4.1 Smoking |
| 5.4.2 Welding |
| 5.5 Construction Impacts |
| 5.6 Patching, Cutting, and Repair to Damaged Areas |
| 5.7 House Keeping |
| 5.8 Project Closeout |
| 5.9 Final Inspection |
7.0 ATTACHMENTS
File details come from the government source that posted it. Updated .